鐵橋載荷 的英文怎麼說

中文拼音 [tiěqiáozǎi]
鐵橋載荷 英文
railway bridge loads
  • : Ⅰ名詞1 (金屬元素) iron (fe) 2 (指刀槍等) arms; weapon 3 (姓氏) a surname Ⅱ形容詞1 (形容...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 荷名詞(蓮) lotus
  • 鐵橋 : iron bridge
  • 載荷 : load; loading載荷變化 load fluctuation; variation in load; 載荷裝置 load device
  1. It calculate 60 driving speed kilometers / hour, it design 30 kilometers of speed of deck bridges road, ground of offices / hour, road calculate and load type standard cars standard bzz - 100s, iron do distance to city one for new urban north and southses by mountain path by road surface structure, calculation 40 driving speed kilometer / hour

    計算行車速度60公里/小時,跨線處地面道路設計車速30公里/小時,道路路面結構計算標準bzz - 100型標準車,山路為新城區南北向城市次幹路,計算行車速度40公里/小時。
  2. Lateral load distribution factors of three lines railway load on a box girder bridge

    三線作用下箱梁橫向分佈系數
  3. Study of train braking force on railroad bridge

    梁列車制動力研究
  4. 3. as to the vibration analysis of ground under lightway train load, it is different to railway and subway since its structural form generally is viaduct, whose load is time depending and located in some stationary position

    3 、對輕軌列車作用下的地基土的振動分析,考慮到輕軌的結構形式一般為高架,與普通路和地不同。
  5. 3. the ground vibration caused by load of vehicle in light railway system is analyzed as well. different from the common railway and subway, the viaduct is the main structural member in light railway system, which is studied in specialty in this paper

    3 、關于輕軌列車作用下的地基土的振動分析,本文考慮到輕軌的結構形式一般為高架,與普通路和地不同,因此,本文對這一問題進行了專門研究。
分享友人