防護索 的英文怎麼說

中文拼音 [fángsuǒ]
防護索 英文
guard cable
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • 防護 : protect; shelter; shield; guard; shielding; protection; proofing
  1. The method of close water test has been used for a long time, so richer experience has been achieved. however, it not only takes pains and time, but also consumes raw materials during the close water test because of miscellaneous working procedures such as bricklaying in the two ends of pipe, water - repellent layer plastering, maintaining and water offletting, brick - block backouting after the test, especially in the region short of water and some drainage pipe with prop - pipe construction. in order to satisfy the fast development of municipal construction, new detection methods should be developed

    閉水試驗方法因其應用時間較長,目前已積累了較豐富的經驗,但在閉水試驗時,管道兩端砌築磚堵、抹水層、養、灌水浸泡,以及試驗后的放水、磚堵拆除等繁雜工序,不僅費工、費時,而且消耗原材料,尤其是在缺水的地區以及頂管施工的無壓管道,這些矛盾更加突出;因此,為滿足迅速發展的市政建設需要,有必要探新的檢測方法,閉氣試驗就是其中一種,但是閉氣試驗目前還不完善,有待于進一步深入研究。
  2. The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1

    林家崖號滑坡的綜合治理方案是由削方、錨抗滑樁、坡擋墻、地表排水、整坡填縫、生物等多種工程措施優化組合而成。治理后,在飽水有地震荷載狀態下滑坡的安全儲備系數為1 . 10 。
  3. Personal protective equipment against falls from a height - lanyards

    高處墜落用個人設備.牽
  4. Udaloy reflects design changes that addressed the shortcomings of the previous krivak program ; namely the lack of helicopter facilities, limited sonar capabilities, and light air - defenses

    勇敢級一改以往克里瓦克級反潛衛艦的缺點。克里瓦克級不能搭載直升機,搜能力較低,空能力也很差。
  5. At the same time, we researched the method of the dynamic photoelasticity experiment. we designed a protection device and a trigger to pack the medicine structure synchronously

    同時對動光彈爆破的實驗方法作了探,設計出裝置和同步觸發裝藥結構。
  6. Personal protective equipment against falls from a height ; descender devices ; german version en 341 : 1992

    人員墜落保裝置.繩下滑器
  7. The structure of prestressed anchor - rope and groundsill is one of the most effective sheathing works, it is used wildly in some slop protection works. the structure is made up of prestressed anchor - rope and groundsill. the combined structure can utilize the latent energy of rock or soil mass

    預應力錨地梁結構是一種極其有效且正推廣應用於各工程部門的支擋體系。該結構由預應力錨和地梁共同組成。
  8. Personal protective equipment for work positioning and prevention of falls from a height - belts for work positioning and restraint and work positioning lanyards

    工作定位和止從高處墜落的個人設備.工作定位和限動用固定帶及工作定位用牽
  9. In order to avoid of chaos by abusing the corporate personality, and to protect the benefits of corporation creditors and small shareholders, and in honor of the public interests, and to ensure the business carry through smoothly, on the condition that the corporation is not being cancelled, and for the sake of revealing the law actuality under the corporation, the court will throw aside the independence of corporate personality, require the shareholder behind the curtain of the corporation bear the direct burden to the creditors, this doctrine called as " disregard of the corporative personality "

    為了止公司法人人格的濫用造成混亂,保債權人和小股東以及社會公共利益,確保交易的順利進行,在不撤銷公司的情況下,法院為了弄清公司在法律後面的現實,把公司的獨立人格丟在一邊,要求背後的股東對債權人負直接責任,這就是公司法人人格之否認。這種理論在英美法中稱「揭開公司面紗」 ,在大陸法中稱「直」責任,三詞在本文中為同義語。
  10. End user improvements include a streamlined interface, tabbed browsing, printing advances, improved search functionality, instant feeds, dynamic security protection, and more

    使用者改良包含簡化的介面引標簽式瀏覽進階列印改良的搜尋功能立即摘要rss動態安全以及其他功能。
  11. Personal protective equipment for the prevention of falls from a height - low stretch kernmantel ropes ; german version en 1891 : 1998

    個人從高處墜落的保設備.低延伸性芯套繩
  12. The thesis designed the structure of a firewall in global, and then it go deep into the problem of searching and maintaining the filter rules and the state inspection table. it employed the data structure and algorithms of geometry and graph theory in the design of firewall

    本文在帶狀態監測的火墻結構基礎上,首先從總體上設計了整個火墻的結構,進而研究了過濾規則庫和狀態監測表的搜、維問題,提出了將計算幾何學、圖論中的數據結構和演算法引入火墻的設計的方式,將基礎理論應用到實踐中來。
  13. Many security protection techniques, which have been gradually transited from static security protection techniques to dynamic one, have been studied and explored to assure network information system

    為了保網路信息系統的安全,人們研究和探了多種安全技術,從一開始的靜態安全逐漸過渡到了動態安全
  14. The cas provides full - time and part - time training to its members, covering counter - disaster skills, hill fire - fighting, anti - oil pollution, mountain search and rescue, flood rescue, radiological protection, cardio - pulmonary resuscitation and conventional rescue instruction. in 2000, the cas conducted 185 full - time courses and 159 part - time courses

    民安隊為隊員安排各種全日制和部分時間制訓練課程,訓練內容包括抗災、撲滅山火、清理油污、山野搜及搶救、水災拯救、核輻射、心肺復甦法和一般搶救技巧等。
  15. Avalanche protection equipments. artificial release. avalanche blasting ropeway

    雪崩設備.人工松脫裝置.雪崩清除用
  16. Personal protective equipment for the prevention of falls from ? height. low stretch kernmantel ropes

    止由高處跌落的個人設備.低拉力繩
  17. In the past 50 years, about 300 cable - stayed bridges have been built in the whole world. owing to the imperfect cable protection technology, cable corrosion is unavoidable after the bridge served a few years. in the world, a few cable - stayed bridges have to face the problem of being cables replaced

    過去50年內,全世界修建了300餘座斜拉橋,由於斜拉技術不盡完善,在運營若干年後,不可避免地會出現斜拉腐蝕問題,國內外一些斜拉橋不得不面臨換的問題。
  18. Use the extinguishing mixture near the eternal flame in the alonsus chapel to remove the light ' s protection. be prepared to fight anyone who may attempt to defend the chapel

    在阿隆斯小禮拜堂的永恆火焰旁邊使用熄滅合劑來瓦解聖光的。準備好與任何試圖保衛小禮拜堂的人戰斗。
  19. Origin analysis of earth slide in high slope construction protected by cable anchors of a mine and prevention of earth slide

    某礦山高邊坡錨施工中滑坡成因分析及其預措施
  20. Preliminary analysis and studies on the application of the river improvement techniques to the downstream serpentine channel of lihe river section in luanhe - tianjin water diversion project are made, and then the improvement plan for the downstream channel is explored through the development and application of both the technique of the concrete mats and the technique of geosynthetics mattress placed for the protection of the high and steep side slopes of the downstream channel of lihe river

    摘要針對引灤工程黎河下游多彎曲型河道採用的治理技術措施進行了初步的應用分析探討,並通過對黎河下游高陡邊坡中採用的模袋混凝土技術及軟體排技術進行的深入開發應用,探了黎河下遊河道的治理方案。
分享友人