鉆孔能力 的英文怎麼說
中文拼音 [zhēnkǒngnénglì]
鉆孔能力
英文
drilling cap-
Landslide is a geological hazard with serious losses. it is very important to research the controling methods. slide - resistant pile, which has many advantages such as high adaptability, little interference to landslide and geological environment, short construction time, high silde resistance, is a main method to control landslide. pneumatic down - the - hole hammer is a drilling method with many advantages. its features, such as wide application range, high hole quality, no circulating medium, low operation regulations, and drilling big diameter rock hole, fit to construct slide - resistant pile. according to the requirement of silde - resistant pile construction, this paper analyses feasibility that pneumatic dth hammer drilling applies to construct slide - resistant pile on the basis of introducing the features of pneumatic dth hammer. then an applied example is given
滑坡是一種危害極大的地質災害,它的整治方法研究具有重要意義.抗滑樁是一種適應性強、對滑坡穩定性和地質環境干擾小、工期短、抗滑能力強的滑坡整治方法.風動潛孔錘鉆進是一種具有許多優點的鉆進方法,它的許多特點,如成孔質量高、應用范圍廣、無液體循環介質、鉆進規程參數小、可實現大直徑基巖鉆孔等都適合於抗滑樁施工.文章在介紹風動潛孔錘鉆進特點的基礎上,根據抗滑樁施工要求,分析了風動潛孔錘用於抗滑樁施工的可行性,並舉出了其應用實例The investigation of a lot of parameters about treated sandstone, brick materials and earthen materials with fluorited polymers has been carried out, such as the formation of polymer, the penetration depth, porosity, capillary absorption and penetration coefficient, water uptake, compressive strength, drilling resistance, absorption isotherms of water vapor, water vapor diffusion, color changes as well as resistance to desegregation of water, frizzing - throwing cycles, worming - cooling cycles, and so on. in addition, the influence of salt crystallization, acid and base, and uv aging have also been assessed in order to better understand the protection effects and utilization possibility of two fluorinated polymers, mainly according to astm standard and the combination of international methods together with general technological
分別以國家級文物保護單位的土質、砂巖和磚材文物樣品為對象,依據astm標準及國際通用文物保護研究方法與評估準則相結合,通過膠化物形成周期、滲透深度、孔隙度、毛細吸水和滲透系數、持水量、抗壓強度、抗鉆強度、吸附水蒸氣的能力、透氣性、外觀顏色等系列參數的測定,及凍融、冷熱循環、酸堿腐蝕后抗壓強度的衰減、可溶鹽對保護效果的影響、酸堿及光照對表面保護效果的影響,對兩種含氟聚合物及其與有機硅的共混物在文物加固保護和表面防護中的可行性和保護效果給予了系統研究。1 it has great drilling capability, wide range of application, rapid drilling speed and high drilling efficiency, as well as powerful ability of eliminating accident
二鉆機特點1鉆機鉆進能力強,適用范圍廣鉆孔速度快,處理事故能力強,鉆進效率高。Our factory has full production facilities, which are used on glass cutting, polishing, printing, hole making and sandblasting. we are willing to build up our abilities to develop more new products line according to different market demand
本廠生產設備全,可進行玻璃切割磨邊印刷鉆孔打砂等深加工,及擁有因應市場需要而開發新產品之能力。This method takes generalized tri - prism ( gtp ) as primitive modeling element, realizes inference and automatic modeling of geological structure including faults according to characteristics of borehole data and the knowledge inference rule, which can avoid unnecessary manual intervention, extend applicable range and expressing capability of 3d geological modeling
該方法以廣義三稜柱作為建模的基本體元,根據鉆孔數據的特點和知識推理規則,進行斷層等復雜地質構造的推理和自動建模,避免了不必要的人為干預,擴展了鉆孔數據建模的適用范圍和表現能力。This paper described the basic principle and construction type of the linear accelerometers, and calculated system response to various forces. it deduced essential parameters which affect measurement accuracy of accelerometers, and it also explained the measurement and selection methods of parameters about accelerometers
