鉆孔方向 的英文怎麼說

中文拼音 [zhēnkǒngfāngxiàng]
鉆孔方向 英文
boring direction
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • 方向 : direction; orientation
  1. Secondly, programmed the image processing arithmetic code which include the bottom arithmetic for the general condition comprises threshold division, region combination and informate and the middle level arithmetic for the given task comprises detecting the line dation creirection according to the hough transform in order to fix on the hole ’ s azimuth angle, detecting the aiguille tip position according to the image movement according to the environment and the image format

    然後,根據目標環境要求和攝像機採集圖像格式,開發了圖像處理演算法程序。圖像處理演算法包括底層演算法和中層演算法兩部分,底層演算法針對通用情況,包括閾值分割、區域合併和信息生成。中層演算法針對具體任務設計,包括利用hough變換檢測棱線的,從而確定圓位角和利用基於圖像運動檢測頭尖端位置。
  2. It adopts computer digital controlled system plc orientation mo dule touch scerrn to control, realizing x z w axis direction s precise orientation by ac servo system. in actual operation, just put the glass on the transmission belt, input drilling position data on the screen, press the start button, the machine will automatically position itself and finish all drilling operations, and automatically stop when the works is completed. this machine s two group drilling heads can work at the same time, one group drilling head is also ok. this machine has high drilling efficiency and accurate position, is an ideal choiceness equiment of scree - wall glass and other large specand volume production glass drilling

    該機採用計算機數控系統plc定位模塊觸摸顯示屏控制,由交流伺服系統實現x z w軸三個的精確定位。操作時只需將玻璃放在傳送帶上,在顯示屏上輸入位置,按啟動按鈕,自動定位削所有位,完成工作后自動停機。本機兩組機頭可以同時工作,也可以單組機頭工作。
  3. A patch antenna with air holes in the substrate has been designed. the finite - difference time - domain ( fdtd ) method together with the perfectly matched layer ( pml ) boundary treatment has been used to study the performance of the antenna. it is shown that the surface waves are significiently suppressed, the frequency bandwidth is improved, the sidelobe levels are reduced and consequently the gain in the forward direction is improved by 14 db ( about 4 db higher than the value reported previously )

    設計了一種基底周期圓結構的電磁(光子)晶體貼片天線,用fdtd法並結合pml吸收邊界條件對該天線進行了研究,結果表明本文所設計的基底型電磁晶體貼片天線取得了多面的性能改善,與普通天線相比,基底中的表面波受到很大抑制,天線的帶寬增加,遠場圖上天線的旁瓣和背瓣被明顯削弱,前輻射的增益由原來的12db增加到26db ,增加了14db ,比文獻上報道的gonzalo等人的研究結果提高了4db 。
  4. Comprehensive gas drainage method with long directional drilling hole

    綜合抽放瓦斯
  5. If using this method, be sure to punch the holes from the opposite side and snip off the punched pieces of lead to avoid having them come loose inside the frame

    如果使用這個法,一定要確定時要從外拍框內拍框打,謹防避震條下的部分進入拍體。
  6. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中樁提高承載力的研究」 ,所做的研究工作主要在以下三個面:一是根據8根樁身內埋設量測元件試樁的單樁豎靜載荷試驗資料,分析了各試驗樁特別是常規沖灌注嵌巖樁在昔格達泥巖中的軸力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖灌注嵌巖樁的側摩阻和端阻的計算法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  7. The basic conditions of verifying bore in wutunsuo mine, plans of rectifying deviation, installation and use of mwd directional drilling system, and problems encountered in construction are narrated

    摘要敘述了武所屯井檢的基本情況,糾斜案, mwd定進系統安裝與使用以及施工中遇到的問題和解決辦法。
  8. The performance of the pbg antenna using the new pbg cover together with a pbg substrate is studied by the fdtd method together with the pml boundary treatment. the numerical results show that a more focused beam radiated in the broadside direction is achieved. the gain of the pbg patch antenna in the forward direction is improved by about 6 db. the radiation directivity is improved significantly and reaches 11. 5 db, which is 0. 4 db less than the maximum value that is allowed physically for this size of the antenna ( this difference is about 4. 1 db less than the difference achieved by thevenot et al.,

    用fdtd法並結合pml吸收邊界條件,我們對加了這種新的覆層結構並且基底的復合結構電磁(光子)晶體貼片天線的性能進行了研究,結果證明加了這種新的電磁晶體覆層結構以後,天線的波束收攏很多,並且前輻射的增益大大提高,與普通天線相比,天線的e面和h面圖上前輻射的增益均提高了約6db ,另外,該復合結構天線的性系數達到了11 . 5浙江大學博士學位論文db ,與該物理尺寸天線的性系數的理論極限值( 11 . 9db )相差0 . 4db ,該差值比thevenot等人設計的電磁晶體覆層天線的相應差值減少了約4 . 1db ,比qiu等人設計的電磁晶體天線的相應差值減少了約1
  9. Abstract : artifical intelligence methods are implemented to simulate thebehaviors of axially and laterally loaded piles using the field observation tests data obtain ed f rom the drilled shafts and driven piles. the optimal neural network model is deve loped using only simple input data of spt - n values and piles ' geometrical featu r es etc. the analysis for r. c piles of some projects is performed adopting the bp n n and grnn models respectively, and the obtained predicated results are compared w ith the data from conventional design method. it demonstrated the obvious advanta ges of neural networks in the design of pile foundations over the traditional me thods. this paper has an important practical significance and a referential worth iness in the design of pile foundations

