錨索計 的英文怎麼說

中文拼音 [máosuǒ]
錨索計 英文
rope meter
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  1. The traditional design method of cable - anchor support only considers the suspension action of single one, and loses sight of the anchoring effect of cable - anchors group, increasing the blindness of cable - anchors support ground

    摘要傳統方法只考慮單根的懸吊作用,而忽略了群效應,加大了加固的盲目性。
  2. Another based mathematics model about the anchor cable is used for ship - anchor system. the numerical calculation have been worked by programmed in the matlab language. at the same time the influence that the dragging speed of antisubmarine helicopter and the height over the surface of ocean acts on the shape and the tension of underwater cable, and that the current velocity and the diameter of anchor cable acts on the shape and the tension of anchor cable, has been calculated

    把建立的水下拖數學模型和數學模型分別應用於航空吊放聲納探頭?纜繩動力學系統和船?系統,採用matlab語言編程進行了數值算,同時分別算和分析了反潛直升機拖速、距海面高度對拖形狀和張力的影響以及海流速度、直徑對形狀和張力的影響。
  3. The two models of rigid and elastic piles have been discussed respectively, in which the anchor cable will be regarded as an elastic hinge. under the consideration of deformation harmony of anchor cable with piles bodies and pile bottom conditions, the solutions of the internal forces distribution along piles bodies are presented

    本文分別按剛性樁和彈性樁兩種物理模式,將視為彈性絞支座,利用抗滑樁和位移變形協調條件,算出不同樁底條件下抗滑樁的內力分佈。
  4. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應力的結構、作用及其在滑坡防治中的應用進行了詳細的分析;基於施工現場的地質條件,對固力及最佳固段長度進行了理論算;制定了實驗研究方案,進行了前期實驗、現場標定實驗、實地張拉實驗;對兩組結構型式的十組鋼絞線內應力及總張拉力的實驗數據進行了研究,提出了提高預應力固性能的措施,以及具體的施工方案和施工工藝。
  5. Internal force calculating method of prestressed - cable beam - on - foundation for high rock slope

    巖石高邊坡預應力地梁的一種內力算方法
  6. Depend on the advantage of military industry, it has been a professional company which could research, develop, design and machining pre - stress cable anchor, bolt and other machine

    藉助軍工優勢成為一家集科研設加工預應力具和機具的專業企業。
  7. The design of bolt - rope support in no. 9 seam entries

    9號煤半煤巖巷道支護設淺析
  8. Dynamic design for anti - slide piles with prestressed anchor cables

    預應力抗滑樁的動態設
  9. ( 5 ) the software combines anti - slide pile with anchor wire anti - slide pile, apply the matrix analyses method to design anti - slide pile. and 3 anchor wires on the anti - slide pile

    ( 5 )軟體將普通抗滑樁與拉抗滑樁進行有機地結合,抗滑樁設採用矩陣分析法,拉樁設可考慮3排
  10. Besides experiments, the present domestic and abroad study on anti - slide pile is mainly analysis by traditional cantilever beam method, foundation coefficient method and elastic mechanic method. on the basis of previous studies, this paper carries out a research on relevant design and calculation theory about anti - slide piles, comprising the interaction between anti - slide piles and rock and soil of side slopes, the soil arching model of anti - slide piles and the internal stress calculation method of prestressed anchor cables

    目前國內外對抗滑樁的研究,除試驗研究外,主要採用傳統的懸臂梁法、地基系數法及彈性力學方法來進行分析。本文在前人的研究基礎上,通過對抗滑樁相關設算理論進行研究,包括抗滑樁與邊坡巖土體的相互作用,抗滑樁的土拱效應模型以及抗滑樁預應力的內力算方法進行分析。
  11. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄洪閘預應力閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力的點位施加預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設具有一定的指導和參考價值。
  12. Calculating method of landslides drive force, and determination of the diameters of borehole and anchor cable, the number of the anchor cables, the anchorage length and types of the anchor head as well are also discussed

    本文還探討了作用在抗滑樁上的滑坡推力設值的算方法,以及材料的選定、固深度算、頭類型選擇、與樁的連接設、施工工藝與質量控制措施、檢測與監測等等。
  13. This paper presents analysis on the engineering geologic features, cause of revival and prediction of the developing trend of the captioned landslide in zigui county, together with the proposed treatment measures, which will be of reference value for other landslide treatment practices

