  1. Through improvement of construction technology of chamfer of zaohe river third - line lock ' s chamber wall, the inclined surface concrete quality has been well controlled

    通過對皂河三線船閘室墻倒角施工工藝的改進,斜面砼表面質量得到了較好的控制。
  2. After excavation, there are concentration phenomenon of stress at the corner or the shiplock room, and the tension zone lies in half of the middle part as well as the part of the two slopes to the lower part of the upright wall. finally the analysis results are compared with site monitoring data in period of construction as well as the feedback reports, the result of all comes to meet with each other very well

    開挖完成後,在拐角處存在不同程度的應力集中現象,中隔墩上部1 2的巖體及南北邊坡至直立頂部平臺以下的部分巖體為拉應力區。在兩側邊坡及邊的塑性區出現在損傷區和部分卸荷影響區內,中隔墩大部分區域的巖體都進入了塑性狀態,底板處的塑性區基本上與損傷區一致。
  3. And the conclusion can be obtained thatrafter excavation, the horizontal deformation increased continuedly with the depth of excavation. while the whole deformation takes on a tendency of nearly horizon and slightly downward. the middle part of the shiplocks maintains the state of unloading feedback during the excavation, when the excavation is finished, it expands toward two sides

    本文研究發現開挖完成後直立和南北邊坡的巖體水平方向變形隨著開挖深度的下降而不斷增大,開挖完成後的總體變形表現為近水平略向下。中隔墩在開挖過程中,始終處于卸荷回彈,開挖完成後,中隔墩向兩側張開。
  4. The surrounding rock mass of the tgp shiplocks is jointed rock mass cut by well - developed discontinuous joints. the middle frusta and vertical border wall are the important components of the lock room construction. its deformability and stability will directly affect the construction function and using security

    永久船區巖體屬於一種斷續節理切割的裂隙巖體,中隔墩和直立邊結構的重要組成部分,其變形大小和穩定程度將直接影響三峽航道的結構功能和運行安全。
  5. Shankou spillway project has many specific characteristics, for example, the gate frusta and weir body have equivalent thickness, the weir body is low and have corridor, the foundation of the weir body is " high - low foot " " and the side frusta is also used as retain wall. in view of the characteristics, to better analyze the stress distribution on weir body, gate frusta, the joints between gate chamber and weir body, under the condition that the gate chamber is applied with asymmetrical loads and complicated constraints, three dimensional finite element method is applied in this paper

    本文針對山口溢洪道墩與堰體底板厚度相當,堰體為低堰且設有廊道、堰體建基面「高低腳」及邊墩兼作擋土等具體特點,在設計中采山口水利樞紐工程溢洪道三維有限元整體應力計算分析用三維有限元整體應力計算方法分析的受力狀態,分析在荷載不對稱。
  6. At last the corresponding formulae was yielded. 4. the design scheme of jiangtang lake flood - intake sluice was systematically researched, including selecting the sluice location, calculating the height of the sluice soleplate, selecting of the sluice structure and bank wall, and then the reliable proof for determining rational structure scheme was provided

    4從址選擇、底板高程確定、結構和岸等方面,對姜唐湖進洪工程的設計方案進行了系統的研究,為最終確定較為合理的結構方案提供了可靠依據。