防過載裝置 的英文怎麼說

中文拼音 [fángguòzǎizhuāngzhì]
防過載裝置 英文
antigravity device
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 裝置 : 1 (機器設備的配件)installation; device; apparatus; equipment; arrangement; gear; appliance; rig...
  1. Coupling proof overload test, fiber optic interconnecting devices

    光纖互連耦合試驗
  2. High / low pressure switch, anti - frost protector, solube chock, overload protector, coil overheat protector, automatic temperature sensitive switch, anti - phase protector

    高低壓開關,凍開關,可熔栓,保護,線圈熱保護器,溫度自動開關,逆相保護器。
  3. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準設、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非線性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通收集大量的實橋設計資料,經分析計算,歸納總結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突加荷的原理,推導分析了預應力鋼絞線式(鋼棒連接式)落梁設計承力的計算方法和設計伸長量s _ f的取值;最後本文通實橋計算,說明了落梁止系統設計的方法。
  4. Countermeasures are put forward , such as making reasonable selection and matching of the rod string , strengthening inspection , using special sucker rod , applying tubingless production technology , installing anti - reverse unit , mounting overload protection system , and so on

    針對上述原因,制定了合理選配桿柱,加強檢測,採用專用抽油桿,應用無油管採油技術,安反轉,設保護系統以及加強現場施工管理等技術對策,提高了抽油桿柱的可靠性,有效地避免了桿柱斷脫事故的發生。
  5. Unless there are other means to prevent lifting a motor vehicle exceeding the capacity of the platformequipment, an overload device should be installed to prevent any movement of the platform and to give an alarm when the load on the elevating platform is in excess of the rated capacity

    如沒有採取其他措施止平臺設備提升超逾其負重量的車輛,便須重安全,在平臺負荷超逾其額定重時停止操作,以及發出警報。
  6. Vehicle stability control ( vsc ) is an active safety device, which lets the vehicle run following the driver ' s intension to prevent vehicle from losing stability. now, vsc is the international research focus in the vehicle active safety field

    汽車穩定性控制是通控制系統實時調整車輛的運行狀態,使車輛能夠按照駕駛員的意圖行駛,並止車輛失穩的汽車主動安全,是當前國際上汽車主動安全領域的研究熱點。
  7. Either the collision between ship and bridge or ship and anti - collision equipment is a complicated non - linear dynamic response process under extreme large load in a very short time. because of the complicacy and the uncertain factors in collision process, it is nearly impossible to make theoretic analysis by building up an accurate mathematic model

    無論是船-橋相撞或是船-相撞都是一個十分復雜的碰撞動力學問題,是兩者在很短的時間內在巨大沖擊荷作用下的一種復雜的非線性動態響應程,且碰撞程中存在多種不確定性因素,因此企圖通建立一個精確的數學模型使問題得到完全解析是不可能的。
分享友人