閘段 的英文怎麼說

中文拼音 [zháduàn]
閘段 英文
lock chamber
  • : anchor gate
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  1. The analysis show that the project target of detaining the coarse and discharging the fine can be got with the related measures, such as placement of the warping sluice on the concave bank of a bending reach ; arrangement of the overflow weir on a bending reach and reasonable zoning and scientific control of the desilting channels etc

    分析表明,採用將放淤布設在彎道上的凹岸、彎道設置溢流堰、淤沙條渠的合理分區和科學調度等措施,可以實現試驗工程淤粗排細的目標。
  2. Analysis on flow and sediment movement in approach channels of tidal river branches

    感潮河下引航道水沙運動及泥沙淤積
  3. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時的變化、多口門、多庫容、多水)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  4. Seawall and sluice are the parts constructed in advance, while final closure is the last part in construction. the hydraulic condition during the final closure process is worse than that during any other processes. and with the compressing of the entrance, the hydraulic condition becomes badly, the drop height of entrance can reach 2 to 3 meter, the maximum velocity of flow even reaches 6 to 8 meter per second and flow condition also becomes complex

    海堤和水的修建都是圍海工程先期施工的部分,堵口則是海堤修築的最後階,堵口合龍成敗關繫到圍海工程成敗,由於此階所遇到的水力條件十分惡劣,口門落差可達2 3m ,流速最大可達到6 8m / s ,且水流極其復雜,根據我國《圍海工程技術規范》規定圍海堵口必須進行龍口水力計算。
  5. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河上,電站為低引水式開發。正常蓄水位1268 . 0m ,最大高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  6. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩溫控並縫措施研究:為廠房壩並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  7. Derivation of draining sluice scale in tidal reach of cixi county

    慈溪感潮地排澇規模的推算
  8. Chen xuan also established most of engineering bases of gates and locks and repairing engineering projects along the grand canal

    運河其他各河壩,修防等工程的基礎,也大都由陳?奠定。
  9. In the turbulent flow, the fluid ’ s physical parameters has the stochastic change along with the time and the space, it is very difficult to carries on its rate process ’ s precise computation and the simulation with mathematics method, but unstable condition navier - stokes equation regarding open canal current of water transient motion suitable

    后水流經過加糙的海漫時,其水流狀態屬明渠紊流。流體中的各種物理參數,都隨時間與空間發生隨機的變化,很難用數學的方法對其運動過程進行精確計算和模擬。
  10. After that, the author discusses a novel solid states limiting technology and provides a single - phase solid states bridge current limiter and a main circuit topology of three - phase fault current limiter. it can be found that the new type of three - phase solid states bridge current limiter can handle the fault conditions more flexibly. it can not only remove the fault circuit, but also control the value of stable fault current to cooperate with the existing line three - segment relay

    繼而,介紹了一種新型固態限流技術,給出了單相、三相限流器的主電路拓撲,分析了其基本工作原理和控制方式,指出以全控橋結構為基礎的變壓器耦合橋式限流器能夠更加靈活地處理電力系統的各種短路故障,及時地限制短路電流,並與現有的線路三保護相配合,還可根據需要實現及時切除故障電路,在故障恢復時軟重合
  11. The reason to creates this kind of destruction to be very many, the main of them is that the apron partially has not been able fully to display it to eliminate energy affect so causes the ditch bed to wash out, forms flushes the pit, leading to the apron, to guard against flushes the trough and both banks slope protection destruction, for a long time, disappear power design of plunge basin and layout have been focused on disappear power. but not to give the enough value on uses the sea to inundate the section to disappear power and adjust speed to reduced downriver washes out

    下沖刷破壞的部位絕大多數發生在消力池下的海漫和防沖槽處,造成這種破壞的原因很多,其中很大一部分是由於海漫部分未能充分發揮其消能作用而引起渠床沖刷,形成沖坑,導致海漫、防沖槽及兩岸護坡的破壞。一直以來,人們把消能的研究重點放在消力池的消能設計及平面布置上,而對海漫消能及調整流速功能研究甚少,至於對海漫加糙水流運動建立數學模型,在國內外還很少見相關的論文資料。
  12. By using the p + pr algorithm and the technique of synchronous gate operation, a mathematical model of multireach canal systems in the mode of constant water - volume control was developed ; and it was programmed to simulate the control process

    摘要應用門同步操作技術和p + pr演算法,建立了多渠串聯渠系並有渠側出流的等體積控制模型,並編程對控制過程進行實時模擬。
  13. At 958 metres, tai mo shan is a formidable challenge for mountaineers. for well - equipped hikers, the maclehose trail, extending from tai lam chung in the west, to tai po in the east, is an adventurous trail. visitors may drive about half - way up, to a barrier gate which commands spectacular views over tsuen wan and most of kowloon in one direction and over the lam tsuen valley and beyond to the hills of guangdong province in the other

    大帽山也寫作大霧山,高達958米,對爬山者是項極大的挑戰。愛冒險而又裝備齊全的人士,可考慮遨遊大帽山的麥理浩徑(東連大埔、西往大欖涌) 。遊人亦可駕車至半山的門,由此俯瞰荃灣和九龍大部分地區,或遠眺林村山谷及廣東群山,欣賞壯麗景色。
  14. In order to avoid the ehv system disaster caused by reclosing on the permanent fault of transmission line, adaptive autoreclosure based on microprocessor - based protection arises at the historic moment, but is still in the stage of theory study

    為了避免超高壓輸電線路採用自動重合時重合於永久性故障所造成系統穩定破壞等重大系統災難,在微機保護的基礎上,自適應重合應運而生,但尚處于理論探索階
  15. The work is at an early stage, roughly analogous to the construction of the first semiconductor logic gate some 40 years ago

    這項研究還處于早期階,大概類似40幾年前造出第一個半導體邏輯時的狀況。
  16. The concept of minimum distribution part ( mdp ) is put forward together with the adjacent table based method to divide a distribution network into several mdps. based on above theory ; a novel way to identify fault sections of a distribution network is presented. algorithm to isolate the fault section with minimum switch operations and identifying of over - tripped switches are discussed

    提出最小配電區域的概念,並基於等長鄰接表的數據結構建立了最小配電區域分解的方法,在此基礎上發展了一種新穎的配電網故障區域判斷和隔離方法,研究了以最少的開關操作隔離故障區域的方法和越級跳開關的判斷問題,探討了針對採用重合分器的配電網故障區域判斷和隔離問題。
  17. The silting mechanism downstream of sluices and limits of the 2 - d suspended sediment model to simulate the silting downstream of sluices in a tidal reach are analyzed

    摘要分析了感潮河下淤積機理及用平面二維懸沙數學模型模擬下淤積存在的缺陷。
  18. Hydralics monitored findings in the water - pumping debugging period for tgp lock are presented and compared with model test data

    摘要介紹了三峽永久船抽水調試階水力學監測的部分成果,並與模型值進行了比較。
  19. He has published such thesis as application of monte carlo method for calculating lock base filtration , numerical simulation of three - dimensional turbulent flow in forebay of pumping station , the classification of braided reach by fuzzy clustering, etc

    發表了《用蒙特卡羅方法求解船地基滲流》 、 《泵站前池流態的數值模擬》 、 《天然河流分汊河河型模糊聚類分析》等研究型論文。
  20. A new method is presented : the average silting thickness in the reach approaching the sluice is predicted by an analytical model, and the silting distribution in the other reach is predicted by a 2 - d suspended sediment model

    提出採用分析模式預測近閘段的泥沙平均淤厚,其餘河由平面二維懸沙數學模型預測淤積分佈相結合的方法。
分享友人