防石圍墻 的英文怎麼說
中文拼音 [fángdànwéi]
防石圍墻
英文
rock fall fence-
Discusses the optimizing process of treatments of the main technical problems, which include the construction schedule, the field plan and t he balance of earth and rock works, method of the river closure and cofferdams sections, procedure and time of the river colsure, form of the cutoff, construct ion of the cut - off walls
論述了三峽大江截流及二期圍堰實施過程中的施工進度計劃、料場規劃與土石方平衡、截流方式與圍堰斷面形式、截流進占程序和時段、防滲形式、防滲墻施工等主要技術問題的優化完善過程I have already observ d how i brought all my goods into this pale, and into the cave which i had made behind me : but i must observe too, that at first this was a confus d heap of goods, which as they lay in no order, so they took up all my place, i had no room to turn my self ; so i set my self to enlarge my cave and works farther into the earth, for it was a loose sandy rock, which yielded easily to the labour i bestow d on it ; and so when i found i was pretty safe as to beasts of prey, i work d side - ways to the right hand into the rock, and then turning to the right again, work d quite out and made me a door to come out, on the out - side of my ale or fortification
現在我必須補充說一下,就是那些東西起初都雜亂無章地堆在那裡,以致占滿了住所,弄得我連轉身的餘地都沒有。於是我開始擴大和挖深山洞。好在巖石質地是一種很松的沙石,很容易挖,當我覺得圍墻已加固得足以防禦猛獸的襲擊時,我便向巖壁右邊挖去,然後再轉向右面,直至把巖壁挖穿,通到圍墻外面,做成了一個可供出入的門。By drilling to weak position, the jet - grouting technique breaks through and mixes with soil and stone of dam foundation to form diaphragm - wall
高壓噴射灌漿可由鉆機鉆孔至需處理的薄弱部位,通過高壓射流的沖擊攪拌,水泥漿在噴射范圍內與地層土石顆粒摻混攪合后形成防滲墻。This paper analyzes and explores stress strain model and principle of the project of concrete diaphragm wall after concluding other engineers and project practices and describing the seepage and deformation character of the plastic concrete used in the cofferdam of the second stage of the three gorges project. we analyze and forecast the change trend by using mathematics statistics regression, then we get the best regression equation. finished it, we used this way to the cofferdam of the second stage of the three gorges project. it proves that the method which i have introduce in this article is effective for the stability of concrete diaphragm wall and it is also a valid for supervising cofferdam security after using it in many projects
本文在總結前人和其他工程實踐的基礎上,結合三峽二期土石圍堰實例綜合分析塑性混凝土防滲墻的滲透和變形特性,對三峽二期圍堰砼防滲墻的應力應變模型、原理進行了分析、探討,在監測分析資料的基礎上進行數學統計回歸分析,並對變形進行預測,通過對砼防滲墻及堰體的應力應變監測數據進行數學統計回歸分析,得出了最佳回歸方程,並對三峽二期圍堰變形進行預測,達到了對圍堰安全性監測評價的最佳效果。Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。As a new type of impervious wall material, the geomembrane is to be used in the central core earth and rockfill dams. in this thesis, the engineering characteristics of geomembrane are mainly investigated. the reliability of impermeability, the durability, the deformation adaptability and the proper application range of geomembrane are discussed
本文重點研究了土工膜作為一種新型防滲材料應用於土石壩防滲心墻的工程特性,探討其在土石壩擋水運行期間防滲的可靠性、耐久性、變形能力及其適用范圍。Constructed with solid blue bricks on granite foundations, the walls stand 10 feet high and served to protect the wong clan from bandits during the early years of their settlement there
客家圍屋以花崗石為墻基,上以堅硬的青磚砌成護墻,高達十尺,用於防禦盜賊。分享友人