鉆探進度 的英文怎麼說

中文拼音 [zhēntànjìn]
鉆探進度 英文
boring progress
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ動詞1 (試圖發現) try to find out; explore; sound 2 (看望) call on; visit; see 3 (向前伸出)...
  • : 進構詞成分。
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
  1. This study is a post - cruise study of this leg, calcareous nannofossil samples from sites 1146, 1147 and 1148 of leg 184 were analyzed to provide a high - resolution biostratigraphy for this leg and to investigate morphological variation of coccolith genus gephyrocapsa. the main results of this study are : 1. 12 late pliocene to pleistocene bio - events were recognized and 6 zones of martini ( 1971 ) were determined for the upper sediment sequences of sites 1146 and 1148

    本文作為大洋項目船下后續研究的一部分,對184航次中的1146站位和1147 、 1148站位的樣品行了分析和研究,在船上科學家已經建立起的地層框架的基礎上一步加密采樣,對生物事件標志化石類別行數量統計,一步確定了12個生物事件在孔中的深,建立起了兩個站位的高解析的鈣質超微化石生物地層框架。
  2. After have systematically studied sequence stratigraphy of chagan depression, a analysis method of high precision sequence stratigraphic framework in fault - depressed lacustrine basin. the core of the establishing framework is exploration - significant identify of sequence, division of 2, 3, 4, 5 grades sequence and analysis of base - level based on lithologic log or well - logging, high - resolution seismic inversion constrained to well data. then using the results of 2d seismic data, and interpret sequence to enhance the precision of interpretation

    斷陷盆地高精層序地層格架建立的核心是用/測井和井約束條件下的高解析儲層橫向預測剖面等高解析資料行具有勘意義的二、三、四和五級層序的界面識別、層序劃分和基準面變化分析,在此基礎上標定常規地震剖面,行區域層序地層分析,達到提高層序地層解釋精的目的。
  3. Regulation method for feed speed of fully hydraulic drilling machine

    全液壓給速調節方式
  4. To reconstruct the evolution and variability of the east asian monsoon during the late cenozoic on millennial, orbital and tectonic time scales. 3. to identify and better understand the links between tectonic uplift, erosion and weathering hemipelagic deposition, and climate change, including the evolution of the asian monsoon and the neogene global cooling

    Odp184航次1999年2月至4月間在中國南海取樣,通過取半遠洋沉積,以期說明南海的新生代歷史,包括它的生物地層學、巖石地層學、年代學、古氣候學和古海洋學;重建千年級的晚新生代東亞季風的發展和演化、軌道和構造時間尺;識別和更好地理解構造抬升、侵蝕和風化、半遠洋沉積和氣候變化,包括亞洲季風和晚第三紀的全球變冷。
  5. The article introduces the basic concepts and common methods of fuzzy mathematics, initially discussing the applications of fuzzy mathematics in the following aspects : 1 ) division of " skidding " strata with grade of membership that are drilled with diamond bits ; 2 ) comprehensive evaluation on the application in evaluation of diamond bits, classification of rock drillability, and evaluation of clay ; 3 ) classification of " hard rock " through fuzzy clustering analysis ; 4 ) estimation of completion time of boreholes and evaluation of underg round water with fuzzy mathematics ; 5 ) identification of new ore areas and option of best water resource area with fuzzy model ; 6 ) option of diamond bits and evaluation on oil field development plan with fuzzy resemble option and the improved calculation method ; ? ) prediction of mud slurry performance and of the amount of surging water in ore pits with fuzzy control ; 8 ) comprehensive evaluation of diamond bits and supporting plan of deep foundation pit with fuzzy optimal theory

    初步討了以下幾方面的應用: 1 )用隸屬劃分金剛石「打滑」地層; 2 )綜合評判在金剛石頭評價、巖石可性分級及造漿粘土評價中的應用; 3 )用模糊聚類分析行「硬巖石」分類; 4 )用模糊數孔竣工時間預估及地下水質評價; 5 )模糊模式識別在新礦區類型識別和最佳水源地選擇中的應用; 6 )模糊相似選擇及其改演算法在金剛石頭選擇和油田開發方案評價中的應用; 7 )模糊控制在泥漿性能和礦坑涌水量預測中的應用; 8 )優化理論模型在金剛石頭和深基坑支護方案綜合評價中的應用。
  6. A large amount of data were acquired from the measurement in situ surfacial soil strength on the tidal flat by using portable cone penetration, shallow drilling, laboratory analysis of delta, and other means

