鋼索索節 的英文怎麼說

中文拼音 [gāngsuǒsuǒjié]
鋼索索節 英文
capel
  • : 鋼名詞(鐵和碳的合金) steel
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • : 節構詞成分。
  • 鋼索 : steel cable; cable; cable wire; steel rope; wire rope鋼索傳動 rope transmission; steel rope drive...
  1. The main factors which affected the flight stability quality included : forward flight speed, slung - load and helicopter mass ration, slung - load aerodynamic forces and cable length, etc. through adjusting the above structure and performance parameters, rational flight parameters can be decided, which can ensure the safe helicopter mission operations of the slung - load flight

    影響飛行品質穩定性要求的主要因素為:直升機飛行速度、吊掛物/直升機質量比、吊掛物氣動特性、吊掛長度等。通過對上述結構參數、性能參數的調,可確定合理、經濟的飛行參數,保證安全、高效的完成直升機機外吊掛飛行運輸任務。
  2. The curve of arch rib, rib section bending, splice of rib sections, seperator of tube, bracing plates, bracing system, meeting of arch, concrete pumping, hangers, tie - rods, the tower of the cable crane and the guy ropes, technical specifications of cfst arch bridge are discussed

    管混凝土拱橋的拱軸線選用、段彎制、段拼接、管內分隔倉、綴板設計、聯結繫系統、合龍設計及其細、管內混凝土的泵送、吊桿、系桿、纜吊機與扣塔架、技術規范等12個問題進行了探討。
  3. Concrete pylons are adopted for the fengdu yangtze suspension bridge, and normal construction methods for the pylons include slide formworks, turning shutters and climbing formworks. climbing formworks with assembled steel - pipe scaffolding is a newly - developed technique for this bridge. it causes saving of the steel skeleton for construction of the pylons. by utilizing regular simple rods and parts, construction progress is fast and the quality is good

    豐都長江大橋懸橋採用混凝土橋塔,其常規的施工方法有滑模、翻模和爬模等幾種,本橋施工中採用了新開發的管爬升架倒模新工藝,不僅省了為橋塔施工而設計的橋塔型骨架,而且利用常規的簡易桿件、施工速度快,施工質量好。
  4. First, author considers the connection strength between steel cable and joints, the requirements about joints function, the mechanics performance of joints

    首先考慮點的連接強度、點構造要求、點功能要求、點力學性能。
  5. Terminations for steel wire ropes - safety - metal and resin socketing

    絲繩的接頭.安全性.金屬和樹脂套連接
  6. Round steel link chains - span chains

    鏈.張
  7. Based on the analysis results, chapter three, chapter four and chapter five discuss the budget control content in which combine the budget management practice of wuhan steel and iron ( group ) company

    第三章、第四章以及第五章是在第二章分析得出集團公司預算控制內容的基礎上,以控制內容為章並結合武漢鐵(集團)公司的預算管理實踐進行闡述。
  8. Valuable conclusion in engineering are drawn for practical design. the method of getting reasonable prestress degree for suspendoem which is restricted by intergral stability was discussed. optimizing programs are developed with the axis force and joint displacement of upper dome as object function respectively, the effective method of prestress degree for suspendoem which is

    探討了穩定約束的弦支穹頂合理預應力度的優化方法,分別以網殼桿件內力、點豎向位移和點垂直向下位移為目標函數編制了優化程序,得到了整體穩定約束的弦支穹頂結構確定預應力值的可行方法。
分享友人