錨指 的英文怎麼說
中文拼音 [máozhǐ]-
Domino effect occured while the anchor cable group was destroyed
指出群錨整體破壞形態存在傳遞多米諾效應。Results as following : in the east china sea and the yellow sea, zooplankton showed higher diversity in the low latitude and warm species occurred mainly in the south of 31 n, five communities were distinguished by twinspan method, based on data of species composition and environmental factors. they are : i ) yellow sea neritic community ( f ) with indicator species of labidocera euchaeta in autumn and centropages mcmurrichi in spring ; ii ) yellow sea central community ( hc ) with indicator species of themisto gracilipes, calanus sinicus and euphausia pacifica, the latter two species occurred only in autumn ; iii ) east china sea continental shelf mixed water community ( k ) with indicator species such as rhincalanus cornutus and pterosagitta draco which were confined in waters with high temperature and salinity, iv ) yellow sea and east china sea mixed water community ( he ) and v ) east china sea inshore mixed water community ( m )
根據twinspan等多元分析結果,比較各組群的浮遊動物種類組成和環境特徵,可將東、黃海浮遊動物群落分為5個,黃海沿岸群落( f ) ,指示種秋季為真刺唇角水蚤,春季為墨氏胸刺水蚤;黃海中部群落( hc ) ,指示種以細長腳蟲戎為主,秋季還有中華哲水蚤和太平洋磷蝦;東海外陸架高溫高鹽群落( k ) ,指示種為角錨哲水蚤、飛龍翼箭蟲等多種狹布型暖水種類;黃東海交匯區群落( he )和東海近岸混合群落( m ) ,兩群落包含多種生態類型種類,其中溫帶近岸低鹽種在he中較多,廣布性暖水種在m群落中較多。Specifies a square anchor line cap
指定方錨頭帽。Some boats also use a " tag line " or " head line " from the stern of the boat to the anchor line, which serves as a guide in a current so that it is easier to reach the anchor line for ascents and descents
一些船還用「標志繩」或「頂繩」從船尾連接到錨繩作為水流的指引,以便潛水人在上升和下降時更容易地找到錨繩。It is indicated in the test that the influence of loading to strain in the grout was about in the range of 5 ~ 6m, and very weak beyond 4m. the distributions of strain and bond stress in the grout are attenuated in the minus exponential rule
試驗結果表明,加載對錨固段內的應變影響范圍大致在5 6m左右, 4m以外很微弱;錨固段注漿體內的應變與粘結應力分佈按照負指數規律衰減。The following skills can no longer be trained on trial accounts : anchoring, starbase tactical officer, cloaking, cynosural field theory, drug manufacturing, gas cloud harvesting and all field - specific r & d agent skills
以下技能將不能在試用賬號上學習:錨定、隱型、母星戰術指揮訓練、誘導力場理論研究、藥品制備、氣體採集理論,以及所有領域的特定研究製造方面的技能。Citing five - meter - high nanfei river rubber dam in hefei, one of the highest double - anchor water rubber dam in china as an example, while deeply analyzing some representative rubber dam projects in china, the article theoretically exploits the relationships among some technical parameters such as anti - pull intensity, internal pressure ratio, circum - oriented relative extending rate, etc. also has the author brought up his own opinion on rubber dam design & calculation theory, which is of high theoretical and applicative value for parameter optimization and combination of water rubber dam with a height of above 3. 5 meters. it also helps when building over - five - meter - high rubber dam using seamless rubber dam and rubber dam with steel wire as its frame. this article also exploits safety measures for designing & building rubber dam in navigation areas
本文以充水式雙錨固橡膠壩目前國內最高(壩高5m )之一的合肥市南淝河橡膠壩工程為例,並在對全國目前已建橡膠壩代表工程進行深入分析的基礎上,對壩袋的抗拉強度、內壓比、環向相對伸長率等技術參數之間的關系進行了理論探討和研究,並對橡膠壩設計計算理論提出了自己的見解和看法,對指導設計壩高3 . 5m以上的充水式橡膠壩技術參數的優化組合具有重要的理論和應用價值,特別對應用無搭接縫橡膠壩、鋼絲網骨架橡膠壩建造壩高大於5m的橡膠壩具有指導意義。This paper has come to some comprehensive conclusions on the basis of the practical use of this double - index evaluation method in the slope of pishihang channel. a calculating program for the double - index evaluation method is compiled to raise the calculating efficiency. the reinforce measures that adopt the new thesis of renewing stress and the expansive anchor are presented
本文針對淠河總乾渠(城區段)邊坡這一實際工程引入了安全系數和可靠度相結合的雙重指標體系分析方法進行穩定分析,得出了較為全面的結論;在雙重指標體系分析方法的基礎上編制了計算程序,提高了計算效率;應用應力重塑新思想及其配套實施手段?膨脹錨提出了初步的邊坡加固解決措施。Finally, the thesis primarily sets up the internal force model of the supporting structure system in the bi - arch tunnel, namely, the distribution model of the surrounding rock ' s pressure, the internal force model of the steel framework and the axial force model of the anchor bolt, and these results can have the guiding significance to the design and construction of the similar tunnel engineering
最後,結合有限元的理論計算及現場實測數據的分析,初步建立了雙連拱隧道支護結構體系的內力模型,即:圍巖土壓力模型、初期支護鋼拱架內力(主要為軸力和彎矩)模型以及錨桿軸力模型。充分理解和闡述了構件的工作狀態,對今後類似隧道工程的設計和施工具有一定的指導意義。Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier
本文結合黃河小峽水電站泄洪閘預應力閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力錨索的點位施加錨索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。Vessels are only allowed to anchor within the anchoring areas
