  1. In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented

    摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路滲漏調查情況和鐵路隨狀態分類,運用工程類比法提出適合該地區公路結構設計的類型劃分及對涌類型校核與細分的三種方法。
  2. Applicahon of small and even catchment thechnique in the tumnel

    小平導技術在中應用
  3. E plumbing : including tunnel, platform. . etc. water supply and drainage system ; totally water pump

    :包含月臺等之給系統,給泵共763馬力污泵共141了馬力
  4. Including tunnel, platform. . etc. water supply and drainage system ; totally water pump 763hp, waste and drainage pump 1417hp

    :包含、月臺等之給系統,給泵共763馬力、污泵共141了馬力、
  5. They built a tunnel to drain water out of the mines

    他們造了一條出礦坑的
  6. Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel, this paper discusses some corresponding countermeasures including the improvement of ground property, appropriate draining of groundwater, scheduled excavation depth and width, etc, to control strata distortion and surface settlement, and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation

    摘要針對深圳地鐵淺埋暗挖施工中影響地表下降及地層變形的因素,提出了遵循「十八字」原則、改善土體特性、適度放地下、根據地層條件選擇施工方法、增大左右線開挖面的距離、合理確定開挖進尺、提高施工效率、加強初期支護、及時施作二次襯砌等對策。
  7. Secondly, it brings forward that it is a practical technical and structure mode to use the multiple preventing layer as the water preventing and draining system in highway tunnel of loess

    然後在總結現有公路技術特點的基礎上,提出了黃土公路系統宜採用復合防層為主的適用技術與結構型式,得出了一些有益的結論。
  8. Technical code for waterproofing and drainage of railway tunnel

    鐵路技術規范
  9. It is applied to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, to drill drainage holes and grouting pile holes on roof of tunnel gallery

    適用於電站鐵路公路邊坡大噸位預應力錨固孔口管棚孔的施工,以及預防滑坡巖石坍塌等地質災害治理工程。
  10. The conclusion is that the extrusion presses between primary and secondary linings, elasticity of the waterproof layer and unblocked drainage layer are the vital factors influencing the waterproof layer of spraying - on acrylate membrane in tunnel composite linings

    試驗結果表明,襯砌間的擠壓應力、防層的彈性恢復能力、通暢的層對丙烯酸鹽噴膜防層在復合式襯砌中的防效能發揮重要作用。
  11. The lining of a tunnel in the area with high groundwater table does not bear high external water pressure in - normal, the surrounding rock reinforced by intrusion concrete does it. in the case, the groundwater through reinforced rock accumulated in the space between lining and rock must be drained in time

    一般鐵路通過高位富區時,不用襯砌直接承受較高的外壓力,要實現這個設計目標必須做好襯背的工作,使通過加固圈滲透過來的量及時走,及時削減累積的量。
  12. ( 2 ) when tunnel water is blocked up fully behind the lining, water pressure on the lining will reach maximum at last so long as surrounding rock near the lining is infiltrative no mattter how much the permeability coefficient of surrounding rock is

    ( 2 )採用完全不措施時,只要襯砌附近的圍巖滲,襯砌背後與含圍巖有力聯系,不論滲透系數多大,襯砌背後最終壓會達到靜壓,計算時壓不宜折減。
  13. First, on the base of investigating geleshan geologic environments, the author carefully analyzes them, studies their water storage structure, discusses the relationship of underground water dynamic changes and tunnel drainage by desiccation ; secondly, the author makes the dynamic analysis, regression analysis, routine hydrochemistry analysis, isotope analysis, so draws to guan - yin gorge anticlire east and west slot ' s karst developing features, alternated conditions underground water and supplying drain ways ; thirdly, by stating the fissuring ' s surveying data, the author calculates the seeping tensor

    作者在進行歌樂山地質環境調查的基礎上,仔細分析了大量觀測資料,研究其儲構造,掌握地下動態變化與施工涌的關系,及補給受降雨的影響情況。對周圍的地下進行動態分析、回歸分析、常規化學分析以及同位素分析,得出觀音峽背斜東西翼槽谷的巖溶發育特徵,及地下的循環交替條件、補給泄途徑;統計分析裂隙測量數據,計算滲透張量。
  14. In order to solve some technique problems of waterproof and drainage of tunnels based on controlling drainage, model tests, numerical simulations and site investigations were performed by use of two cases longtan tunnel and baiyun tunnel

    摘要針對控制放的技術中一些關鍵問題,以龍潭和白雲為依託,採用模型試驗、數值模擬、現場調查等方法進行了系統研究。
  15. With the development of tunneling technique, and in view of environment ( especially water environment ) protection, a principle of limited drainage on the basis of blocking water has been putting forward

    隨著修建技術的發展,以及環保(特別是環境保護)的要求,以堵為主的「控制」原則設計問題已經提到有關方面的議事日程。
  16. This article introduced the method of geological investigation of nanling tunnel karst disease, elaborated the tunnel engineering geology conditions, especially the karst water, the karst water power channel and the harm of karst water, and analyzed the cause that produced the karst disease

    摘要南嶺巖溶地下活動造成地表坍陷、洞內泥砂淤塞等病害,其原因在於施工遺留的導洞長期疏巖溶,採用地質測繪、物探、鉆探、文地質試驗等綜合勘察方法,查明地下位置、地下流速、流向,針對病害原因,提出攔截、封團、疏、填充等綜合整治方案。
  17. The panels discussed the recent problems encountered in the tunnelling works project under the strategic sewage disposal scheme ssds stage i and expressed concern on the consequential delay in completion of the project

    兩個事務委員會討論策略性污放計劃第i階段的挖掘工程最近出現的問題,並對該等問題引致工程完成日期受到延誤一事表示關注。
  18. Firstly, the environment harm of the waste rock is studied ; secondly, we research the physics and mechanics property of the waste rock of the dabagou tunnel and get the physics and mechanics property index of waste rock ; thirdly, after comminuting the waste rock and compounding concrete as coarse aggregate, we make the comparison between it and the songshan stone in the fuxin building market at present, it proves to possess extension application value ; fourthly, on the foundation of it, we utilize waste rock as coarse aggregate to compound high strength concrete, steel fiber high strength concrete, polymer cement concrete, asphalt concrete by uniform design and research their mechanics property index by experiment

    首先闡述了矸石對環境產生的危害,其次對大巴溝矸石的物理力學性質進行了試驗研究,獲得了矸石的物理力學性能指標。將矸石粉碎后,作為粗骨料配製成混凝土,與目前阜新建築市場上所用的松山石子進行比較,證明其具有推廣應用價值。在此基礎上,利用均勻設計法,將矸石作為粗骨料配製成高強混凝土,鋼纖維高強混凝土,聚合物泥混凝土,瀝青混凝土,通過試驗測定其力學指標,獲得了各種矸石混凝土的優化方程和最佳配合比。
  19. Experiment research of drain technology of tunnel in forever frozen soil

    多年凍土地區隧道排水技術試驗研究
  20. At the last, on the base of that, the author builds up 2 - d model ( modflow ) to simulate numerical value of surrounding underground water changes by tunnel water invasion, researches the effects on surrounding underground water system for tunnel drainage by desiccation, forecasts the restoring cases after the exclusion of water, at the same, analyzes the influences in underground water level and surface collapse by tunnel excavating

    並且在此基礎上建立modflow二維模型對引起周圍地下變化進行數值模擬,研究疏干對周圍地下系統影響,進行模擬並預測堵成功后位的恢復情況,最後分析對周圍地下位以及引起的地面塌陷的影響。