錨定拉力 的英文怎麼說

中文拼音 [máodìng]
錨定拉力 英文
anchor pull
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 拉構詞成分。
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 拉力 : pulling; pulling force; thrust; traction; tension拉力表 draw bar [pull] dynamometer; 拉力測定儀 [...
  1. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應索的結構、作用及其在滑坡防治中的應用進行了詳細的分析;基於施工現場的地質條件,對索最佳固段長度進行了理論計算;制了實驗研究方案,進行了前期實驗、現場標實驗、實地張實驗;對兩組結構型式的十組鋼絞線內應及總張的實驗數據進行了研究,提出了提高預應固性能的措施,以及具體的施工方案和施工工藝。
  2. Our company is specialized in supplying all kinds of terminal block, switch test double block, ground block, fuse block, three - level sensor block with light, double block, universal block, integral block, nylon cable ties, cable ties, releasable cablle ties, self - locking cable tie, marker calbe ties, flexible pipe, cable marker, expansion nail / plug, wire joint, cable clamp, nail clip, screw on wire connector, self - adhesive tie mount, spiral wrapping band, wire connectors, cable tie mounts, nylon fasteners, cable gland, nylon ties, cable terminal, terminals, terminal connector, wiring duct, pre - insulated terminals, cable markers, electrician tools, cabling accessories, plastic cable ties, wire tie, tie wrap, beaded tie wraps, tie wrap adhesive, tie wrap tool, cable, wires, terminal connector, terminal block, nail, nylon cable glands, pe tubing and quick screw connector, circle nail cable clips, self - adhesive tie mounts, expand nails, spiral wrapping bands, screw on wire connectors, copper connecting terminals, pre - insulated electrician tools, wire connectors, cable tie mounts, nylon fasteners, nylon ties, cable terminal, pre - insulated terminals, cabling accessories, plastic cable ties, wire tie, tie wrap, beaded tie wraps, tie wrap adhesive, tie wrap tool, cable, wires, terminal connector, terminal block, nail, nylon cable glands, cable accessories, wiring accessories etc. we offer superior product and best service with competitive price

    我們公司是專門供應各種終端塊,交換機測試雙重座,地面座,保險絲座,三層傳感器座輕型雙座通用塊,積分塊,尼龍電纜聯系,電纜聯系,松解索關系自鎖式電纜接頭,光纜標記關系,軟管,電纜標記,膨脹釘/插頭,電線接頭,電纜鉗,夾釘,螺絲電線連接,自粘配合摩,螺旋帶包,導線連接器,線纜配合固座,尼龍緊固件,電纜壓蓋,尼龍關系,電纜終端,終端,終端連接器,電線導管,預終端絕緣,電纜料,電工工具,電纜配件,塑料電纜聯系,配合鋼絲,為配合劇情,串珠配合纏上搭膠包裹,包裹配合工具,電纜,電線,終端連接器,終端塊,釘,尼龍索腺體,聚乙烯管材及快速接頭螺絲,圓釘電纜夾,自粘配合固座,擴大釘,螺旋帶包螺桿導線連接器,銅接線端子,預絕緣電工工具,電線接頭,電纜接頭固座,尼龍鏈,尼龍關系,電纜終端,預終端絕緣,電纜配件,塑料電纜聯系,配合鋼絲,為配合劇情,配合串珠包,搭包膠,配合工具包,電纜,電線,終端連接器,終端塊,釘,尼龍腺體電纜,電纜配件,線路配件等,我們提供卓越的產品和最好的服務,具有競爭的價格
  3. Standard test method for rock bolt anchor pull test

    石栓錨定拉力試驗的標準試驗方法
  4. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄洪閘預應閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應閘墩的三維有限元模型,該模型可方便地按預應索的點位施加索預張,考慮了可能發生的多種荷載工況組合,並與無預應閘墩結構進行了對比分析研究,指出其預應效果是明顯的,可以大大改善閘墩結構的受狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應成果和各荷載下的位移成果,這些成果的取得對預應閘墩的設計具有一的指導和參考價值。
  5. The new construction technique applied to the huge steel boxed cofferdam for foundation of pylon pier no. 2 of wuhan tianxingzhou changjiang river rail - cum - road bridge was to fabricate the cofferdam in integrity in workshop, shift it down to river and float it to the pier site where it is then accurately positioned by pre - tensioning at the anchor pier

