隧落 的英文怎麼說

中文拼音 [suì]
隧落 英文
peel
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : 落名詞[方言] (北方對蓮花落的俗稱) a kind of folk song
  1. Announce according to top people court " about hearing person damages case applicable law the explanation of a certain number of problems " regulation, road, bridge, channel wait for what build artificially to because safeguard, build thing, administrative flaw sends a person to damage ; pile up article boils fall, slide or pile up content collapse sends a person to damage ; arboreous dump, break off or fructification falls send what the person damages to perhaps manage a person to assume liability to pay compensation by everybody, but the exception that can prove oneself do not have fault

    根據最高人民法院公布《關于審理人身損害賠償案件適用法律若干問題的解釋》規定,道路、橋梁、道等人工建造的構築物因維護、治理瑕疵致人損害的;堆放物品滾、滑或者堆放物倒塌致人損害的;樹木傾倒、折斷或者果實墜致人損害的由所有人或者治理人承擔賠償責任,但能夠證實自己沒有過錯的除外。
  2. Impacts on the locally rare lesser club - footed bat and short - nosed fruit bat have not been fully addressed either. wbased on the above, we find the subject eia report failing to meet the requirements of the eiao tm and respectfully request the director of environmental protection to consider disapproving the captioned eia report

    基於以上各點,世界自然基金會認為上水至馬洲支線道高架橋方案環境影響評估報告未能符合環境影響評估程序的技術備忘錄的要求,故懇請環境保護署署長否決該申請。
  3. The tunnels are some 20 m wide and correspondingly high and even a small stone falling from the roof could have killed a man.

    這些道的寬度大約為20米,高度與此相仿,所以,即使頂部下一塊很小的石頭都可能致人于死命。
  4. With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places

    摘要採用鐵路工程抗震設計規范、動三軸試驗及有效應力的理論分析相結合的方法,對南京地鐵南北線( 1號線)區間道開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當道底板坐在5層且5層較厚時的液化區出現在道襯砌底板處;局部地段液化區出現在道頂部及拱腰;大部分地段的液化區出現在道頂板上方。
  5. Wwf hong kong is greatly disappointed by the decision of the environmental protection department to approve the kcrc s sheung shui to lok ma chau spur line environmental impact assessment report. we found the adverse impacts incurred by the spur line project to be environmentally unacceptable, and the eia report failing to meet the requirements of the technical memorandum for the eia process under the eia ordinance because of the following reasons

    世界自然香港基金會簡稱世界自然基金會對環保署批準九廣鐵路的上水至馬洲支線道高架橋方案環境影響評估報告下稱環評報告深表失望,認為支線工程會造成不可接受的環境影響,而且環評報告亦未能符合環境影響評估程序的技術備忘錄的要求,因為:
  6. A director of an engineering company was charged for allegedly deceiving the highways department over the disposal of asbestos wall panels removed from the aberdeen tunnel

    廉政公署案起訴一名工程公司董事,控告他在香港仔道更換石棉板工程中,涉嫌訛稱已按照要求將拆卸的石棉板棄置,以欺騙路政署。
  7. A staff of the highways department and a subcontractor were charged for their alleged involvement in a fraudulent scheme to deceive hyd over the replacement of damaged asbestos wall panels inside the aberdeen tunnel

    廉政公署案起訴一名路政署職員及一名分判商,控告他們在香港仔道更換石棉板工程中涉嫌詐騙路政署,訛稱已將損壞的石棉板更換,裝上水泥纖維板。
  8. Four more company directors and executives were charged with conspiracy to defraud the highways department over the disposal of asbestos wall panels of the aberdeen tunnel. three other persons were earlier charged in connection with the same case

    廉政公署案起訴四名公司董事及經理,控告他們在香港仔道更換石棉板工程中涉嫌詐騙路政署,訛稱已按照要求將拆卸的石棉板棄置。
  9. Probabilistic analysis on blocks sliding of large - span tunnel

    大跨度巖體道工程塊體滑的概率分析
  10. Therefore, ventilation in a road tunnel becomes extremely important. until now, our investigation and research in this field is far behind abroad, and is badly hindering the tunnel construction