    摘要在論述三峽庫區秭歸縣歸州四號滑坡工程地質特徵、復活原因、後期變化趨勢的基礎上,提出滑坡治理方案,進行預應力抗滑樁、樁間檔土板、植被護坡、地面排水等分項工程設,總結本滑坡治理工程的設經驗,供其它滑坡治理工程參考。
  14. On the basis of the important research project of the ministry of communications - the prevent and study of slope disaster in the project of beijing - zhuhai highway, the thesis developed the structure ' s design theory. in order to design more reasonable, the thesis propose the cohesion shear stress is unequal distribute at the anchorage zone. and it can be divided into two parts, the front function is uniform and the behind is exponential

    為了合理的進行工程設,本文按彈塑性理論對預應力固段的黏結剪應力進行了分析,將固段劃分為塑性變形區段和彈性受力區段兩部分,認為固段黏結剪應力為非均勻分佈,前段剪應力為均勻折減應力,後段剪應力為寸旨數變化應力,由此提出了相應的固段長度算公式。
  15. ( 2 ) for consolidation of the grottoes ’ slope, there ’ s no mature theory and technique. in this paper the back analysis of shear strength of the rock slope at yulin grottoes is presented. through the back analysis of shear strength, we can presents a procedure for the design of consolidation of the yulin grottoes in anxi. it is very important in the field of reinforcing the slope of grottoes

    ( 2 )目前對于石窟邊坡的加固研究尚無系統的理論和方法,本文以安西榆林石窟為例,提出了一種通過反演( c , )值來設加固石窟邊坡的方法。對于在未知巖體的抗剪強度( c , )值的條件下來設加固石窟邊坡,該方法的提出具有一定的理論意義和應用價值。
  16. As the main method of measurement in the tests, some strain measuring points are arranged on the reinforced steel bars of the anchor bearing body. the changes of strain with different loading levels at their locations have been measured, through which range of influence and distribution of strain with loading in grout can be investigated, and corresponding distributions of axial force and bond stress are calculated according to hooke ' s law. making use of nonlinear curve fitting, distribution equation of bond stress of the fixed unit anchor length is achieved

    試驗測試手段通過在承載體上布設應變測點,觀測在不同的荷載級別下的應變變化情況,對不同荷載級別下,單元注漿體內應變的影響范圍及分佈規律展開分析,依據虎克定律算出了其軸力與粘結應力的分佈;並對測試結果進行了擬合,得出了固段粘結應力分佈的擬合方程。
  17. In light of the existing problem in researching the mechanism of prestressed anchor rope foundation beam system, and based on the loading and deformation compatibility relation of foundation and foundation beam of prestressed anchor rope foundation beam system, through decomposition and discretization of prestressed anchor rope foundation beam system, a new theoretical calculation method that can consider the interaction of prestressed anchor rope foundation beam system, is proposed

    摘要針對現階段預應力地梁與地基共同作用機理研究方面存在的問題,以預應力地梁和地基巖土體之間荷載、變形協調關系為基礎,通過對預應力地梁體系的分解和離散化處理,建立了能考慮預應力地梁體系共同作用的預應力地梁算理論和方法。
  18. As products of the tests, anchor bearing body and a device for strand pre - bending practical for engineering application have been developed

    作為試驗的附屬產品,設和研製出了具有工程實用性的承壓板與鋼絞線彎曲裝置。
  19. In the end, according to achievements from home and foreign countries in related research and those gained in the on - site test, two design methods for compression dispersion - type anchor are provided in this paper, the first one is experiential des

    最後,綜合國內外的相關研究成果以及現場試驗成果和理論算結果,提出了壓力分散型的經驗設方法和基於峰值粘結應力的設算方法。
  20. By the test of anchor cable pull - out intensity, research is carried on anchor capability, stiffness coefficient and prestress losses of anchor cable in reinforcing similar soil slopes. the mechanisms of reinforcing similar soil slopes by prestressed anchor cable sash ( beam ) are studied by the method of combination of field test, theory analysis and numerical simulation, as a result, the calculational pattern of internal force of anchor cable sash ( beam ) is put forward

    本文通過大量野外調查,提出類土質邊坡的概念,並分析了它不同於一般粘性土邊坡的特性;通過抗拔試驗研究了類土質邊坡的固力大小、剛度系數和預應力損失情況;通過現場試驗、理論分析和數值算相結合的方法,研究預應力框架(地梁)加固類土質邊坡的機理,提出預應力框架(地梁)的內力算模式。
分享友人