鉆孔井 的英文怎麼說

中文拼音 [zhēnkǒngjǐng]
鉆孔井 英文
bore well
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    彩色電視壁成像系統、直接橫波測研究偶極子下聲系和聲波儀、多點滲壓儀及壓模系統、巖質高邊坡快速攝像微機地質素描成圖、層析成像技術、近壩庫段安全監測技術、邊坡監測數據處理預報軟體研究、高精度大地測量監測自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。
  2. The practice of grout solidifying and caulking of the underground hydrology drill after water outburst

    下水文涌水后注漿固與堵水實踐
  3. When it has been decided where we are going to drill, we put up at the surface an oil derrick.

    決定了位置后,我們就在地面上豎起架。
  4. Harness technology for karst water in ordovician limestone with underground grouting of hole

    注漿治理奧灰水技術
  5. 176 drillholes, 9 coreholes, 178 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works along tuen mun road

    176個, 9個土芯, 178個探,重整48個豎管測壓計及一系列的土壤和巖石樣本的實驗室試驗。
  6. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個, 250個探,重整48個豎管測壓計,將所取得的土壤和巖石樣本進行實驗室試驗,以及對屯門公路上現有的公路建築物進行結構狀況勘測。
  7. The construction methods and caving protection measures for punching high thick and loosen soft coal seam in luling coal mine no. 2 dark tilt well in huaibei coal mine area are introducded. they include small section enlarged after the heading caving, high negative pressure and multi - raw drilling holes and strenous drawing - off, concentrated cross drill holes, cutting while drawing - off and putting the metal frame away

    介紹了淮北礦區蘆嶺煤礦2主暗斜採用小斷面導硐后刷大、高負壓多排強抽,密集交叉邊掘邊抽及設置金屬骨架施工方法和防突措施揭穿高突特厚松軟煤層。
  8. In order to ensure the safety of engineering, it should be careful to use the test result of normal drilling sampling, the pitting sampling, shaft sampling, or double - tubles and thin - wall soil collecting methods should be used

    為保證工程安全,對常規取樣試驗成果的使用應當慎重,對重要工程宜採用探坑、豎取樣,或採用雙筒薄壁取土技術。
  9. Temperature logs in bore holes down to several thousand metres are made by cable probes.

    幾千米用的溫度測裝置是用電覽探頭做的。
  10. Gas drainage from underground mine with 1000m branched long holes along seam

    煤礦下順煤層千米枝狀長抽采瓦斯技術
  11. It is this water, called ground water, which is found in wells, in borings, and in springs.

    這種水就叫做地下水,在水和噴泉里都能見到。
  12. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁鋼沉圍堰樁基礎,鋼圍堰在橋梁基礎施工中的應用越來越多。
  13. The hole was lined with a steel tube to prevent the walls from falling in.

    用一根鋼管給加襯,以防壁坍塌。
  14. The basic conditions of verifying bore in wutunsuo mine, plans of rectifying deviation, installation and use of mwd directional drilling system, and problems encountered in construction are narrated

    摘要敘述了武所屯的基本情況,糾斜方案, mwd定向進系統安裝與使用以及施工中遇到的問題和解決辦法。
  15. The machine can adopt positive and negative circulation and other deep drilling technique, adapts to various stratum, is the first selected equipment for foundation construction of river ' s bridge and dock, and also adapts to large diameter borehole construction such as tall building, coal mine vertical well and sewage well, it exerts great action many changjiang river large scale bridges foundation construction

    該機可採用正反循環等進工藝施工,適合於各種地層,是江河橋梁、碼頭基礎施工的首選設備,也適用於高層建築、煤礦豎和污水等大口徑施工,在多座長江大型橋梁基礎施工中發揮了巨大作用。
  16. Application of the borehole discharging waste extension method in developing shaft in junde coal mine

    卸矸延深法在峻德煤礦筒延深中的應用
  17. The moving velocity in the vetical direction of the saline water was determined by comparison of buried depth saline water in observation wells at different period with distrabution of dring wells

    垂向運移特徵系根據油田勘探開發過程中的分佈特點,通過對各地區,不同時間段資料中鹹水體埋深變化比較,確定不同地區鹹水體的垂向運移速率。
  18. Measures adopted to strongly wash shaft

    泥漿進的強化洗應採取的措施
  19. Such drilling technology is untested, and digging these wells will require expert guidance

    這種技術還未經過測試,開鑿這樣的也需要專業指導。
  20. This drill adopts the deep drilling technique of positive and negative circulation, the efficiency of deep drilling is high, and applies to various stratum, is the first selected equipment for the basic construction of river bridge and dock, and also applies to drilling project of high building and heavy caliber shallow well

    該機採用正反循環進工藝,進效率高,適用於各種地層,是江河橋梁、碼頭基礎施工的首選設備,也適用於高層建築及大口徑淺水工程。
分享友人