鐵路費用單 的英文怎麼說

中文拼音 [tiěyòngdān]
鐵路費用單 英文
charges note
  • : Ⅰ名詞1 (金屬元素) iron (fe) 2 (指刀槍等) arms; weapon 3 (姓氏) a surname Ⅱ形容詞1 (形容...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ名詞1 (費用) fee; expense; expenditure; dues; charge 2 (姓氏) a surname Ⅱ動詞(花費; 耗費) ...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • 鐵路 : railway; railroad; rail
  • 費用 : cost; expenses; outlay
  1. Unless the document referred to in the preceding paragraph is the transport document, the seller must render the buyer at the latter s request, risk and expense, every assistance in obtaining a transport document for the contract of carriage for example a negotiable bill of lading, a non ? negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document

    除非前項所述據是運輸據,否則,應買方要求並由其承擔風險和,賣方必須給予買方一切協助,以取得有關運輸合同的運輸據如可轉讓提不可轉讓海運內河運輸據空運托運托運或多式聯運據。
  2. This dissertation is faced to the process of steel rolling to found network of manufacture material flow, basing on it founding guide line evaluation system of the cost of unit standard producing working procedure, guide line evaluation system of the quality cost of unit standard producing working procedure and guide line evaluation system of performance and efficiency ; and base on the cost data of all kinds of material flows, manufacture flow, flux data, manpower, energy consume, material consume, capital asserts occupied, fund occupied, and the production in working procedure, throughput of the materials in working procedures in the flow and countercurrent flow in the network of material flow of recorded in working procedure producing, using the “ whole closed down lane ” model to describe network of manufacture material flow of steel rolling, found the cost analyzing model system of the network faced to producing process. make the cost increasing of the producing by abnormity material flow in working procedure, and even the cost increasing of the producing procedure as the cost of the management behavior of working procedure fallen under cost evaluation guideline in responsible working procedure, so as to ration measure the factors fast correlated with management behavior by measuring the cost

    在企業管理信息化輔助工具所建立的數據平臺基礎上,建立了以基準物流圖模型為基礎的軋鋼生產主流程物流網拓撲圖,根據圖論的理論求解最大流量和最小;計算每個生產節點的加工成本,分離質量成本,克服了純財務數據進行成本核算所帶來的缺陷;建立了軋鋼生產主流程工序含物料吞吐能力基準圖模型,並根據此模型建立了軋鋼生產主流程工序激勵物流協調性和匹配性、工序響應物流協調性和匹配性分析的過程能力指數計算方法;通過引入決策元綜合投入與綜合產出效率最優原則的模型和基於投入不變、分析產出是否有效或基於產出不變、分析投入是否有效的模型,實現了對多個績效指標在不同績效值集合之間的相對比較,並可根據投入產出效率準則、或者投入(產出)有效性準則進行排序。
  3. To that project, it was simple to construct, little effect to original pole, the safety coefficient is higher, the expense is lower, reduce flap is obvious, each of testing result was satisfied the detection criterion of railway bridge and the request of increasing in speed, consequently, it is very importance to guarantee the safety and the whole increasing in speed of beijing to guangzhou line

    雙線剛性連接加固方案,施工簡易行,對原鋼件損傷小,安全系數高,加固低,減振效果明顯,各項測試結果基本滿足《橋梁檢定規范》及提速技術要求,因此對確保列車通過大橋安全及京廣線的整體提速具有十分重要的意義。
分享友人