鍋爐負荷 的英文怎麼說

中文拼音 [guō]
鍋爐負荷 英文
boiler duty
  • : 名詞1. (炊事用具) pan; pot 2. (裝液體加熱用的器具) boiler; cauldron3. (某些器物上像鍋的部分) bowl (of a pipe, etc. )
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 鍋爐 : boiler; furnace
  • 負荷 : [電學] load; charge; weight
  1. Boiler is the heat equipment in common use best of all, which can supply qualified steam for the requirement of steam quantity adapting to burthen

    是最常用的熱工設備,其要求是供給合格的蒸汽,使產汽量適應的需要。
  2. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該在實際運行中存在的問題:在額定下,膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁結焦嚴重,過熱器管壁溫度超標,無法帶上額定;甚至有時因燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的結構、布置,水冷壁的粘污、結垢,過剩空氣系數、一次風溫、煤種及其濃度變化等許多因素都會偏離的設計工況,從而影響內的傳熱和燃燒,造成膛出口超溫、水冷壁結渣等問題。
  3. Boiler plant load forecasting based on bp artificial neural network

    神經網路的工業預測
  4. In order to improve the peak load regulation performance of boiler and decrease its consumption of oil, the burners were retrofitted by using adjustable horizontal concentrated - diluted pulverized coal burners combustion technology and small oil gun ignator

    摘要為提高調峰性能和降低耗油量,利用可調水平濃淡燃燒技術和小油槍點火裝置,對燃燒器進行了改造。
  5. According to the operation of subcritical reheat controlled circulation drum boiler, this paper analyses the factors which affect the responding speed to unit load, through modifying the coordinating control system, fully using the boiler ability of heat accumulation and other methods, the author puts forward some measures to raise responding speed to unit load

    分析了影響中間儲倉式汽包機組快速響應電網變化的因素,通過對協調控制系統的改進,以及充分利用蓄熱能力等方法,提出了提高機組快速響應變化的幾條途徑。
  6. The suggested control scheme fulfills automatic full range feedwater control by changing the structure and parameter of control system according to different stages of load, making full use of intelligent fuzzy logic function on conditons of remaining process system

    充分利用模糊智能控制系統的功能,在不改變工藝系統的情況下,從控制策略著手,隨工況的變化改變控制系統的參數,在點火、升壓、並網、升、降全過程實現自動控制。
  7. Load assignment strategy for natural gas - fired boilers in tsinghua university

    清華大學燃氣分配策略
  8. The burners of 220 t / h boiler in henan shenhuolv power plant were retrofitted by using the pulverized coal burners with stabilized - firing cavity and cutting down the distance between up - primary air and down - primary air etc. technologies, thus the boiler was successfully converted from originally designed burning high calorific value coal to low calorific value coal, the boiler could operate stably at 50 % load without oil - firing aid and the thermal efficiency of boiler reached 89 %

    摘要採用穩燃腔煤粉燃燒器並集中布置上、下一次風等技術對河南神火鋁電廠220t / h燃燒器進行改造,成功地將該原設計燃用優質煤改燃為普通煤,並取得了改造后50 %可無油穩定運行,熱效率達到89 %的良好效果。
  9. Abstract : the air / fuel ratio control scheme in common use of boiler auto - burning system is introduced summary. two kinds of scheme improved to obtain the best air / fuel ratio and to raise dynamic characteristic are analyzed in particular. further how to correct measures on air / fuel ratio when changing boiler load and fuel composition is proposed and analyzed

    文摘:對自動燃燒系統中空氣/燃料比控制的常用方案進行了簡要介紹,著重分析了兩種為獲取最佳空氣/燃料比和提高控制系統動態特性而採取的改進方案,並針對鍋爐負荷變化和燃料特性改變對燃燒狀況的影響,進一步對空氣/燃料比的修正措施進行了分析與探討,提出了綜合修正方案。
  10. Actually, known the distribution of electric price and demand of heat load versus time, an optimizing supply curve can be drawn, that is, the concrete economically running policy can be made

    實際上,在已知逐時電價曲線和用戶熱曲線的情況下,應存在一條最優的供熱曲線(或電啟停曲線) ,這條曲線可利用最優化理論和適當的優化方法來找到。
  11. This paper introduce the features of a kind of electric heating atmospheric boiler which is of high efficiency on energy transferring, non - pollution, starting and stopping quickly, wider range of load adjusting, simple body structure, etc. in addition the paper introduce the design idea briefly

    電加熱具有能量轉化效率高、零污染、起停速度快、調節范圍大、本體結構簡單等特點,文章具體介紹了一種常壓熱水電的設計。
  12. After studying the prediction method and considering the complex, random and nonlinear factors that affect the demand load of heating, the ann technology is adopted. different from the general analysis in technology and economy, it is for the first time to combine the prediction in method of artificial neutral network with optimization in use of dynamic planning principle for the running analysis of the electric boiler

