防石圍墻 的英文怎麼說

中文拼音 [fángdànwéi]
防石圍墻 英文
rock fall fence
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • : 名詞(磚、石等築成的屏障或外圍) wall
  • 石圍墻 : stone fence
  1. Discusses the optimizing process of treatments of the main technical problems, which include the construction schedule, the field plan and t he balance of earth and rock works, method of the river closure and cofferdams sections, procedure and time of the river colsure, form of the cutoff, construct ion of the cut - off walls

    論述了三峽大江截流及二期堰實施過程中的施工進度計劃、料場規劃與土方平衡、截流方式與堰斷面形式、截流進占程序和時段、滲形式、施工等主要技術問題的優化完善過程
  2. I have already observ d how i brought all my goods into this pale, and into the cave which i had made behind me : but i must observe too, that at first this was a confus d heap of goods, which as they lay in no order, so they took up all my place, i had no room to turn my self ; so i set my self to enlarge my cave and works farther into the earth, for it was a loose sandy rock, which yielded easily to the labour i bestow d on it ; and so when i found i was pretty safe as to beasts of prey, i work d side - ways to the right hand into the rock, and then turning to the right again, work d quite out and made me a door to come out, on the out - side of my ale or fortification

    現在我必須補充說一下,就是那些東西起初都雜亂無章地堆在那裡,以致占滿了住所,弄得我連轉身的餘地都沒有。於是我開始擴大和挖深山洞。好在巖質地是一種很松的沙,很容易挖,當我覺得已加固得足以禦猛獸的襲擊時,我便向巖壁右邊挖去,然後再轉向右面,直至把巖壁挖穿,通到外面,做成了一個可供出入的門。
  3. By drilling to weak position, the jet - grouting technique breaks through and mixes with soil and stone of dam foundation to form diaphragm - wall

    高壓噴射灌漿可由鉆機鉆孔至需處理的薄弱部位,通過高壓射流的沖擊攪拌,水泥漿在噴射范內與地層土顆粒摻混攪合后形成
  4. This paper analyzes and explores stress strain model and principle of the project of concrete diaphragm wall after concluding other engineers and project practices and describing the seepage and deformation character of the plastic concrete used in the cofferdam of the second stage of the three gorges project. we analyze and forecast the change trend by using mathematics statistics regression, then we get the best regression equation. finished it, we used this way to the cofferdam of the second stage of the three gorges project. it proves that the method which i have introduce in this article is effective for the stability of concrete diaphragm wall and it is also a valid for supervising cofferdam security after using it in many projects

    本文在總結前人和其他工程實踐的基礎上,結合三峽二期土堰實例綜合分析塑性混凝土的滲透和變形特性,對三峽二期堰砼的應力應變模型、原理進行了分析、探討,在監測分析資料的基礎上進行數學統計回歸分析,並對變形進行預測,通過對砼及堰體的應力應變監測數據進行數學統計回歸分析,得出了最佳回歸方程,並對三峽二期堰變形進行預測,達到了對堰安全性監測評價的最佳效果。
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土堰基礎處理與施工技術;大江截流上下游土堰平拋墊底研究;二期滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌的結構與支護研究;特大型水輪發電機組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土堰基礎處理與施工技術;大江截流上下游土堰平拋墊底研究;二期滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌的結構與支護研究;特大型水輪發電機組的科學研究。
  7. As a new type of impervious wall material, the geomembrane is to be used in the central core earth and rockfill dams. in this thesis, the engineering characteristics of geomembrane are mainly investigated. the reliability of impermeability, the durability, the deformation adaptability and the proper application range of geomembrane are discussed

    本文重點研究了土工膜作為一種新型滲材料應用於土滲心的工程特性,探討其在土壩擋水運行期間滲的可靠性、耐久性、變形能力及其適用范
  8. Constructed with solid blue bricks on granite foundations, the walls stand 10 feet high and served to protect the wong clan from bandits during the early years of their settlement there

    客家屋以花崗基,上以堅硬的青磚砌成護,高達十尺,用於禦盜賊。
分享友人