陽基陷 的英文怎麼說

中文拼音 [yángxiàn]
陽基陷 英文
phallocrypt
  • : Ⅰ名詞1 (太陽; 日光) the sun 2 (山的南面; 水的北面) south of a hill or north of a river 3 (中...
  • : Ⅰ名詞1 (陷阱) pitfall; trap2 (缺點) defect; deficiency Ⅱ動詞1 (掉進) get stuck or bogged do...
  1. Due to the multi - period tectonic movement and evolution of mechanical mechanism, syndeposition structures occur extensively in jiyang sag, the base of the sag subsided alternatively during the fault depression, which resulted in sinking of top bending and complicated block structure accordingly, reconstructed the syndeposition intensively, and produced the special structural landscape in combination with all levels of faults and sedimentary formations within it

    摘要濟由於受到多期構造運動的影響,在前第三系古地形高點背景上廣泛發育同沉積背斜構造,然而由於坳在斷底滾動式沉降,造成撓曲頂部的塌,形成復雜的塊斷結構,使本區同沉積構造發生強烈改造,往往與各次級斷層或沉積地層相復合,表現出獨特的構造景觀。
  2. Based on analysis of geologic foundation record about pingzhuang basin, a lot of sino - foreign geothermal geology record and investigation of field geology, measuring of ground temperature in person and geo - chemical analysis of ascension spring, gushing water of fault, the fact that the anomaly of geothermal gradient of pingzhuang basin, which is in region of low geothermal gradient, is caused by redistribution of conduction - oriented geothermal heat flow which is result from upheaval and depression of basin foundation bed is pointed out. after the field of ground temperature is simulated under the background of conduction - oriented geothermal heat flow by means of ansys, the characteristic of ground temperature distribution of top surface of basin foundation bed ( yixian team ) is revealed. the sound condition of transmissibility fault and feeding water source, which are imperative in formation of the low - medium temperature geothermal system of convective type, is possessed in pingzhuang basin

    通過對平莊盆地礎地質資料、國內外大量地熱地質資料的分析和野外地質調查、礦井實測地溫以及上升泉、斷層涌水的地球化學分析等工作礎上,指出地處低地溫梯度背景區的平莊盆地地溫梯度異常是由於盆地底隆起和坳引起傳導型大地熱流再分配所致;運用州sys數值模擬了大地熱流向地表傳導背景下的盆地地溫場,從而揭示了盆地底(義縣組)頂界面地溫分佈特徵;闡明了盆地具有形成中低溫對流型地熱系統所必需的導水斷裂、補給水源等的良好條件,中低溫對流型地熱系統是地熱勘查的主要對象;圈定了平莊盆地北部朝溝?駱駝營子地熱勘查遠景區。
  3. They are paleozoic ~ early mesozoic - fold deformation and the appearance of reversed fault ; mesozoic - the beginning of graben faulting - block period ; early cenozoic - the phase of broke - the forming of block hill ; late cenozoic - the phase of segging - the forming of buried hill. we mark off five kinds of buried hill belts. they include three different kinds of trap on the basis of the cause of trap formation

    本次研究在重新認識濟區域構造背景的礎上,將濟古生界潛山的形成過程分為四個階段,即古生代早中生代?穩定沉降?隆升?輕微褶皺變形及逆斷層發育階段、中生代?初步斷階段?塊斷期、新生代早期?斷拗階段?塊斷潛山形成期以及新生代晚期?坳階段?潛山定型期。
  4. And the solutions of the three problems above are discussed : the solution to the simulcast interfering which is caused by the simulcast delay spread ( sds ) and the zero - beating is given in chapter four. based on the well understanding of the principle of ms - i / h / 0 in ipnp, the examples are given in chapter five on how to solve the problem of communication interruption between paging zones. through the analyse of signal switching between chengdu and deyang, the synchronization error between flex frames, and the bug in the multi - frequency roaming principle are pointed out

    通過以上分析,文章探討了對上述三個問題的解決: ?對同播干擾問題,分別分析了時延差和零拍頻所造成同播干擾的客觀存在,探討了系統設計和網路優化的本方法; ?對ipnp聯網障礙,提出了在掌握ipnp對各pncc作為輸入局歸屬局?輸出局( ms ? i h o )的靈活定義、以及相關參數配置原理的礎上,分析聯網障礙的思路; ?對信號切換障礙,以成都和德兩地的局部廣域覆蓋為例,分析了flex幀失步和flex多頻漫遊原理設計缺的客觀存在,並探討了相關的解決方法和建議。
  5. Application of sedimentary simulation techniques in oil and gas field exploration - a case study about baimiao gas field in dongpu depression based on a detailed investigation about the similar research by scholars in china and foreign countries, this paper has discussed about the current status of the development of the sedimentation simulation technologies in china and foreign countries, and expounded on the principles and methodology for the study of sedimentation simulation. with the fan delta at es2lower, es3upper, es3middle and es3lower of baimiao gas field in pudong depression as the object of this research, this dissertation has carried out a systematic study about the processes of formation and laws of evolution of the fan delta, and elucidated the characteristics about the distribution of sand at different stages