    考慮到影響供熱採暖需求的因素復雜且具有隨機性和非線形性,在對預測理論進行研究和對各種預測方法進行比較后,本文首次將基於人工神經網路的預測與基於動態規劃原理的優化方法相結合,用於蓄熱式電系統的經濟運行策略研究。
  13. During the heat accumulator supplying to users, the electric boiler usually try to make heat by starting at low price of electric and stopping at high. in general, the system of electric boiler with heat accumulator runs according to experience to utilize the time - of - use electricity price or controlled by the signals of water level or temperature

    當前運行的蓄熱式電供熱系統中電的啟停控制一般有兩種方式:一種是根據分時電價和用戶熱由人工啟停,另一種是根據蓄熱器的水位或水溫信號由自動控制裝置啟停。
  14. The response was compared with that obtained through simulation realized by the use of matlab and the actual process on different steam flow, feed water flow, fuel flow and control method

    並運用matlab模擬工具,針對水位和汽壓調節對象模擬模型在不同的蒸汽、不同給水量、不同燃油量和不同控制方式下的動、靜態情況進行模擬研究。
  15. This temperature calculation method avoids the non - correspondence between the flow rate and heat flux, which may exists in that used by boiler manufactures, and was employed to calculate the tube temperature of dangerous position that concerns with the retrofit scheme of superheater 1 of tower type coal - fired 330 mw once - through boiler in pucheng power plant for 100 % and 50 % operation load

    針對蒲城電廠330mw塔式燃煤直流1號過熱器的改造方案,利用本文提出的方法與電廠常用的壁溫計算方法分別計算了100 %與50 %運行下危險部位的壁溫。
  16. The research objective is to improve the control system performance through the combination of the advanced control strategy with the meaningful information mined from the history operation database. firstly, a new solution for the control performance enhancement is presented by the reference of the kdd technology. aiming at practical application, a novel boiler load control method, which combines the multiple model adaptive control strategy with the data mining technology, is put forward in this dissertation

    本文第一部分為熱工過程式控制制與數據信息採掘,研究的重點是通過先進控制策略的應用以及運行數據中發掘的有用信息,提高現有典型熱工過程式控制制系統的性能,內容包括:首次提出了借鑒數據信息採掘技術的思路和方法,用於完善現有的熱力系統優化控制方案;在此基礎上結合生產實際,提出了運用多模型自適應策略實施鍋爐負荷控制,並利用關聯規則的數據信息採掘方法,通過對燃料發熱量信息的在線診斷,優化控制器結構,同時實現燃燒配風的自適應調整,提高、燃燒控制系統性能。
  17. Abstract : the causes of water seepage and bubbles appeared on foundation for the convection chamber of a gas burning boiler was analyzed, and treatment measures to these problems were established which make the adjustment to boiler load flexible and are effective, eliminating the risk potential for the boiler

    文摘:分析燃氣基礎滲水冒泡原因,制定處理方案,實施后鍋爐負荷調整靈活、效果很好,消除了以天然氣為燃料的運行中的隱患。
  18. Then, we turn to the modules of the monitoring system, their function, structure, constitution, working sequence etc. the result and analysis prove the reliability of the model and monitoring svstem, then we dicuss the main factor thai affect the monitoring model and system

    48小時實際連續運行數據作了模擬離線監測,監測結果分析驗證了監測系統與監測模型的準確性和可靠性,模型對鍋爐負荷有較大的適應性。並探討主要影響因素對監測結果的影響。
  19. Thus clean factor has good adaptability to boiler load, coal quality, excess air coefficient, working medium flow, and boiler efficiency etc. the calculated result gained by inputting the data of history database of the object boiler validates the correctness and adaptability to boiler load of clean factor model

    基於穩態傳熱的清潔因子灰污監測模型,對鍋爐負荷、燃煤品質、過量空氣系數、各類工質流量、燃煤量和熱效率等的波動變化有很好的適應性。以北侖電廠1 #歷史庫中數據為輸入數據,驗證了清潔因子模型的正確性和對穩定的適應性。
  20. The original design was intermediate vapor 42t / h, but the actual output is 30 - 35t / h, at the same time the temperature and pressure of the vapor are unstable, it affects the economic efficiency, the reason were the collecting dust on the heat area and serious corrision, they led to the decrease of the boiler load, and need stop to washing the dust, the article deals with the reform of the exhaust gas boiler, at the basic of the design condition, after thermo calculation, flute gas, resistence calculationand strenth calculation, the structure of the heat surface had been rearranged, then the proof calculation was done

    原設計產中壓蒸汽42噸時,但投運后只產30 - 35噸時,並且蒸汽溫度和壓力均不穩定,影響到經濟效益。其原因是受熱面積灰和腐蝕嚴重,影響傳熱使鍋爐負荷下降,不能長時間運行,需停產清理積灰。本論文針對此余熱的技術改造,在給定設計條件基礎上,通過熱力計算,煙氣阻力計算和強度計算,對受熱面結構重新布置,然後再作校核計算。
分享友人