通過敘述鑿巖排渣不順利所引起的後果,分析了影響排渣的各種因素,說明了在不同鉆鑿巖孔的條件下的排渣能力,對鑿巖機械的使用者和設計製造者來說,很有參考價值Today, cast - in - situ piles are more widely used in deep foundation engineering because of their many advantages, such as better adaptability to various ground condition, providing enormous bearing capacity by a single pile and smaller dosage of reinforcing steel bar. but, their own disadvantages, such as sediment under tip, clay slurry around pile, friction and tip resistance disagreement and initial ground stress freeing, limited their bearing capacity, lowered the utilization ratio of material and increased the settlement
灌注樁,因其對地層適應性強、能提供較大的單樁承載力、鋼筋用量少等優點,在目前深基礎工程中得到了極為廣泛的應用。但是,灌注樁的固有缺陷,諸如孔底虛土;孔壁泥漿;端阻、側阻發揮不同步;鉆孔后原地應力釋放等,限制了其承載力的發揮,使得材料利用率不高,沉降較大。With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy
本文通過綜合分析國內外鉆孔樁基礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心樁、預制預應力混凝土空心樁的成樁工藝、填石壓漿混凝土的配合比設計原理及影響強度指標的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心樁基礎的質量檢測方法及標準;並在此基礎上,深入分析了樁側、樁端承載能力,提出了填石壓漿混凝土空心樁的設計計算理論和方法。最後,論證了空心樁新工藝的可行性、適應性、經濟性,為大力推廣應用空心樁新技術提供了可靠的技術資料。The grouting test result shows that this technique of pile foundation construction is effective, it can not only increase the upper and skin friction of the cast - in - place pile, but also improve the bearing capacity of the cast - in - place pile, and gain a larger economic benefit for whole project at the same time
經樁端壓漿實驗結果表明,該技術可以增加鉆孔灌注樁樁端阻力和樁側壁摩阻力,是一項行之有效的樁基施工技術,它可有效提高鉆孔灌注樁的承載能力,同時提高經濟效益。Considering the engineering of trail pile in hubei jingzhou yangtze river highway bridge, the construction process of deep cast - in - place pile under pebble geological structure, the limit load - bearing capacity of single pile, side friction stress and head drag are researched in this thesis deeply
論文結合湖北省荊州長江公路大橋的試驗樁工程,深入研究了江漢平原地區卵石地基深鉆孔灌注樁的施工工藝、單樁極限承載能力、樁側摩阻力和端阻力。In this paper, on the foundation of synthesizing engineering practice and study result of planted bar technique by chemistry glue on the domestic and international, embedded experiment study and theories analysis are done about bonded anchor behavior of chemistry planted bar anchorage behavior in this paper, the experimental results of 32 pulling resistance test ( meiya z3530 ) are given, considering some factors to affect bonded anchor behavior of chemistry planted bar such as the strength of concrete anchorage lengths diameter of steel bar and holes thickness of the protecting layer confecting circumstance of the hoop bar and quantity of construction especially which is very easy to be neglected and so on, and bonded anchor mechanism failure mode load carrying capacity and slide behavior are analyzed in - depth
本文在綜合國內外化學膠植筋技術的工程實踐和研究成果的基礎上,對化學植筋的粘結錨固性能作了較深入的試驗研究和理論分析。文中通過32個化學膠(美亞z3530 )植筋試件的拉拔試驗研究,考慮混凝土強度、錨固長度、鋼筋植筋、鉆孔孔徑、保護層厚度、箍筋配製情況及施工質量等因素對植筋粘結性能的影響,特別是植筋的施工質量對粘結性能的影響是比較容易被忽視的因素,對化學植筋的粘結錨固機理、破壞形態、承載力及滑移性能作了比較深入的剖析。It is provided by the result of observing for the trial of pile, if the cast - in - place is constructed according to strict technological process, the limit load - bearing capacity of single pile is more larger then its calculational value, and under the function of the most trial loading, the frictional drag haven " t occur yield in every major loading layer, so the pile have greatly safety reserve in engineering