    利用輕型靜力觸對灘面表層土體強行密集型的測試,同時結合淺層,室內試驗等手段,獲得了大量數據,行了資料整理、分析。
  7. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場試驗、力學數值分析和有限單元分析,對巖溶地段孔灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚及嵌巖深等方面作一些討性研究,為該工程的設計和施工積累經驗,並為該類課題的一步研究奠定了基礎。
  8. In this paper, the author synthetically applied continental lake basin high - resolution sequence stratigraphy, sedimentation, well logging, petroleum geology, mathematics geology, etc, on the basis of studying on the core of the well drilling in the district, fully utilize logging well, well drilling core and testing and analyzing materials, adopting well logging - sedimentary facies automatical identification to study the characters of sedimentary facies and sub - facies further. and study sedimentary facies profoundly, and carry on sedimentary facies contrast well to well, to study yanchang 3 sector and yanchang 4 + 5 sector lithofacies palaeogeography character and evolution further

    本文綜合應用陸相盆地高解析層序地層學、沉積學、測井學、石油地質學、數學地質等理論,在對研究區內有關井巖芯觀察的基礎上,充分利用測井、井巖芯以及測試分析資料,並採用測井?沉積相自動識別等方法,深入研究了沉積相、沉積微相特徵,並行井間沉積相對比,討了長3 、長4 + 5期的巖相古地理特徵及其演化。
  9. On the basis of sedimentary facies division, the author firstly divided super short - term and short - time base - level cycle on well drilling cores, and playback the cores to well logging curves to scale them, and set up different classes of base - level cycles answered to well logging respond models. finally the author discussed how to use log well curve to divide super short - term and short - time base - level cycle characters, and to set up super short - term and short - term base - level cycle comparison framework, and analyzed sand body origin cause of formation type and spreading rules

    在深入的沉積相研究基礎上,對井巖芯行了超短期?短期基準面旋迴劃分,將巖芯歸位,並對測井曲線行刻,建立了不同級次基準面旋迴的測井響應模型,而應用測井曲線劃分低級次基準面旋迴,建立了超短?短期基準面旋迴地層格架,討了砂體成因類型及展布規律。
  10. Since the inception of this project in 1998, three pre - pilot holes have been completed and the main hole has reached a depth of over 3500 m

    從98年開始,已經完成3個預先導孔的工作,主孔已經超過3500米。
  11. Many bore holes in shuangwangcheng reservoir which lies in the sedimentary area are drilled and lots of terra drill data are collected. five typical sections, i. e. section i ? i, ii ? i, iii ? ii, iv ? v ' and v ? v are drawn. the vertical sedimentary sequence of this sedimentary area is divided cbmbining the granularity features of sediments

    課題組與山東省水利勘測設計院合作,對湖區內的雙王城水庫行了研究,搜集了大量的地質孔資料,經沉積物巖性特徵分析,繪制出雙王城水庫外圍1km處圍繞水庫的5個典型剖面(即剖面? 』 、 ? 』 、 ? 』 、一』和? 』 )的剖面圖,結合沉積物粒特徵,劃分出該沉積區的垂向沉積序列。
  12. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內試驗及原位測試指標行理論計算與現場實測值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深修正系數,使理論計算值與現場實測值具有良好的一致性,而通過變形協調理論對荷載?沉降曲線行數值計算,並用不同施工工藝的實例說明了理論計算荷載?沉降曲線與實測荷載?沉降曲線的擬合效果,從而達到可在不做靜載荷試驗或少做靜載荷試驗的情況下通過剪切波速和靜力觸試驗指標以及施工工藝修正系數等預測黃土地基中孔灌注樁承載性狀,這對于工程初步設計中減少設計的盲目性具有十分重要的現實意義。
  13. Slop is harmless change deal with technical investigation report causes a leader to take seriously highly on january 24, 2007, cling to division of management of prevention and cure of pollution of bureau of city environmental protection, cling to censorial detachment finishs city oil environment hand in hand " cling to trash of well drilling of development of exploration of city churchyard oil is harmless change deal with current situation investigation report " accepting autonomous prefecture " system of job responsibility of target of progress of science and technology of party card leader " in the examination that assesses a group, cause height of the member that the examination is comprised to take seriously

    泥漿無害化處置技術調研報告引起領導高重視2007年1月24日,巴州環保局污染防治治理科、巴州石油環境監察支隊攜手完成的《巴州境內石油勘開發井廢物無害化處置現狀調研報告》在接受自治州《黨政領導科技步目標責任制》考核小組的檢查中,引起檢查組成員高重視。
  14. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有勘手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通過現場試驗、理論計算和有限單元分析,對巖溶地區孔灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚及嵌巖深等方面行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。
  15. Abstract : this paper made an approach to the form and cause of the failure of large diameter long - hole rock drilling tools in anqing copper mine and put forward some ways for extending the service life of rock drilling tools in the light of its practical use

    文摘:文章主要就安慶銅礦大直徑深孔鑿巖具的失效形式和原因行了討,並從具使用角出發提出了提高鑿巖具使用壽命的途徑。
分享友人