防洪壩 的英文怎麼說

中文拼音 [fánghóng]
防洪壩 英文
checking dam
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 防洪 : flood protection; flood control; prevent or control flood
  1. The pressure on dams and levees is very strong

    堤的壓力巨大。
  2. Article 37 no unit and individual may damage, occupy or destroy flood control works such as dams, embankments, sluices, bank revetments, pumping stations and drainage systems, hydrological and communications facilities and standby apparatuses and materials for flood control

    第三十七條任何單位和個人不得破壞、侵佔、毀損水庫大、堤、水閘、護岸、抽水站、排水渠系等工程和水文、通信設施以及汛備用的器材、物料等。
  3. Literally thousands of concrete dams are providing water supply shortage, irrigation, flood control, and power generation.

    可以毫不誇張地說,有成千上萬座混凝土水正在供灌溉,給水、、發電之用。
  4. Comparison of emulation computation results on thermal stress with prototype monitoring data in heightening test of danjiangkou dam

    丹江口大加高在漢江規劃中的作用
  5. Zipingpu hydraulic key project is located at shajinba reach, upriver of minjiang river, being built for agricultural irrigation and civil water supply. it also has integrative benefits such as preventing flood, generating electricity, environmental protection and tourism

    紫坪鋪水利樞紐工程位於四川省成都市西北60km的岷江上游沙金河段,是一座以農業灌溉、城市供水為主,兼有、發電、環境保護、旅遊等綜合效益的水利工程。
  6. In order to control the flood and to mitigate wangering of the section, since the beginning of building water control works on the yellow river, some 3700 dams, battlements and revetments have beed set up. these works have played an impotant role in flood control

    人民治黃以來,為了有效地控制水,減少主流游蕩范圍,在該河段已修建了3700多道由、垛、護岸組成的河道整治工程,對保障安全起到了重要作用。
  7. Officials announced on aug. 1 that the crest passed through the dam without incident, crediting the structure for taming it for the river ' s lower reaches

    8月1日政府宣布峰安全通過三峽大,並將長江中、下游地區的安瀾歸功于大功能。
  8. Article 19 : building of dam, sluice gate, bridge, wharf and other structures blocking, crossing or bordering a river channel ; laying pipelines or cables across a river, must comply with state - specified standards for flood control and navigation as well as other related technical requirements

    第十九條修建閘、橋梁、碼頭和其他攔河、跨河、臨河建築物,鋪設跨河管道、電纜,必須符合國家規定的標準、通航標準和其他有關的技術要求。
  9. But two of the levees failed the next day. most of the city was flooded

    但第2天兩個防洪壩已經決堤了。大部分的城市被水所吞沒。
  10. The pressure on dams and levies is very strong

    堤眼承受巨大的巨大。
  11. The three gorges hydropower and water conoervancy project is the largest hydropower station in the world after completion of gezhouba hydropower station on the changjiangriver

    摘要三峽水利樞紐是繼葛洲水利樞紐建成后在長江上修建的世界第一大水電站,規模宏大,舉世矚目,具有巨大的、發電、航運等綜合效益,是開發治理長江的骨幹工程。
  12. Application of vibration percussion in treatment of the foundation of flood control emergency project in liao river

    振沖法在遼干應急工程基處理中的應用
  13. On one hand, technological difficulty exists in determining the number and flood routing for dam system. on the other hand, for dam system security and stability, single dam ’ s designing should take flood control standard of dams, hinge composing, building sequence as well as years of filling up into account

    一方面系整體調、數量的確定技術難度大,另一方面,小流域系中單的設計必須綜合考慮上下游標準、樞紐組成、建設順序、淤積年限等情況,才能保證系的安全和穩定。
  14. Jahezi reservoir is located at the northwest arid area of china, the primary tasks of which are flood control land irrigation. it has been reinforced in 2003 so the discharge capacity and the safety of dam were increasing at large degree, which created the conditions to utilize the flood sufficiently by raising the limited water level

    夾河子水庫地處我國西北乾旱區,主要承擔及灌溉任務, 2003年除險加固完成後,水庫的泄流能力及大安全都有很大程度的提高,為水庫抬高汛限水位,實現水資源化創造了條件。
  15. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底水庫運用后水沙變化這一主要矛盾,通過分析研究以往典型時期的水沙特點和河道演變特點,收集分析河床邊界條件變化資料,小浪底水庫運用后水沙資料變化,結合現有河道整治工程建設情況,總結前人的研究成果,重點研究三門峽水庫運用後下遊河道河勢變化的規律和特點,探索小浪底水庫運用後下遊河勢變化情況,分析預測游蕩性河道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東頭、東頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的形勢,指導河道整治工程建設的規劃和工程安排提供決策參考和依據。
  16. The first is the influence on flood controlling, the second is the influence on hydro power, the third is the influence on water resources, navigation, and ecological environment downstream of dan jiang kou

    丹江口水庫不加高大調水對丹江口樞紐及其下游地區主要有三個方面影響: 1對調度的影響; 2對發電的影響; 3
  17. To improve the river reconstruction technique, it is necessary to investigate mechanism and effect of flow control and aggradation for permeable pile dike

    為了探索透水樁在黃河治理中的應用前景和應用技術,進一步研究和探討該工程的透水落淤機理和導流效果,為治河提供理論依據。
  18. After the hydraulic project of the three gorges of the yangtze river is completed, the water level in front of the dam of the three gorges reservoir area will be raised from the now several tens of meters to 175 meters. furthermore, because of the needs of preventing floods, the water level of reservoir area will be adjusted periodically between 175 meters and 145 meters every year. this will inevitably cause the revival of part ancient landslides and the formation of new landslides, which will definitely influence the urban construction, the traffic transportation, the people ' s life and property security, etc. in the three gorges reservoir area

    長江三峽水利樞紐工程建成蓄水后,庫區前水位將由現在的幾十米海拔高程提高到175m ,且由於的需要,庫水水位每年還將在175m與145m之間進行周期性調節,這無疑將導致部分古滑體的復活和新滑體的產生,結果勢必會對未來三峽庫區范圍的城鎮建設、交通運輸、人民生命財產安全等造成一定的影響。
  19. Water discharged from the dam was threatening the safety of anti - flood embankments downstream, according to a deputy governor of hubei province ( of which miaohe is part )

    湖北省(廟河村所屬省份)一名副省長指出,大排水正威脅下游堤的安全。
  20. Though the flood control engineering system improved the flood control standard and reduce the frequency of flood inundation and enlarger the protected area, but at the same time, the risk of dike broken and dam failed were added. moreover, people found that human living environment become worsen increasingly and the river ecosystem was destroyed

    然而,在與水斗爭的過程中,人們發現雖然通過大規模的水利工程建設,提高了江河的標準,減少了水泛濫的幾率,擴大了保護的范圍,但同時也增加堤、大潰決等的風險,而且人類發現生存環境日益惡化,河流生態系統被破壞等諸多問題。
分享友人