樁試驗的觀測結果證明,按照嚴格工藝流程施工的鉆孔灌注樁,其單樁極限承載能力遠大於計算值;在最大試驗荷載作用下,各主要持力層均未出現摩阻力屈服現象,樁有較大的工程安全儲備。With focus on high volume quality products, neco has carved a solid foundation in the headset and bottom bracket component areas. in addition to machine tooling capacity that covers a wide range of applications and finishes, neco also has extensive capabilities of alloy cold forging, steel press, hole taping and cnc finishing, neco delivers on the promise of providing competitive products at high volumes
帶著高品質的產品,志慶在車頭碗組及五通碗組的零件領域創建了一套完整的體系,在鋁合金冷鍛,鋼鐵沖壓,鉆孔及cnc加工方面擁有很強實力,能確保提供高檔次的有競爭力的產品。Drilling track is key factor which decide trenchless success or failure, but controlling drilling track stay around rectifyed phase at the present. guided the theory of force is the key affectting the drilling track, the paper discuss primary factors on contralling drilling track, and advance the formulary ahout reckoning deviation force and azimuth force, expect to achieve the aim that drilling track were controled real time and be anticipated, and have the initiative on drilling track contaolling
巖層鉆進軌跡是決定非開挖成敗的關鍵因素,目前對鉆孔軌跡的控制僅僅停留在被打糾偏層面上,本文在力是影響鉆進軌跡本質因素理論指導下,對影響巖層鉆進軌跡控制的因素進行了理論探討,並針對造斜力和變方位力提出了計算模式,希望最終能實現鉆孔軌跡的實時監控與調整,變被打糾偏為主動鉆進。By rational designing and utilizing of the steel liners for the bored piles with varying cross sections in deep waters, the bearing capacity can be increased and the cost can be reduced
合理地設計和利用深水中的鉆孔灌注樁護筒,採用變截面樁,可以提高基樁承載能力,降低造價。Contrast to such original place test method as static load method and drilling method, the method that applying transient rayleigh surface wave to inspect the compound foundation own many virtues as low cost, high efficiency, non - destruction, and it also can save much labour and effort. furthermore, it can implement the large - wide and comprehensive inspection and evaluation of compound foundation bearing capacity
與靜載試驗、鉆孔法等原位測試方法相比,瞬態瑞雷波檢測復合地基技術具有成本顯著降低、效率高、無破損等特點,可節省大量的人力物力,從而可以實現復合地基承載力大范圍、全面的檢測和評價,打破以往只能局部抽檢的局面。In order to have more load capacity in drilling pile, size of drilling holes may be increased, or enlarged the end of pile by explosion, or driving the cast - in - place pile twice
為了提高鉆孔樁承載能力,可在鉆孔時孔頭擴大,也可以採用爆破法使樁頭擴大,現澆混凝土樁二次復打也可提高承載能力Since 1972, j series hammers and various rock drll bits have been developed, among them two products have won the prices of the national science conferences and fourteen products obtained scientific and technical achievement prices from the metaillurgy, ministry. all the products have been widely used in metal, coal, and industrial mineral mines, hydroelectrie construction sites and sold to the foreign markets as well. cimr machinery plant is a department responsible for trial - producing, manufacturing and marketing the research achievements of cimr, it has started manufacturing hammers and rock drill bits since 1958
在與tanhoanganh公司主要代理建築和工程機械總經理nguyen huy huyen的交流過程中,當我們談到cs165智能整體型一體化液壓潛孔鉆機可鉆鑿100m深的孔,能把偏斜率控制在1 %以內,整個鑿巖過程在定位完成後自動完成,並配備了雙動力驅動系統時,他舉起大拇指,大呼「 powerfulUtilize energy method to research crook problem of drilling rod under pressure and act on together, having studied the crooked influence to the drilling rod of torsion emphatically, the theory analyses found that axial load, hole vertex angle and torque are important factors of influence drilling rod crook
利用能量方法研究了壓力和扭矩共同作用下鉆桿的彎曲問題,著重研究了扭矩對鉆桿彎曲的影響,理論分析發現,軸向載荷,鉆孔頂角和扭矩是影響鉆桿彎曲的重要因素。The cast - in - place pile has become the major foundation form to road and bridge construction for the feasible practice of various geological structure, load bearing and strong resistance to earthquake
鉆孔灌注樁基礎能適應于不同地質條件、荷載情況,抗震能力強,因此成為了公路橋梁的主要基礎形式。分享友人