鋼板梁 的英文怎麼說

中文拼音 [gāngbǎnliáng]
鋼板梁 英文
steel plate girder
  • : 鋼名詞(鐵和碳的合金) steel
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • 鋼板 : [冶金學]1 (板狀鋼材) steel plate; nickelclad steel sheet; plate 2 (汽車上的片狀彈簧) spring3 ...
  1. The system is composed with concrete filled cold - formed square steel tube column, the beam with two cold formed c type steel welded together back to back, the slab with profiled - steel and concrete, the beam and the slab joined into composite steel - concrete beam. they all together make up of the bearing members. and the house also includes the light economical - energy sources heatproof walls

    該體系是以冷彎薄壁方管混凝土為柱、冷彎薄壁c型背靠背高頻焊接組成工字型、壓型上現澆築混凝土組成組合樓並與一起構成組合作為承重構件,以輕質節能保溫型墻體作為圍護結構組成。
  2. In this paper, a high performance sma system applied to steel bridge deck is put forth in allusion to the pavement project of the wuhan junshan yangtze river highway bridge. it comprises steel slab, zn coating layer, closing layer, adhesive, pre - mixed asphalt stone and dual layer sma from bottom to top. it is based on the fea results of the forces and deformation of the pavement layer by means of the algor feas, according to this bridge ' s traffic and the ambient temperature varying range of the pavement layer

    本文針對武漢軍山長江公路大橋橋面鋪裝工程,從鋪裝層環境溫度變化范圍、交通量等使用條件出發,在用algorfeas有限元分析軟體分析鋪裝層受力變形基礎上,提出了(即+金屬鋅塗層+封閉層+粘接劑+預拌瀝青碎石+雙層sma )的高性能橋面sma鋪裝體系,並對這種sma的組成材料,包括改性瀝青、集料、礦粉、纖維進行了比較研究,設計了這種sma的配合比,對sma混合料的性能進行了對比試驗,對這種sma方案進行了疲勞性能研究,驗證了所選擇sma方案的可行性。
  3. Considering special form of the boiler frame, the reconstruction and enforcement method, in addition dynamic analysis are given by particular steps : establishment of the model of boiler steel frame, determination of earthquake loads and distribution form, and anti - side force system for the frame to model and analyze, involving loads on the frame and above it, earthquake loads, damping, sway control installation, hanging bar and plate beam

    考慮鍋爐構架結構的特殊形式,研究並提出了電站鍋爐結構改造加固研究方法,及動力分析的具體步驟:建立了鍋爐結構動力分析模型、地震荷載分析方法、建立了鍋爐結構布置型式、及整個鍋爐構架抗側力體系模擬分析方法。具體包括:構架本體及構架上荷載、地震載荷與阻尼系數確定、制晃裝置確定、吊桿與大簡化。
  4. Also, the thesis calculate and analysis the transverse deflection of steel box girder deeply in multiple factors. firstly, the article introduced the calculative methods and theory of local stress and strain of bridge structure. then program software system of finite element method was introduced. after that, the influential factors to the calculatial result and their values were analysed and suggested

    本文首先介紹了橋結構局部應力應變計算理論和方法,對有限元計算程序進行了介紹,然後分析了縱橫隔設置、高及寬變化等因素對橋面在恆載作用下的橫向撓度的影響,並將這些計算結果進行對照分析,從而找出了影響橋面橫向撓度的主要影響因素,並得出了相應的數值可供工程實踐參考。
  5. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺, 「抗彎抗剪錨筋法」強化柱加固效果, 「箍法」做地基筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行筋籠吊裝簡化施工工序;承臺施工採用主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  6. This machine is available to driver different kinds of piles, such as prefabricated concrete piles, steel pipe piles, steelplate piles, etc. it is a convenient machine for construction of building, bridge, port

    本樁架適用於打植混凝土預制樁、管樁、樁,是建築、橋、港口施工中機動靈活的樁工施工機械。
  7. ( 4 ) the beam thickness of the steel framework was optimized

    ( 4 )進行骨架厚度優化設計。
  8. The authors describe the modelling of a railway steel truss bridge with long - span in order to analyse the detailed distribution of stress for members and nodal plates in main truss, the detailed deformation and stress distribution due to frame effect on transversal bracing plane in truss bridge, and the detailed distribution of stress in important parts of the steel plate girder bridge with initially transversal deformation by using sseb in this article

    本文建立大跨鐵路橋和鋼板梁橋全橋結構模擬分析數學模型,說明了橋桿件和節點詳細應力分佈、平面框架詳細變形與應力分佈和有變形缺陷鋼板梁橋重要部位應力的模擬分析結果等問題。
  9. With the actual locale incestigating, the actual locale testing and the theories analyzing of the reason of the diseases producing of the exceed limit of horizontal swing and steel pole ' s break, and summaried the reinforcing measure of the top bear armor plate beam

    通過對京廣線鄭州黃河大橋40米上承式鋼板梁橫向擺動嚴重超限及桿件斷裂等情況的現場調查、現場測試和理論分析及病害原因產生的機理,總結提出了上承式鋼板梁的加固措施。
  10. Because of the original design standard was low, the horizontal angur rigidity is serious lack, when the high speed train passes, the exceed limit of the horizontal swing had affected the lifting of the main trunk line, these diseases had been existed earlier but had not been gotten to resolve radical, and along with the increasing in speed of railroad train, these diseases performance will be more seriously, it ' s time for resolve

