長江大橋 的英文怎麼說

中文拼音 [zhǎngjiāngqiáo]
長江大橋 英文
chang jiang bridge
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : 名詞1. (大河) (large) river 2. (指長江) the changjiang [yangtze] river 3. (姓氏) a surname
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • 長江 : the changjiang river; the yangtse river長江鱘 acipenser dabryanus
  1. Faq buildings the yangtze river bridge of wuhan :

    : :問答集建築武漢長江大橋:
  2. Analysis of river bed evolution of yangtze river at yangluo bridge in wuhan

    武漢陽邏長江大橋位河段河床演變分析
  3. Spatial analysis on continuous plate - truss compositesteel truss bridge across the wuhu changjiang river

    蕪湖長江大橋連續板桁結合梁的空間結構分析
  4. Taking the caiyuanba changjiang river bridge in chongqing as an example, this paper makes a study of the effect of tilting angle of basket handle arch rib on the stability of the overall arch bridge and gives the rational tilting angle of the arch rib, using the finite element method

    摘要以重慶菜園壩長江大橋為例,利用有限元方法研究提籃拱的拱肋側傾角對全穩定性的影響,給出拱肋的合理側傾角。
  5. Wuhan yangtze river bridge is the first bridge built over the river

    長江大橋上修建的第一座
  6. As an example, the space analysis model about the wuhu changjiang river bridge is done and the internal forces about the wuhu changjiang river bridge due to dead load and lived load are analyzed. 2. the vibration analysis of the long span plate - truss composite cable - stayed bridges

    文中以蕪湖長江大橋為例,建立了該的空間有限元分析模型,並重點分析了該在自重恆載作用下的結構內力及車輛荷載對梁結構內力的影響。
  7. Brownjohn j m, pin - qi xia. dynamic assessment of curved cable - stayed bridge by model updating. asce, journal of structural engineering, vol. 126 no. 2 february, 2000

    朱玉,王宜均,楊耀銓等.鄂黃長江大橋塔索錨固區預應力布束方式分析. 2000年全國梁學術會議文集
  8. The paper describes structural features, assembling and welding procedure of the anchor box of wuhu - changjiang great bridge

    介紹了蕪湖長江大橋錨箱的結構特點及組焊工藝,提出了控制焊接變形的幾項有效措施,以及採用該工藝收到的良好效果。
  9. The type of double cage hoist is scq150 150, scq100 100, and the single hoist is scq150, scq100. its high efficiency, high quality and advanced design has been fully used during the erection of the famous high bridges and building

    雙吊籠型號為scq150 150 , scq100 100 ,單籠型號為scq150 , scq100 .該系列升降機在上海浦東徐浦長江大橋和廣東虎門等著名的施工中,充分顯示了高效優質的先進性。
  10. The 203rd committee of politics passed " the decision of constructing the yangtze river bridge of wuhan ", and approved the initial design and budget

    支持政務院第203次政務會議,正式通過關于修建武漢長江大橋的決定,批準了初步設計和工程概算。
  11. Corrosion protection of steel truss girders of caiyuanba changjiang river bridge in chongqing

    重慶菜園壩長江大橋鋼桁梁防腐
  12. This paper presents the corrosion protection system and part of the coating workmanship for steel truss girders of the caiyuanba changjiang river bridge in chongqing

    摘要介紹重慶菜園壩長江大橋鋼桁梁的防腐體系及部分塗裝工藝。
  13. The design of the superstructure of wuhu changjiang river bridge

    蕪湖長江大橋上部結構設計
  14. The box girders of the main bridge of wuhan tianxingzhou changjiang river rail - cum - road bridge were constructed by the girder casting method by three types of slide shuttering forms

    摘要武漢天興洲公鐵兩用長江大橋箱梁使用了3種移動模架制梁法施工。
  15. The upper level is for cars and has a width of 22. 5 meters ; the lower level is railroad and has a width of 18 meter. the length of the bridge is 1670 meter 1 mile

    長江大橋上層是公路,寬為22 . 5米下層為雙線鐵路,寬18米全1670米,正156米,有兩臺8墩9米,每孔跨度128米。
  16. First is the clear, distinct main theme with national characteristics. the 1 jiao, which has two main designs, carries the image of " combination of education and productive labour ", symbolizing education renovation. the 2 jiao which carries " the bridge over yangtze river in wuhan " symbolize the achievement of socialism. the 5 jiao has " women working in textile factory ", symbolizing development in light industry

    兩種原版的1角券正面均為"教育與生產勞動相結合"圖,只是一個是側視圖,一個是正視圖,象徵文化教育新改革; 2角券正面為武漢長江大橋圖,象徵社會主義建設新成就; 5角券正面為紡織車間圖,象徵發展輕工業。
  17. The 1 jiao, which has two main designs, carries the image of " combination of education and productive labour ", symbolizing education renovation. the 2 jiao which carries " the bridge over yangtze river in wuhan " symbolize the achievement of socialism. the 5 jiao has " women working in textile factory ", symbolizing development in light industry

    兩種原版的1角券正面均為"教育與生產勞動相結合"圖,只是一個是側視圖,一個是正視圖,象徵文化教育新改革2角券正面為武漢長江大橋圖,象徵社會主義建設新成就5角券正面為紡織車間圖,象徵發展輕工業。
  18. How to layout the south - north approach of lijiaotuo changjiang river bridge chongqing

    重慶李家沱長江大橋南北引道路面病害的整治措施
  19. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重項目「高摻量粉煤灰混凝土的期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、長江大橋體積粉煤灰混凝土技術、南京泵送混凝土技術等提供咨詢建議。
  20. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九長江大橋基礎獨創性地採用雙壁鋼沉井圍堰鉆孔樁基礎,鋼圍堰在梁基礎施工中的應用越來越多。
分享友人