船隻只可以在指定泊船區內下錨。Secondly, compared with specification jgj 120 - 99, the problem of method which be using was pointed out base on a great number of numerical simulation, the interaction between pile - anchor supporting and soil nailing was analyzed
其次,針對現行樁錨復合土釘支護設計方法,在大量數值模擬的基礎上,通過與規程進行對比,指出現行方法中存在的一些問題,並分析了土釘支護與樁錨支護二者之間的相互作用。Secondly, in view of the limitation and shortage of traditional simulation of finite element approaches for bolt, a new composite grouted bolt element including nonlinear contacting relation will be built based on the above study of the mechanics mechanism of fully grouted bolt. then, an elastic - plastic finite element program will be developed for the analyses of tunnel stability, in which the composite grouted bolt element and nonlinear finite element analysis method will be used ; the patterns and the affect of main design parameters on the support effect of bolt will be analysed using the program, and conclusions of guidance importance for tunnel support design will be drawn. finally, simulation compution for the excavation and support of a highway tunnel will be made out using the above production, and the method of application of the program will be discussed ; analysis of the deformation, stress and distribution of plastic range will be done, and rational support plan will be worked out, which is of guidance importance for tunnel support design and the thery and technique of fully grouted bolt used in tunneling will be perfected further
首先,本文在綜合分析隧道穩定性影響因素及失穩破壞模式的基礎上,對全長粘結式砂漿錨桿作用力學機理進行了深入研究,為全長粘結式砂漿錨桿的有限元模擬分析奠定了基礎;其次,針對傳統錨桿有限元模擬方法的局限性與不足,在上述全長粘結式砂漿錨桿作用力學機理研究基礎上,建立出能反映界面非線性粘結的新型復合砂漿錨桿有限單元模型;然後,運用上述復合砂漿錨桿單元模型,引進非線性有限元分析手段,開發了隧道支護穩定性分析的有限元程序,並就全長粘結式砂漿錨桿的型式與設計參數對支護效果的影響進行了深入探討,得到了對隧道支護設計具有指導意義的結論;最後,運用本文研究成果對某公路隧道工程實例進行了開挖與支護的模擬計算,探討了其應用方法,並就隧道變形與應力及塑性區分佈規律進行了分析,從而提出了合理的支護方案,為隧道支護設計提供了參考依據,完善了隧道全長粘結式砂漿錨桿支護的理論與方法。According to the the regression analysis on the bloting and shotcreting roadways of henan pingmei group, the regression equation on the degree that absolute grade and area of roadway influence coefficient of frictional resistance is built in the paper. the notable character test of the regression equation is completed. at last, the degree that absolute grade and area of roadway influence coefficient of frictional resistance is discussed and summed up. the practical and guiding sense in choosing coefficient of frictional resistance of congeneric roadways is given in the paper
通過對平煤集團大量的錨噴巷道的回歸分析,建立了巷道壁面絕對粗糙度和巷道斷面積對摩擦阻力系數影響程度的回歸方程,並對回歸方程作了顯著性檢驗,最後對巷道粗糙程度和斷面積對錨噴巷道摩擦阻力系數的影響程度進行了討論和總結,對同類巷道摩擦阻力系數的選取具有實踐指導意義。An iron shaft with claws at one end, usually thrown by a rope and used for grasping and holding, especially one for drawing and holding an enemy ship alongside
抓鉤,多爪錨一端有爪的鐵矛,通常用繩子拋出並用來抓持和固定,尤指用於沿著邊拖拽和固定敵船的那種Specifies a mask used to check whether a line cap is an anchor cap
指定用於檢查線帽是否為錨頭帽的掩碼。In this paper, author compare with shenzhen holiday plaza project ( be known as firstly deepest foundation pit, deepest excavation depth is 21m ), use combinative method for theory guidance, test study, simulation analysis, project application and information feedback, entirely and deeply study prestress anchor cable composite soil nail, and also make a pilot study for deformation of pile anchor composite soil nail
本文以深圳假日廣場深基坑支護工程(號稱「深圳第一坑」 ,最深開挖21m )為背景,採用了理論指導、試驗研究、模擬分析、工程應用和信息反饋相結合的方法,對預應力錨索復合土釘支護結構進行了全面深入的研究,對樁錨式復合土釘支護結構的變形進行了初步研究。The calculation formulas of loading capacity are deduced by the formula of average bond strength that is concluded from experiment results. then based on reliability analysis of anchorage length, design formula and table for anchorage length with reliability guarantee that are suitable to every kind of condition are given
用通過試驗結果回歸的平均粘結強度公式推導出承載力計算公式,選取合適的可靠指標,對植筋的錨固長度作可靠度分析,得出可用於各種情況下的具有可靠度保證的植筋錨固長度設計公式及表格。The emphasis is given on the studying of the horizontal displacement on the retaining structure consist of piles and anchors, which is a frequent type of retaining structure. it is founded that the rigidity of anchors and magnitude of pre - stress are the main factors which influence the deformation of retaining structures. the optimal design method on pile - anchor systems is presented
樁錨支護是一種常見的基坑支護模式,本文以樁錨支護結構水平位移為重點,對支護結構剛度、支撐剛度與預應力、支護樁入土深度等對樁頂水平位移的影響進行了分析,指出在樁錨支護體系中,錨桿支撐剛度及預應力對基坑變形的影響最為明顯,並通過工程實例加以驗證。The goal of the xsl file is to identify the anchor, specify how to get from that anchor to the data we are looking for in short hops, and construct an xml output file in the format we want
Xsl文件的目的是標識錨,指定如何從錨獲取我們正在查找的數據(以簡短跳躍的方式) ,並且用我們所需的格式構造一個xml輸出文件。分享友人