電源地線 的英文怎麼說

中文拼音 [diànyuándexiàn]
電源地線 英文
power ground
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 名詞1. (水流起頭的地方) source (of a river); fountainhead 2. (來源) source; cause 3. (姓氏) a surname
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 電源 : source; current source; electric source; power pack; power supply; power source; source of power ...
  1. Being a method of time - domain electrical magnetic surveying, the transient electromagnetic method ( tem ) can transmit first pulse electromagnetic field to underground making use of loop or electrical source and receive secondary induction field during of the pulse intermission

    瞬變磁法是一種時間域磁測量方法,是利用不接或接下發送一次脈沖磁場,在一次脈沖磁場的間歇期間,採用不接圈接收感應二次磁場。
  2. Based on theory and experiences, this paper has discussed how to choose assistant electrode distance, large - current power, measuring points, measuring lines, etc. in detail

    結合理論和實踐經驗,著重討論了四極法輔助極距離、大網測量點、測量的選擇等問題。
  3. Energy consume, electric strength, insulation resistance, ground conductivity, leakage current, microwave leakage, power input, normal temperature, humidity treatment, glow wire, horizontal flame, vertical flame, tracking, ball pressure, rainproof, water splash, dustproof, salt fog, endurance, motor load test, cord flexing, cord pulling, pull & torque test, lamp replacement, construction check etc

    能耗、氣強度、絕緣阻、接連續性、泄漏流、微波泄漏、功率、溫升、濕熱試驗、灼熱絲、水平燃燒、垂直燃燒、漏起痕、球壓試驗、防雨淋、防濺水、粉塵、鹽霧、耐久性(壽命)試驗、機負載試驗、彎折、提拉、拉扭力測試、燈頭互換性、安全結構檢查等。
  4. Abstract : a cad tool based on a group of efficient algorithms to verify, design, and optimize power / ground networks for standard cell model is presented. nonlinear programming techniques, branch and bound algorithms and incomplete cholesky decomposition conjugate gradient method ( iccg ) are the three main parts of our work. users can choose nonlinear programming method or branch and bound algorithm to satisfy their different requirements of precision and speed. the experimental results prove that the algorithms can run very fast with lower wiring resources consumption. as a result, the cad tool based on these algorithms is able to cope with large - scale circuits

    文摘:介紹了一個基於標準單元布圖模式的/網路的輔助設計集成工具.它應用了一系列高效的演算法,為用戶提供了/網路的設計、優化和驗證的功能.非性優化技術、分枝定界演算法和不完全喬萊斯基分解的預優共軛梯度法是該工作的三個主體部分.用戶可以選擇使用非性規劃的方法或者幾種分枝定界方法來滿足他們對于精度和速度方面的不同需求.實驗結果表明,文中所提供的演算法可以在很快的運行速度下實現更低的布佔用.因此,在這些有效演算法基礎上實現的輔助設計工具具有處理大規模路的能力
  5. As the key block of the wireless communication transmitter in rf, it is very useful in improving the output power and efficiency, lowering the loss of the supply, lowering the size and the weight, lengthening the time of communication. class e power amplifier which is suitable to amplify envelop signal is very important in modern communication system

    功率放大器( pa )作為無通信射頻發射機中不可缺少的關鍵路,對于提高手機的功率效率、降低損耗、減小體積重量、延長通話時間有著舉足輕重的作用,而適用於恆包絡信號放大的e類功率放大器,更是在現代通信系統中佔有十分重要的位。
  6. A protective method based on voltage - frequency - converter and additional dc measuring the insulation between monitor wire and ground lines of hv double screen cable is developed and realized by analog and digital circuits

    通過分析6kv纜絕緣監視保護的特點,提出了在高壓纜監視與接之間附加直流並利用v / f轉換實現監視保護的新方法,設計了相應的路。
  7. Transmitting noise is main interfereing source of switch power supply which is coupled through lines of power supply, singal, interlinkage and grouding

    摘要傳導型噪聲是開關的主要騷擾,它可以通過、信號、互連、接導體等進行耦舍。
  8. Experiments have failed in the process of debugging station fire mode of the first opening segment of guangzhou metro line 3, the main reason is the delay protect module of wind valve which cut off power supply

    摘要廣州鐵3號首通段車站火災模式調試過程中,出現火災模式執行失敗,主要原因在於風閥延時保護模塊動作切斷
  9. With the development of electronic technology in the field of high - frequency and high - power, power mosfet is gradually enhancing its important status in semiconductor apparatus and is being widely applied in power converters as switch. with the increasing of the operating frequency ( > 200khz ), the energy loss caused by parasitic capacitance will affect the efficiency of power transforming in converters. especially in the applications of high frequency power supply using mosfet as main devices ( the unit of frequency is mhz ), the energy loss caused by the switch process will badly affect its efficiency