    摘要武漢天興洲公鐵兩用長江大橋2號主塔墩基礎大型鋼吊箱圍堰採用工廠整體製造,下河浮運至墩位,利用墩施加預精確位的施工新工藝。
  6. The flexible retaining structure is another important retaining structure in soft soil. the integrated numerical analysis of this retaining structure ( including the methods and theory of calculating active earth pressure under sorts of conditions as well as the calculating method of horizontal stiffness coefficient of bracing structure and the method of deciding boundary condition etc. ) was gived. the effect of all parameters on the characteristics of retaining structure was discussed using methods of sensitivity - analysis

    本文針對目前常用的彈性支點法,給出了完整的數值分析方法,包括各種條件下的墻後土壓的計算方法和原理、支撐系統(或系統)水平剛度系數的計算、邊界條件的確方法等,並以此為基礎採用靈敏度系數分析方法討論了各參數對圍護結構形態的影響,指出土體側向基床比例系數是影響圍護結構變形的最主要的參數。
  7. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推計算結果和本滑坡屬牽引式滑坡的特點,滑坡體上部相對較穩,中下部處于基本穩或不穩狀態,因此建議此滑坡治理採用上部削坡減載與抗滑樁、擋墻進行支擋結合的處理方法,同時結合截排水等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基座和底界層及分佈特點和分析,將本工程危巖體失穩崩塌的方式歸納為墜落式、傾倒式和滑塌式三種類型並分別提出相應的穩性計算方法; ( 6 )分別對本工程中的危巖體進行了穩性計算,並且發現其都處于不穩狀態,因此根據實際情況分別提出相應襯砌支撐和清理等加固治理措施,最後還對加固后的危巖體進行了校核計算,滿足要求。
  8. According to calculating and analysis, educes the distributing laws and their correlations of horizontal displacement and stress of stabilizing pile, anchor pull and earth press in two sides of pile, including the distributing of point repel force and internal force of pile at the terminal state, providing full theoretical basis for anchor cable and stabilizing pile structure design, strength check, stability check and determination of anti - slide force for a single stabilizing pile

    通過計算分析,得出了抗滑樁的水平位移、樁身應和樁側土壓的分佈規律和它們之間的相互關系以及極限狀態時的樁的結點抗和樁的內分佈規律,為索樁的結構設計、強度校核、穩性校核和單樁抗滑的確提供了充分的理論依據,同時也提出了索抗滑樁計算分析的一種新方法。
  9. In order to optimize the perpetuation tensioning tonnage of prestressed pier anchor wire of goupitan arch dam, first the scheme contrast method is adopted to define the perpetuation tensioning tonnage combination of the primary and secondary anchor wire, but the optimization result is that the pull - anchor coefficient is too big ; then the body form of the pier is optimized ; finally the anchor wire perpetuation tensioning tonnage is optimized by using ansys optimization design module based on parametric fem, the optimization result is acceptable and the pull - anchor coefficient is lowered down

    摘要為優化構皮灘拱壩中孔預應閘墩索永存張噸位,首先採用方案優選的方法確主次索永存張噸位組合,但優選結果系數偏大,再對閘墩體型進行優化,然後採用基於參數化有限元的ansys優化設計模塊對主次索永存張噸位進行優化,優化結果滿足應控制要求,降低了系數。
  10. The distance from figure center of the parabola to the potential slide surface is less than half of the section length. mechanical conditions of this method include not only force equilibrium but also moment equilibrium. as for the beam - on - foundation, its pressure can be calculated by homogeneous hypothesis or winkler foundation hypothesis or infinite half elastic foundation hypothesis on the pulling anchor - cable step and by coulomb active earth pressure theory approximatively on the long term working step

    對于樁在滑面以上段所受的坡體荷載,提出可按形心偏下的拋物線型分佈模式計算,並在滿足的平衡條件的同時還滿足矩平衡條件;對于地樑上作用的坡體荷載,提出在索張階段可按均布或溫克爾( winkler )地基假或彈性半無限體地基假來計算,在工作階段則一般可以近似按庫侖主動土壓理論計算。
  11. Slope pressure on the beam - on - foundation can be calculated by winkler foundation hypothesis or infinite half elastic foundation hypothesis on the pulling anchor - cable step and by coulomb active earth pressure theory approximately on the long term working step. in addition, calculation methods of internal force of prestressed anchor - cable beam - on - foundation are provided

    對于作用於地樑上的坡體荷載,提出在索張階段可按winkler地基假或彈性半無限體地基假來計算,在工作階段則一般可以近似按庫侖主動土壓理論計算。