    同時提速列車對橋結構的動力作用增大,特別是對上承式鋼板梁。由於原設計標準低,橫向剛度嚴重不足,高速列車通過時橫向擺動嚴重超限等已嚴重影響了主要干線的提速,這些病害很早就存在但沒有得到根治,隨著列車提速,這些病害表現越來越嚴重,已到了必須整治的時候了。
  11. What welding methods do you use in connecting the plates, frames, and beams

    在焊接,肋骨,甲時,你們用什麼焊接方法?
  12. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁沉井圍堰鉆孔樁基礎,圍堰在橋基礎施工中的應用越來越多。
  13. Thus it is necessary to study moment resistance, rotation stiffness and rotation capacity of the joints. in this paper, six specimens on end - plate composite beam - to - column joints and two specimens on end - plate composite beam - to - column joints were designed to subject to static load. the factors of m - characteristics about semi - rigid composite joints, including bolts, profiled steel sheeting, beam, column, stiffen rib and reinforcement, are studied

    本文設計了6個端-混凝土組合樑柱節點與2個端型純樑柱節點,通過對這些試件的靜力荷載試驗,重點研究了端-混凝土組合節點的彎矩-轉角性能的影響因素,包括高強螺栓、壓型、型、型柱、加勁肋,以及混凝土內縱向筋配筋率等。
  14. The influence upon the fatigue stress of longitudinal bracing rods due to the transverse vibration of steel bridges

    橫向振動對鋼板梁橋聯結桿件疲勞應力的影響
  15. Based on a series of testing, examination, research and analysis conducted how to lift the speed on nanking section, jinhu road, we explore the possibilities of solving the obstacles of nanking segment of bridges for realizing railroad speed - lift soon due to its subframes and steel plate beams. we produced authentic and convincing data. 3

    通過對京滬線南京段部分橋為實現鐵路提速而進行的一系列實驗、檢測、研究和分析,探討了成為制約干線提速瓶頸的下承鋼板梁及半穿式進一步提高運行車速的可能性,為此類結構的橋提速提供了可信的依據。
  16. Therefore, the light steel portal frame system is compared comprehensively to the bent frame system of solid - web steel column and solid - web steel plate beam, the bent frame system of solid - web steel column and open - web steel pipe truss, as well as the system of rc column and open - web steel pipe truss

    因此對中小型單層廠房中實腹式柱加實腹式鋼板梁排架體系,實腹式柱加空腹管桁架排架體系以及筋混凝土柱加空腹管桁架排架體系與輕門式剛架進行了綜合比較。
  17. This thesis will emphasis research the technique of reinforcing experiment test on the top - bear type armor plate the beam, especially to the 40 - meter top - bear type armor plate beams of the big bridge of yellow river of zhengzhou

    本文重點研究上承式鋼板梁特別對京廣鄭州黃河大橋40米上承式鋼板梁的加固技術實驗測試。
  18. The reinforcing technique to connect both line regid do n ' t change the self - frquency of girder, but use the piece of rigid conjunction pole connect both juxtaposition girder together, under the together action of both girder, and increased the horizontal damp to realize the purpose of reduce flap

    對上、下行復線鋼板梁採用雙線剛性連接技術不改變的自振頻率,而是採用剛性連接桿件將并行的兩孔連接起來,通過兩孔共同作用,加大樑體橫向阻尼而達到橫向減振目的。
  19. Based on qualitative analysis and comparison of several options for suppressing transverse vibration on deck type steel plate girder of railway bridge, conclusions are made as follows : with static reinforcing, the vibration amplitude can be suppressed to some extent, but quasi - resonance of the bridge can not be avoided, moreover, the construction is inconvenient and costly. with option of two bridge connection, the effectiveness of vibration suppression is clear ( the damping ratio approaches 50 % ) and it is fairly economic and easy, however, the quasi - resonance of the bridge can not be avoided either. with dynamic option ( mtmd option ), the quasi - resonance of the bridge can be effectively avoided ( the damping ratio is up to 51. 38 % as tested in field ), moreover, the construction cost is low, and the construction is simply and convenient

    通過對目前抑制鐵路上承式鋼板梁橋橫向振動的幾種方案進行定性的分析和比較,認為:靜力加固方案可以使橋振幅有所減小,但不能避免準共振現象的發生,而且工程造價較高,施工也不方便;兩橋連接方案減振效果明顯(減振率近50 % ) ,比較經濟也比較方便,但同樣不能避免準共振現象的發生;動力減振方案( mtmd抑振方案)可以有效的抑制橋的準共振現象(現場試驗中減振率達51 . 83 % ) ,而且工程造價較低,施工簡單、方便。
  20. For do n ' t delive the horizontal power, connect method adopt the double hingle connect, and made both girder just to deliver the horizontal power each other, and vertical power can change position, this the problem that the top bear armor plate beam do n ' t accommodate the increasing in speed had been resolved radical

    為了不傳遞豎向力,連接方式採用雙鉸接,使兩孔只能相互傳遞橫向力,豎向可以變位,從而基本解決了上承式鋼板梁不適應提速問題。
分享友人