隧道排水 的英文怎麼說
中文拼音 [suìdàobèishuǐ]
隧道排水
英文
tunnel drainage- 隧 : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 排 : 排構詞成分。
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
- 排水 : drain off water; drain away water; dewatering
-
In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented
摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道滲漏水調查情況和鐵路隨道涌水狀態分類,運用工程類比法提出適合該地區公路隧道防排水結構設計的隧道涌水類型劃分及對涌水類型校核與細分的三種方法。Applicahon of small and even catchment thechnique in the tumnel
小平導排水技術在隧道中應用E plumbing : including tunnel, platform. . etc. water supply and drainage system ; totally water pump
給排水:包含隧道月臺等之給排水系統,給水泵共763馬力污排水泵共141了馬力Including tunnel, platform. . etc. water supply and drainage system ; totally water pump 763hp, waste and drainage pump 1417hp
給排水:包含隧道、月臺等之給排水系統,給水泵共763馬力、污排水泵共141了馬力、They built a tunnel to drain water out of the mines
他們造了一條隧道以排出礦坑的水。Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel, this paper discusses some corresponding countermeasures including the improvement of ground property, appropriate draining of groundwater, scheduled excavation depth and width, etc, to control strata distortion and surface settlement, and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation
摘要針對深圳地鐵淺埋暗挖隧道施工中影響地表下降及地層變形的因素,提出了遵循「十八字」原則、改善土體特性、適度排放地下水、根據地層條件選擇施工方法、增大左右線隧道開挖面的距離、合理確定開挖進尺、提高施工效率、加強初期支護、及時施作二次襯砌等對策。Secondly, it brings forward that it is a practical technical and structure mode to use the multiple preventing layer as the water preventing and draining system in highway tunnel of loess
然後在總結現有公路隧道防排水技術特點的基礎上,提出了黃土公路隧道防排水系統宜採用復合防水層為主的適用技術與結構型式,得出了一些有益的結論。Technical code for waterproofing and drainage of railway tunnel
鐵路隧道防排水技術規范It is applied to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, to drill drainage holes and grouting pile holes on roof of tunnel gallery
適用於水電站鐵路公路邊坡大噸位預應力錨固孔排水孔隧道口管棚孔的施工,以及預防滑坡巖石坍塌等地質災害治理工程。The conclusion is that the extrusion presses between primary and secondary linings, elasticity of the waterproof layer and unblocked drainage layer are the vital factors influencing the waterproof layer of spraying - on acrylate membrane in tunnel composite linings
試驗結果表明,襯砌間的擠壓應力、防水層的彈性恢復能力、通暢的排水層對丙烯酸鹽噴膜防水層在隧道復合式襯砌中的防水效能發揮重要作用。The lining of a tunnel in the area with high groundwater table does not bear high external water pressure in - normal, the surrounding rock reinforced by intrusion concrete does it. in the case, the groundwater through reinforced rock accumulated in the space between lining and rock must be drained in time
一般鐵路隧道通過高水位富水區時,不用襯砌直接承受較高的外水壓力,要實現這個設計目標必須做好襯背的排水工作,使通過加固圈滲透過來的水量及時排走,及時削減累積的水量。( 2 ) when tunnel water is blocked up fully behind the lining, water pressure on the lining will reach maximum at last so long as surrounding rock near the lining is infiltrative no mattter how much the permeability coefficient of surrounding rock is
( 2 )隧道採用完全不排水措施時,只要襯砌附近的圍巖滲水,襯砌背後與含水圍巖有水力聯系,不論滲透系數多大,襯砌背後最終水壓會達到靜水壓,計算時水壓不宜折減。First, on the base of investigating geleshan geologic environments, the author carefully analyzes them, studies their water storage structure, discusses the relationship of underground water dynamic changes and tunnel drainage by desiccation ; secondly, the author makes the dynamic analysis, regression analysis, routine hydrochemistry analysis, isotope analysis, so draws to guan - yin gorge anticlire east and west slot ' s karst developing features, alternated conditions underground water and supplying drain ways ; thirdly, by stating the fissuring ' s surveying data, the author calculates the seeping tensor