    隨著子技術進一步向高頻的大功率用領域發展,功率mosfet在各種力半導體器件中的重要位日益顯著,使用功率mosfet作為開關器件的功率轉換路也日益增多,但隨著器件開關頻率的提高(大於200khz ) ,由器件極間容引起的能量損耗將會影響到功率轉換路的能量傳輸效率,特別是在以mosfet作為開關器件的高頻感應加熱中(工作頻率可達兆赫) , mosfet在開關過程中的能量損耗嚴重影響到的效率,因此如何減小開關器件的損耗提高高頻功率轉換路的效率成為子技術領域的重要研究課題之一。
  10. The research shows that the protection of the industrial control system are not only need the external lightning protection system such as air terminals, down conductors and grounding system, but also need the internal lightning protection system such as equipotential bonding, shielding and surge protection of information system and electrical system

    經研究,對工業控制系統的防雷保護不僅要做好接閃器,引下,接體等基本的外部防護,還要做好等位聯結,屏蔽,信號系統和系統的涌保護等相關內部防雷措施。
  11. Dttb ( digital television terrestrial broadcasting ) is one of the present digital television broadcasting modes, whose transmission media is earth. after a decade of intense research and development, the standards of digital television satellite broadcasting and digital television cable broadcasting have been confirmed. but the standard of digital television terrestrial broadcasting is still in disputation, for its transmission environment is rather awful, its spectrum resource is very limited and its service required is disperse, so it is potential to be improved in many aspects

    數字視廣播發展近十年來,衛星和有纜廣播的基本傳輸體制已確定,而面廣播由於傳輸環境惡劣,頻譜資有限,應用需求分散,其標準在各國仍有極大的爭議,因為目前沒有一套標準能解決實際面傳輸中的所有問題,因此數字面廣播在許多方面都有很大的改進潛力。
  12. For the improvement of reliability and stability of the whole apparatus, meanwhile, for eliminating various electric - magnetic disturbance within the power supply and ground, measures such as filter, grounding, shielding are all taken in technique. the special methods are lc filter for power supply, bypass capacitor for suppressing voltage surge in printed circuit board, shielding layer wrapped in sensor head and overall grounded

    通過採用合理的濾波、接、屏蔽等各種方法,尤其是採用lc濾波路、上加旁路容抑制路板上的壓波動、傳感頭加屏蔽層、傳感頭總體接結構等多種抗干擾辦法,減小了上的各種磁干擾,保證了系統的穩定性和可靠性。
  13. In december of 1933, karl jansky, a radio engineer published his discovery of " electrical disturbances apparently of extraterrestrial origin

    1933年12月,無工程師央斯基karl jansky發表了接收到球以外的無的發現。
  14. To avoid electrical shock hazards, never operate the sewing machine with the ground wire for the power supply removed

    為了防止觸事故,卸下電源地線的狀態,請不要運轉縫紉機。
  15. She picks up the detached power and phone cords in disbelief

    她無法相信撿起被拔掉的。 )
  16. In the second chapter, equivalent circuit of the eddy current sensor is firstly analyzed. based on that, the carrier signal generating circuit that is realized by the lc periodic circuit is introduced, thus, the carrier signal of standard frequency is obtained through the trimming capacity. subsequently, the disc type rotational armature generator and the rotational coupling transformer are separately leaded in to realize the power supplies of the carrier signal generating circuit and output of the measuring signal

    在傳感器設計一章中,首先對渦流傳感器進行等效路分析,在此基礎上分析了由感、容諧振路構成的載波信號發生路,並通過微調容獲得了標準頻率的載波信號;接下來提出了採用盤式旋轉樞發機解決載波信號發生供給問題的方案,同時通過旋轉耦合變壓器的引入,使得測量信號輸出問題很好解決;本章最後給出的一組實驗曲充分說明了這一方案的可實現性。
  17. According the special application background of the single source and the short line in the 110kv power system, the author proposed a feasible protective scheme, in which the power frequency variation distance protect theory with combination to the four - lateral distance relay is used as quick and mainly theory

    本人針對110kv單路這一特殊應用背景,提出了以工頻變化量距離保護為快速主保護,結合四邊形三段式相間和接距離保護的保護原理方案。
  18. It firstly utilizes the characteristic of layout geometric information to partition the global network into some sub networks. after these sub networks are compressed by cholesky factorization, the sub networks edge nodes are combined with other nodes. calculating the final linear equations group, the algorithm can be very effective

    演算法首先利用版圖幾何特徵,按最小割原理將網劃分成子網,利用對稱正定矩陣cholesky分解壓縮子網內點;將子網等效成與網路其它部分連接的結點集的等效網路,最後通過計算壓縮后的網路,獲得性方程組求解答案。
  19. Electrical connections : each machine should be provided with a separate power connection and ground. individual on / off controls should also be provided

    器連接:每個設備必須配備一個獨立的和接,個別設備還應具備on / off開關。
  20. Design verification problem needs hierarchy methodology. because the effect of interconnection has taken in the highest flight, design verification for the interconnection network, for example, only the completed verification for performance of power supply of p / g network can ensure the reliability of chip

    由於晶元內互連作用已佔相當重要的位,在對互連網路作精確的設計驗證,例如,晶元網的供性能的驗證,是晶元工作的可靠性的保證。
分享友人