長江三峽 的英文怎麼說

中文拼音 [zhǎngjiāngsānxiá]
長江三峽 英文
the three gorges on the changjiang river
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : 名詞1. (大河) (large) river 2. (指長江) the changjiang [yangtze] river 3. (姓氏) a surname
  • : Ⅰ數詞1. (二加一后所得) three 2. (表示多數或多次) more than two; several; many Ⅱ名詞(姓氏) a surname
  • : 名詞(兩山夾水的地方) gorge
  • 長江 : the changjiang river; the yangtse river長江鱘 acipenser dabryanus
  1. Relationship between the tolerance loss value of soil and the weathering and denudation rate of parent rock

    長江三峽壩區風化花崗巖土壤為例
  2. Effect of pipe flow on interflow on granite slope in three gorges area of yangtze river

    長江三峽花崗巖坡面管流在壤中流中的作用
  3. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的地質環境與工程實際情況,在充分考慮水對庫岸滑體穩定性影響的前提下,提出了一個適用於長江三峽庫岸滑坡體穩定性分析的綜合分析評價體系,並取得了如下幾個方面具有工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,水的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下水位升高降低了滑坡體的有效應力,另一方面是由於地下水的期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對庫區的特殊條件,系統分析了作用於庫區滑坡體上的力系和庫水位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或期降雨狀態) 、 175m庫水位、地震以及庫水位由175m調節下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用荷載的計算方法,使在庫區岸坡滑體穩定性分析評價時對計算工況選擇及其作用荷載的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於重慶市豐都縣名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對庫區的滑坡穩定性分析是實用可行的。
  4. Compute parameter data in rock mass quality assessment of the three gorge project dam foundation rock mass, and compare the results with former conclusion. the results accord with practical engineering projects

    長江三峽大壩壩基巖體質量分級的參數指標數據進行試算,並將得到的計算結果與原結論進行比較,結果符合工程實際。
  5. So, apart from many historical relics and tourist attractions, such as the ghost city of fengdu, stone treasure block, zhang fei temple and white emperor city, the 6, 000 meter long dam area adds much lustre to chongqing

    長江三峽的大半段已出現在重慶市境內, 6000米的庫區名勝古跡,諸如豐都鬼城,石寶寨、張飛廟、白帝城,使重慶更添風采。
  6. In ancient china, the three gorges area rich in well salt became an area inhabited by the minority descendents of linjun and panhu and the han people

    摘要盛產井鹽的長江三峽地區,在東漢及至南北朝時期,已逐漸成為稟君、盤瓠後裔與漢人交相雜居的地帶。
  7. Long - term prediction of annual maximum peak discharge at yangtze three gorges based on artificial neural network

    基於人工神經網路的長江三峽年最大洪峰流量期預報
  8. With baidi city, fengjie in the sichuan province to the west end and nanjin pass of yichang in the hubei province at the east, the three gorges, qutang, wu and xiling, total 192 km in length. the qutang gorge, known for its magnificence, is only 8 km long. wu gorge, 44 km long, is famed for its deep valley and quiet beauty

    長江三峽西起四川奉節的白帝城,東到湖北宜昌的南津關,全192公里,它由瞿塘和西陵段組成,瞿塘8公里,以雄偉險陵著稱,巫44公里,以幽深秀麗馳名,巫山十二峰中以神女峰最為俏麗,西陵66公里,灘多水急,是著名的險灘。
  9. Stability analysis of shiliushubao landslide in three gorges

    長江三峽石榴樹包滑坡穩定分析
  10. Wushan county lies in the most east of chongqing municipality, in the middle of three - gorge reservoir area, and the regional zone of high gorge calm lake, which possess the advantage of locating at the point of the east and the west of the three - gorge reservoir area

    重慶市巫山縣地處長江三峽腹心、高平湖地帶,在庫區具有承東啟西的地理位置優勢,是西部開發和生態建設的重點縣。
  11. The main functions of vessels and folk culture in three gorges area

    長江三峽地區舟楫的主要功用和民俗文化
  12. The three gorges on the yangtze river, consisting of the qutang gorge, the wu gorge and the xiling gorge, starts at baidicheng of fengjie in chongqing and ends at nanjinguan of yichang in hubei province, extending for 193 kilometres

    長江三峽西起重慶奉節的白帝城,東至湖北宜昌的南津關,全193公里,它由瞿塘、巫和西陵谷所組成。
  13. Zhyuan pool gorge, wu gorge, abbreviation of the xiling gorge, lie in location, travel around china of the changjiang river, via two provinces and cities in chongqing, hubei, it has characteristic such as being grand, beautiful, critical

    長江三峽是衢塘西陵的簡稱,位於中游地段,途經重慶湖北兩省市,其具有雄偉秀麗兇險等特點。
  14. In the construction period, the shiplocks are managed through the method of being entrusted to three gorges navigation administration of communication ministry by the proprietor of water conservancy project ( i. e. three gorges development company ), by which the project ' s construction smoothness and gezhouba dam ' s and three gorges dam ' s navigation

    水利樞紐施工期船閘管理採取的是由業主(開發總公司)委託交通部所屬長江三峽通航管理局管理的方式,該方式保障了工程施工順利和葛洲壩、航運暢通,但畢竟是工程施工期的過渡辦法,工程完工後必須建立武漢理工大學工程碩士學位論文新的船閘管理體制。
  15. The ship went up the yangtze gorges under her own steam

    這艘輪船靠自己的動力逆水駛過了長江三峽
  16. Review and prospect for the resettlement of tgp

    長江三峽工程移民回顧與展望
  17. China yangtse river three gorges project development corporation

    中國長江三峽工程開發總公司
  18. On ecological tourism development in three gorges reservoir area

    長江三峽庫區生態旅遊開發
  19. Research on reservoir - induced earthquake monitoring in three gorges area

    長江三峽工程誘發地震監測研究
  20. Shafanqi and the plan for the engineering of three gorges of changjiang river

    薩凡奇與長江三峽工程規劃
分享友人