鉆孔標高 的英文怎麼說

中文拼音 [zhēnkǒngbiāogāo]
鉆孔標高 英文
elevation of hole
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • 標高 : [測量學] elevation; level; altitude (飛行); datum mark; height mark
  1. This study is a post - cruise study of this leg, calcareous nannofossil samples from sites 1146, 1147 and 1148 of leg 184 were analyzed to provide a high - resolution biostratigraphy for this leg and to investigate morphological variation of coccolith genus gephyrocapsa. the main results of this study are : 1. 12 late pliocene to pleistocene bio - events were recognized and 6 zones of martini ( 1971 ) were determined for the upper sediment sequences of sites 1146 and 1148

    本文作為大洋探項目船下后續研究的一部分,對184航次中的1146站位和1147 、 1148站位的樣品進行了分析和研究,在船上科學家已經建立起的地層框架的基礎上進一步加密采樣,對生物事件志化石類別進行數量統計,進一步確定了12個生物事件在中的深度,建立起了兩個站位的解析度的鈣質超微化石生物地層框架。
  2. The cores, measurements of physical properties, well - logging and vsp data obtained from the chinese continental scientific drilling ( ccsd ) hole can be used to calibrate seismic reflectors and raise the reliability of seismic interpretation

    摘要利用大陸科學探巖心、巖心物性測定結果、測井與vsp資料來定地震反射體,大大提了中國大陸科學區地質構造解釋的可信度。
  3. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外樁基礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心樁、預制預應力混凝土空心樁的成樁工藝、填石壓漿混凝土的配合比設計原理及影響強度指的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流動影響半徑和上升度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心樁基礎的質量檢測方法及準;並在此基礎上,深入分析了樁側、樁端承載能力,提出了填石壓漿混凝土空心樁的設計計算理論和方法。最後,論證了空心樁新工藝的可行性、適應性、經濟性,為大力推廣應用空心樁新技術提供了可靠的技術資料。
  4. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋灌注樁基樁施工中,在不同地質條件下,水上機平臺的搭設、成設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾斜巖面上嵌巖面上問題作了探討
  5. The research of patch antennas based on photonic - bandgap ( pbg ) structures is a relatively new area. the goal is to improve the performance of the patch antennas by using the special features of pbg structures. though some good research results have been obtained by scientists in the world, there still exit some problems to be solved for improving the performaces and reducing the size, weight and cost

    雖然國內外已經在基底型、地面腐蝕型、阻抗表面型、 uc - pbg型、覆層型和軟表面型電磁(光子)晶體貼片天線等方面開展了研究,但是在這些研究中還遺留著多方面的問題有待解決,以顯著改善天線的性能指,減少天線的體積,重量,降低天線的加工費用等。
  6. This paper looks soil as homogeneous stationary random fields, expatiates the application of the random process in the geotechnical engineering and establishes the basic concept, its assortment and digital feature of random process and random fields, tests whether this random fields is a stationary process and whether it is ergodic, applies correlation function theory and variable function theory in the study of the random fields of soil parameter, acquires the relation of the two theories and draws the conclusion that they are equal essentially, fits the measured curve by using the correlation function method, variable function method and other methods, and acquires the value of correlation distance, applies the random fields theory of soil parameter in actual engineering, estimates the value of elevation and other soil parameters of 92 holes in baoding city and the results are satisfying

    將相關函數理論和變異函數理論分別應用於巖土參數隨機場的研究中,通過運用這兩種理論對巖土參數特性的描述,得出這兩種理論的內在聯系及其本質一致性的結論。分別運用相關函數法、變異函數法及其它求解相關距離的方法對實測函數曲線的擬合,得出描述空間相關程度的度量? ?相關距離(或變程) ,對用這幾種不同方法得出的相關距離(或變程)值進行了比較,並對這幾種方法的優劣和實用性做了評比。將巖土參數隨機場理論運用於工程實際,對保定市區某場地的92個的各層位的層底及其它幾種常見的巖土參數做出了估計,預測結果比較令人滿意。
  7. Correlative function method and variable function method are used to calculate the relevant range of soil layer. the limit capacity of bored pile is determined by the cone penetration tests ( cpt ) and the static loading tests and related statistics parameters are also evaluated. considering the effects of group piles, the action effect is calculated by the settlement of pile foundation and the reliability index of single pile as well as group piles is determined by monte - carlo method

    本文選擇臨近場地的四座層建築地基的全部勘測資料,以沿深度方向的一維平穩斯隨機場作為樁基土層土性參數的數學模型,利用相關函數法和變異函數法計算土層的相關范圍,由cpt和靜載試驗結果綜合確定灌注樁的極限承載力,進而對相同場地各試樁的承載力進行折算后檢驗其概率分佈,並估計有關統計參數:考慮群樁效應確定樁基承載力,由樁基沉降反算其作用效應,由monte - carlo方法計算單樁及群樁的可靠指
分享友人