錦屏水電站 的英文怎麼說

中文拼音 [jǐnbǐngshuǐdiànzhàn]
錦屏水電站 英文
jinping 1 hydropower station
  • : Ⅰ名詞1. (有彩色花紋的絲織品) brocade 2. (姓氏) a surname Ⅱ形容詞(色彩鮮明華麗) bright and beautiful
  • : 屏構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 錦屏 : jinping
  • 水電站 : [簡] (水力發電站) hydroelectric (power) station; hydropower station水電站自動化 automation of...
  • 水電 : hydroelectricity; hydropower; water and electricity
  1. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就二級(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。
  2. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    一級位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  3. Structural analysis for the liner and surrounding rocks of diversion tunnel in jinping waterpower station

    二級深埋引隧洞襯砌及圍巖結構分析
  4. The structure of jinping cascade 2 hydropower station is a high - head and high discharge diversion tunnel with low crown gate

    二級是一首部設低閘,採用長隧洞引的高頭、大流量的引
  5. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明一級壩區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱肩槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體穩定性進行了系統分析、計算與評價;應用塊體理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、出露范圍,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  6. It also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. in addition, it is also used for drilling small size water wells and high - pressure jet grouting holes. it has been already widely used in various projects such as water power stations in yunnan, guangxi, sichuan and hubei provinces. it has also become the first priority machine for medium - duty anchoring - reinforcing projects in china

    在雲南小灣廣西灘糯扎渡及景洪,長江上游的溪洛渡向家壩金安橋,烏江上的洪家渡構皮灘,黃河上的拉西瓦公伯峽,雅江上的錦屏水電站已經大量使用, yg - 80型錨固鉆機已成為國內巖土錨固工程中的主力機型。
  7. As to the tunnels of jinping hydroelectric power station in sicuan province, the thesis discusses how to reasonably consider the initial stress field when designing a large - scale tunnel with high initial stress and deep buried. first, by analyzing of the rock lab tests and discusses the feature of regional geomorphology. explains the production of initial stress field, analyze the initial stress of jinping hydroelectric power station ; second, using the fem, the paper creates the real model of region. according to the results of stress measurement point, by combining of ann and fem to decide the boundary condition, the paper calculates the initial stress field ; at last, the paper analyzes the influence of the initial stress field formed from different condition on the deformation and stress of the surrounding rock, and the main factor to influence the initial stress. on the basis of the former work, the author proposes some proposals, which will be helpful for studying and designing of the similar undergroun d engineering

    首先從巖體的應力?變形的特性入手,並結合工程區域的地形地貌特徵,對巖體初始地應力場的形成做出解釋,結合錦屏水電站初始地應力的現狀提出了將地應力場進行分帶;然後建立整個工程區的實體模型,在地質分析的基礎上,以工程區右半部分為代表,參照實測點的初始地應力值,採用了神經網路與有限元相結合的方法反演了該區域的初始地應力場;最後模擬隧洞的開挖,通過計算比較分析了初始地應力場對處于不同應力帶內的隧洞圍巖穩定性的影響,在此基礎上提出了作者的建議,力圖為該類工程的研究設計工作提供有益的幫助。
  8. In order to calculate the high external water pressure, the rock seepage field and external water pressure coefficient should be treated in detail. concentrated on the questions of high external water pressure and flow of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied, the high external water pressure of jinping cascade 2 hydropower station is analyzed and studied in detail

    本文在總結前人研究成果的基礎上,圍繞深埋隧洞的突涌和高外壓力問題,系統地研究了深埋隧洞襯砌荷載和外壓力的作用機理及計算方法等理論,並對二級深埋引隧洞的外壓力問題進行了詳細的分析和研究。
  9. The jinping hydroelectric power station, located between from kala to the outlet of the yalong river, is designed as the first huge project of the river, which is rich in hydro logical energy

    一級是位於我國能資源「富礦」之一的雅礱江卡拉?江口河段的「龍頭」庫梯級,具有良好的補償調節作用。
  10. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外壓力問題,進一步分析和研究了襯砌荷載及外壓力的作用機理和計算方法; ( 4 )以二級深埋長引隧洞作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對排方案和灌漿封堵方案不同情況下的滲流場的頭分佈進行了數值模擬,並對其外壓力進行了分析和研究,提出了滲流控制的具體措施。
  11. The four diversion tunnels of jinping cascade 2 hydroelectric power station is 16. 625 km long averagely and 2525m deep in maximal bury - depth. in the construction region the maximum of principal geostress reached 54mpa

    二級四條引隧洞平均長度16 . 625km ,最大埋深達2525m左右,洞線高程處地應力最大主應力值達54mpa ,工程區屬高地應力區。