    我國對道通風的研究比較晚,而且水平遠遠後于國外,已經成為制約我國道建設發展的瓶頸。
  11. Take the mtr to shau kei wan station and turn left at exit b1, walk northwards along shau kei wan main street east for about 10 minutes to the island eastern corridor, cross the road by the pedestrian subway and you will get to tam kung temple on the north of the corridor

    從地下鐵路筲箕灣站b1出口步出后左轉,沿筲箕灣東大街往北走大約10分鐘便會看到東區走廊。利用行人道橫過路口,便可到達坐於東區走廊北面的譚公廟。
  12. The stone falling disease in chengkun railway and its renovation measure by both bridge and tunnel specialties are recommended

    摘要介紹了成昆線工點的石病害以及橋梁與道兩個專業協同設計完成病害整治的情況。
  13. The spur line project comprises four major sections, namely, the tunnels, the viaducts, lok ma chau station, and the modification works at the existing sheung shui station

    建造工程主要包括四大項目:道段、高架橋段、馬洲站以及為現時上水站進行的改善工程。
  14. Objection to the kcrc s eia - tunnel viaduct option

    反對上水至馬洲支線道高架橋方案環評報告
  15. Plasticity analysis and numerical modelling of tunnel collapse in cohesive soil

    黏土中道垮的塑性分析和數值模擬
  16. The planning of lujiazui central area combines modern functions, environment, communications, scenic sights, ecology, and space art in an overall and three - dimensional design. a meticulous plan has been made to landscape the riverside plots, with high - risers setting off each other, to furnish residential areas with shopping facilities to organize a complete system of underground, water, surface and air transportation in co - ordination the subway, the tunnel, the viaducts with surface traffic and landscaped pedestrian walkway, lujiazui will be built into a golden delta on the east bank of the huangpu river

    陸家嘴中心區綜合了現代功能、環境、交通、景觀、生態、空間藝術而進行全方位立體化的規劃,使沿江地帶綠化覆蓋,摩天大樓錯有致,商業服務設施與住宅相互配套,對地鐵、道、高架與地面車運、綠化步行街也作了周密規劃,組成地下、水路、地面、空中的立體系統,陸家嘴將成功地塑造一個黃浦江東岸的「金三角」 。
  17. Therefore, ventilation in a fire emergency in a roadway tunnel becomes extremely important. until now, our investigation and research in this field is far behind abroad, and is badly hindering the tunnel construction

    國外對于公路道火災情況下的通風問題的研究十分重視,而國內這方面研究極少,水平遠遠後于國外,已經成為制約我國道建設發展的瓶頸。
  18. Citic pent - ox metropolis business hotel shanghai is a 3 - star standard hotel located on pudong avenue, the heart of lujiazui finance trade zone. the hotel enjoys good transportation link, where there is only 3 minutes from the yan an road tunnel and about 20 minutes walk to the oriental pearl tower

    中信五牛城酒店式公寓是中信集團公司屬下的三星標準涉外酒店,座於陸家嘴金融貿易中心區域,六快二慢浦東大道上,東西各距延安路雙線道和楊浦大橋5分鐘車程,交通快捷便利。
  19. 17. the review report has explained why the cwb cannot be replaced by traffic management measures such as electronic road pricing ; equal tolls for the cross harbour tunnels ; extension of the mtr to kennedy town ; provision of hillside escalators from central to mid - levels ; provision of bus - bus interchanges at the fringe areas of central and restricting loading and unloading times in central

    17 .檢討報告書已解釋為何中環灣仔繞道不能以下述的交通管理措施取代,例如電子道路收費劃一過海道收費把地下鐵路伸延至堅尼地城興建中環至半山區的山坡自動扶梯在中環外圍設巴士轉車站和限制在中環上客貨的時間。
  20. Pat heung road near tai lam bus interchange - lok ma chau san tin public transport interchange

    八鄉路(近大欖道轉車站) -馬洲(新田)公共交通交匯處
分享友人