    《沉積模擬技術在油氣田勘探開發中的應用?以濮白廟氣田為例》一文在詳細調研國內外同類研究的礎上,論述了沉積模擬技術國內外的發展現狀,並闡述了開展沉積模擬研究的原理、方法,以濮白廟氣田es _ 2 ~下、 es _ 3 ~上、 es _ 3 ~中、 es _ 3 ~下扇三角洲為研究對象,系統研究了扇三角洲的形成過程及演變規律,指出了不同時期砂體分佈特徵,為儲層預測提供了一套行之有效的方法體系。
  6. Finally summarizing comprehensively various measures deals with collapsible loess, aiming at property and actual condition of collapsible loess at guanzhong area, taking example for foundation trea tment of xianyang aerodrome speedway, investigating and demonstrating many projects on foundation treatment and think dynamic compaction and lime - soil compaction pile are fit to treat collapsible loess of this section, designing both of the projects and hope to offer suggestions to engineering practice

    最後全面總結了濕性黃土處理的各種措施,針對關中地區濕性黃土的特點和實際情況,以咸機場高速公路路處理為例,對多種地處理方案進行研究論證后認為,強夯法和灰土擠密樁法適合該路段濕性黃土處理,並分別對這兩種方案進行了設計,以期給工程實踐提供建議值。
  7. In the paper, through the example of the waiting hall of xt an international airport, several main questions meet in the design have been discussed, analyzed and solved, which include in negative friction force around pile in collapsible loess, the calculating method of bearing capacity of pile. the crack control methods of analysis and design in the super - length reinforced structure have been tested in the project, and reached the effect to be hoped

    本文通過西安咸國際機場新航站樓工程設計的具體實例,分析、論述了建築結構在設計中遇到並解決的幾個主要問題:如自重濕性黃土場地樁負摩阻力問題;淺層土雖經強夯但下層土仍有可能產生負摩阻力時樁的承載力計算方法;對鋼筋混凝土結構的裂縫控制實現超長設計的分析和設計對策,經過工程驗證,達到了預期的效果。
  8. Through changing and improving the traditionally adopted technology and equipment in compacted lime - soil pile foundation, so as to eliminate weak collapsibility of loess in luoyang and increase the strength of foundation, the authors present formulas to compute the average dry density and void ratio after ground treatment and demonstrate the feasibility of these formulas through practical project cases

    摘要於洛地區次生黃土的弱濕性,對傳統的灰土擠密樁施工工藝和設備進行改進,達到消除濕性,提高地承載力的目的,並且推導出地處理前後干密度和孔隙比隨置換率變化的關系,以工程實例證明該公式的可行性,避免布樁型式的經驗性和處理結果的不確定性。
  9. On the basis of systematic research, it is shown that there exist great resource potential and different exploration targets in deep viscous crude of jiyang depression

    在系統研究的礎上,指出了濟具有很大的深層稠油資源潛力及不同類型深層稠油的勘探方向。
  10. According to coring observation, a lot of well logging and seismic data, sedimentary facies types and their distribution in cretaceous of jiyang depression were comprehensively studied, and the primary controlling factors were analyzed

    在系統觀察巖心的礎上,結合測井、地震等資料,對濟白堊系沉積特徵進行了綜合研究,並探討了沉積的主要控制因素。
  11. Based on the national real situations, the article analyzed the reason why bad debts came to being and what is the present situation, studied the essential elements of the bad debts " appraisal applying the basic theories and methods of assets appraisal, elaborated on the various disposing approaches in use or in discussion and valued them. meantime, in terms with the characters of different disposing approaches, the article studied the defaults existing in the present methods of the appraisal of bad debts and gave some suggestion to improve them

    本文立足於我國現實國情,在對金融不良資產的成因及現狀進行分析的礎上,運資產評估的本理論和方法對不良資產評估的本要素進行了研究,對各種已經實施和尚處在討論中的處置方式進行了闡述和評價,同時結合金融不良資產不同處置方式的特點研究了現行不良資產評估方法上存在的缺,並提出了改進的思路。
  12. Then on the basis of experimental data of collapsible loess of speedways from weinan to tongguan and xianyang aerodrome, analyzing influential factors of collapsibility, establishing expressions between collapsible coefficient and physical mechanical character parameters via regression analysis, and discuss preliminarily collapsible mechanism of loess at guanzhong area

    重點以渭潼高速公路和咸機場專用高速公路沿線濕性黃土的試驗資料為礎,對黃土濕影響因素進行了分析,通過回歸分析建立了濕系數與各物理力學性質指標之間的關系式,並對關中地區黃土的濕機理進行了初步探討。
分享友人