    文摘:根據樁和打擊樁的原型試驗觀測的數據,運用人工智慧法對橫承載樁和軸承載樁的工作特性進行模擬,並利用標準貫入試驗( spt - n )值和樁的幾何特性等簡單的輸入數據,開發出相應的優化神經網路模型;然後,運用反傳播神經網路模型和廣義回歸神經網路模型分別對某工程的鋼筋混凝土樁進行分析,並將求得的預測結果與常規設計法的結果進行比較,結果表明神經網路法比傳統法有明顯的優越性,在實際工程設計中具有重要的參考價值和現實意義。
  10. The construction technique in question is applicable to the river reach where water current directions and water levels are varying and to the construction of bored piles and elevated pile caps for deep water foundations of major bridges over river and sea in the offshore area

    本項新技術可運用於水流多變、水位變化大的河段及近海跨江跨海特大型橋梁深水基礎樁及高樁承臺施工。
  11. Science orientation, leading technology, pragmatic development and quality first are the business tent of the company. gone through 15 years development, the company has developed eight different series and over 30 varieties of product models including straight - line double edge serial, straight - line single edge maching serial, straight - line single round - edge maching serial, auto manual shape bevellers series, automatically vertical and horizontal drilling maching serial and cleaning maching serial etc. the company is also able to design production line for customer, and be able to evaluate, design and building processing workshop for customer. innovation gets rid of stale products and brings forth new products, occupying the leading position in international market and domestic market with their good and perfect service. the company has passed the cetification of iso9001 : 2000 and ce authentiaction. practice strictly quality control in product production, product design seedks after concisions and reliability easy for operation and maintenance with reasonable price performance ratio for complete set fo machinge and cost effective for customer in prophase investment and post - phase investment, and become the advocator for economization, " man - machinge communication, unrestrained and far - ranging " suntech machinery company has provided broad space for customer to purchase equipment

    億海機械製造有限公司原新海岸創立於1991年,佔地6萬平米,現有員工五百人,是一家專業生產玻璃深加工設備的企業,集技術開發規模生產,售前售後的技術培圳於一體。 「科技導技術領先務實發展質量第一」 ,是億海公司的經營宗旨。經過十五年的發展,現在八大系列,三十多種機型的產品,包括直線雙邊機系列,直線雙圓邊機系列,斜邊機系列,直線單邊機系列,直線單圓邊機系列,自動立式臥式機系列,清洗機系列等,公司還具備為客戶設計生產連線,為客戶評估設計購建加工車間等。
  12. Simulation method on directional drilling - hole course

    軌跡的模擬
  13. Nakano forging employs a sub press to carry out stamp forging of brass materials, which have superb hot - forging forming characteristics and can be punched in both the horizontal and vertical directions using the horizontal method and the closed die method

    熱鍛造成型性優越的黃銅材料在模型鍛造時可通過模架模實現水平及垂直進行水平式,合模式,可滿足顧客省材,省切割加工的需要,特別是數量越多其特點越明顯。
  14. Standard guide for use of maxi - horizontal directional drilling for placement of polyethylene pipe or conduit under obstacles, including river crossings

    包括渡口在內的障礙物下聚乙烯管線更換時最大水平法使用的標準指南
  15. It can increase the hole inclination angle range and drill elevation angle hole, while setting the top drive power head and hole top plate toward the opposite direction

    4機動力頭及口板調轉,可鑿仰
  16. It can increase the hole inclination angle range and drill elevation angle hole, while setting the top drive head and hole top plate toward the opposite direction

    動力頭及口板調轉,可直接鑿仰,大大增加傾角范圍。
  17. It can increase the hole inclination angle range and drill elevation angle holes, while setting the top drive power head and hole top plate toward the opposite direction

    動力頭及口板調轉,可直接鑿仰,大大增加傾角范圍。
  18. Utilize energy method to research crook problem of drilling rod under pressure and act on together, having studied the crooked influence to the drilling rod of torsion emphatically, the theory analyses found that axial load, hole vertex angle and torque are important factors of influence drilling rod crook

    利用能量法研究了壓力和扭矩共同作用下桿的彎曲問題,著重研究了扭矩對桿彎曲的影響,理論分析發現,軸載荷,頂角和扭矩是影響桿彎曲的重要因素。
  19. The drilling is fixed hydraulic pressure traverse motion mechanism, the complete machine can make lateral movement, and can content the pile bore emplacement of various pile foundation position, the operation is convenient and flexible, the leveling of the complete machine is fast and this can shorten the assistant time of drilling emplacement

    該機裝有液壓橫移機構,整機可作橫移動,可滿足各種樁基礎布局的樁就位,操作便靈活,整機調平快,可大大縮短機就位的輔助時間。
  20. Correlative function method and variable function method are used to calculate the relevant range of soil layer. the limit capacity of bored pile is determined by the cone penetration tests ( cpt ) and the static loading tests and related statistics parameters are also evaluated. considering the effects of group piles, the action effect is calculated by the settlement of pile foundation and the reliability index of single pile as well as group piles is determined by monte - carlo method

    本文選擇臨近場地的四座高層建築地基的全部勘測資料,以沿深度的一維平穩高斯隨機場作為樁基土層土性參數的數學模型,利用相關函數法和變異函數法計算土層的相關范圍,由cpt和靜載試驗結果綜合確定灌注樁的極限承載力,進而對相同場地各試樁的承載力進行折算后檢驗其概率分佈,並估計有關統計參數:考慮群樁效應確定樁基承載力,由樁基沉降反算其作用效應,由monte - carlo法計算單樁及群樁的可靠指標。
分享友人