作者在進行歌樂山地質環境調查的基礎上,仔細分析了大量觀測資料,研究其儲水構造,掌握地下水動態變化與隧道施工涌水的關系,及補給受降雨的影響情況。對隧道周圍的地下水進行動態分析、回歸分析、常規水化學分析以及同位素分析,得出觀音峽背斜東西翼槽谷的巖溶發育特徵,及地下水的循環交替條件、補給排泄途徑;統計分析裂隙測量數據,計算滲透張量。In order to solve some technique problems of waterproof and drainage of tunnels based on controlling drainage, model tests, numerical simulations and site investigations were performed by use of two cases longtan tunnel and baiyun tunnel
摘要針對控制排放的隧道防排水技術中一些關鍵問題,以龍潭隧道和白雲隧道為依託,採用模型試驗、數值模擬、現場調查等方法進行了系統研究。With the development of tunneling technique, and in view of environment ( especially water environment ) protection, a principle of limited drainage on the basis of blocking water has been putting forward
隨著隧道修建技術的發展,以及環保(特別是水環境保護)的要求,以堵為主的「控制排水」原則設計問題已經提到有關方面的議事日程。This article introduced the method of geological investigation of nanling tunnel karst disease, elaborated the tunnel engineering geology conditions, especially the karst water, the karst water power channel and the harm of karst water, and analyzed the cause that produced the karst disease
摘要南嶺隧道巖溶地下水活動造成地表坍陷、洞內泥砂淤塞等病害,其原因在於隧道施工遺留的導洞長期疏排巖溶水,採用地質測繪、物探、鉆探、水文地質試驗等綜合勘察方法,查明地下水通道位置、地下水流速、流向,針對病害原因,提出攔截、封團、疏排、填充等綜合整治方案。The panels discussed the recent problems encountered in the tunnelling works project under the strategic sewage disposal scheme ssds stage i and expressed concern on the consequential delay in completion of the project
兩個事務委員會討論策略性污水排放計劃第i階段的隧道挖掘工程最近出現的問題,並對該等問題引致工程完成日期受到延誤一事表示關注。Firstly, the environment harm of the waste rock is studied ; secondly, we research the physics and mechanics property of the waste rock of the dabagou tunnel and get the physics and mechanics property index of waste rock ; thirdly, after comminuting the waste rock and compounding concrete as coarse aggregate, we make the comparison between it and the songshan stone in the fuxin building market at present, it proves to possess extension application value ; fourthly, on the foundation of it, we utilize waste rock as coarse aggregate to compound high strength concrete, steel fiber high strength concrete, polymer cement concrete, asphalt concrete by uniform design and research their mechanics property index by experiment
首先闡述了排矸石對環境產生的危害,其次對大巴溝隧道排矸石的物理力學性質進行了試驗研究,獲得了排矸石的物理力學性能指標。將排矸石粉碎后,作為粗骨料配製成混凝土,與目前阜新建築市場上所用的松山石子進行比較,證明其具有推廣應用價值。在此基礎上,利用均勻設計法,將排矸石作為粗骨料配製成高強混凝土,鋼纖維高強混凝土,聚合物水泥混凝土,瀝青混凝土,通過試驗測定其力學指標,獲得了各種排矸石混凝土的優化方程和最佳配合比。Experiment research of drain technology of tunnel in forever frozen soil
多年凍土地區隧道排水技術試驗研究At the last, on the base of that, the author builds up 2 - d model ( modflow ) to simulate numerical value of surrounding underground water changes by tunnel water invasion, researches the effects on surrounding underground water system for tunnel drainage by desiccation, forecasts the restoring cases after the exclusion of water, at the same, analyzes the influences in underground water level and surface collapse by tunnel excavating
並且在此基礎上建立modflow二維模型對隧道涌水引起周圍地下水變化進行數值模擬,研究隧道疏干排水對周圍地下水系統影響,進行模擬並預測堵水成功后水位的恢復情況,最後分析隧道對周圍地下水位以及引起的地面塌陷的影響。分享友人