電纜平衡 的英文怎麼說

中文拼音 [diànpínghéng]
電纜平衡 英文
cable balancing
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名1. (拴船用的鐵索或多股粗繩) cable; hawser; mooring rope 2. (擰成多股的似纜物) thick rope; cable Ⅱ動詞(用繩索拴船) cable
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : Ⅰ名詞1 (秤桿) the graduated arm of a steelyard2 (稱重量的器具) weighing apparatus3 (姓氏) a...
  • 電纜 : cable; electric cable
  1. The sensor used unbalanced principle of alternating electric field around feed cable to detect the state of electric field of cable core over the ground, thereby got out the result that the feed state of cable in mine had no relation to the current in the cable

    該傳感器利用饋周圍交替場的不原理檢測芯線對地的場狀態,從而間接檢測出礦井的饋狀態與是否有流無關。
  2. Bno radio - frequency connectors. part 22 : r. f. two - pole bayonet coupled connectors for use with shielded balanced cables having twin inner conductors type bno

    射頻連接器.第22部分:與雙內導體屏蔽配用的卡口連接式二極射頻連接器
  3. In this application, the lorentz force generated by the interaction between the current in the wire and the geomagnetic field produces an electro - dynamic drag leading to a fast orbital decay. in this paper, we make an intensive study of the process of de - orbiting using electro - dynamic tether system. the concrete work includes : firstly, i have studied the basic principle of how to generate the electro - dynamic drag, modeled via accuracy geomagnetism, made a concrete analysis of the de - orbiting duration, the magnitude and direction of electro - dynamic drag under the action of the dipole and accurate geomagnetic models, set up a counterbalance between electro - dynamic torque and gravity gradient torque, emulate the de - orbiting process of spacecraft, and compared the change of six orbital factors and the de - orbiting duration under the action of the dipole and accurate geomagnetic models

    本文對基於動力繩的航天器離軌過程進行了深入研究,具體工作如下:首先,本文研究了動力繩產生動力拉力的基本原理,建立了精確地磁場模型;分別在偶極子模型和精確地磁場模型作用下,對動力拉力的大小、方向、離軌時間及動力繩傾角的大小進行了計算分析;建立了動力力矩與繩系統重力梯度力矩的關系;分析了動力力矩為系統提供能量的原理;最後分別在偶極子地磁場模型和精確地磁場模型作用下,對受動力繩作用的航天器的離軌過程進行模擬,分析了在不同精度地磁場模型下,航天器離軌過程中各軌道參數的變化情況,並比較了不同模型對離軌時間的影響。
  4. 1000base - tx a full duplex ethernet physical layer specification for 1000mb s 1000base - tx operating over category 6 balanced twisted pair cabling

    在6類絞線對上用1000mb s
  5. The last proposed method is based on the distributed parameter model, the algorithm utilizes searching and iteration methods to locate the fault point

    第三種方法採用線路的分佈參數線路模型,根據功率原理推導出故障測距方程,並通過搜索迭代方法解之。
  6. Compensation for changes in loss as a cable ' s temperature varies. its purpose is to adjust equalization so that the flat frequency response is maintained as the temperature changes

    補償在溫度變動時中的損耗。其目的是調整以致於在溫度變化時也能得到穩的頻率響應。
  7. Test methods for communication cable - capacitance unbalance test

    通信試驗方法容耦合及對地容不試驗
  8. Struggled through 3 years, we had made a 480 - channels marine multi - component seismic exploration system. include new circuit design of digital package, omnidirectional 3 component geophone, ocean bottom towed cable, marine four component seismic acquisition unit, hydrophone, recording system etc. in july 2001, this system was used in dagang field and worked over twenty km. we obtained a good seismic data

    目前已完成了一套480道海底採集系統,包括數字包的創新路設計,三分量檢波器的萬向裝置,海底鎧裝結構,可拖曳的四分量採集一體化單元,水聽器,系統主機等,並於2001年7月和2002年5月兩次在大港油田渤海灣海域進行了現場實驗,獲得了良好的地震資料。
  9. , communication cables - specifications for test methods - electrical test methods - unbalance attenuation longitudinal conversion loss, longitudinal conversion transfer loss

    通信.試驗方法規范.氣試驗方法.不衰減
  10. Communication cables - specifications for test methods - part 1 - 9 : electrical test methods unbalance attenuation longitudinal conversion loss, longitudinal conversion transfer loss

    通信.試驗方法規范.第1 - 9部分:氣試驗方法.不衰減
  11. Commercial building telecommunications cabling standard - part 2 : - balanced twisted - pair cabling components - addendum 9 - additional category 6 balance requirements and mesurement procedures

    商用建築敷設標準.第2部分:雙絞線組件.補充件9 .附加分類6要求和測量過程
  12. Commercial building telecommunications cabling standard - part2 : balanced twisted - pair cabling components - addendum 11 : specification for increased diameter of 4 - pair utp and sctp cables

    商用建築敷設標準.第2部分:雙絞線組件.補充件11 .增加4對utp和sctp直徑的規范
  13. This paper analyzed the electromagnetic leakage mechanisms of a symmetric transmission line and cable with insert of unbalanced loads

    摘要對鏈接不負載的一對行對稱傳輸線和行對稱傳輸磁泄漏機製做了解釋。
  14. Chapter 1 introduce the development situation of the marine multi - component seismic exploration technology in our country and abroad. chapter 2 sum up the structure of the system. chapter 3 to 6 includes the design and function of the homemade sample equipment and the advantage of its key technique. just as omnidirectional geophone struture, ocean bottom cable, data acquisition unit and recording system etc. chapter 7 carefully instructs test situation of converted wave acquisition on the sea and appreciates the data quality

    第一章主要介紹了目前海上多波勘探技術的國內發展概況及市場需求,第二章對整個系統的構成及各部分的功能進行了簡要的總結,第三章至第六章詳細討論了各功能模塊的原理、技術指標及創新點,包括各項關鍵技術的突破,如三分量萬向裝置的理論計算及設計,數字包路設計原理,鎧裝結構的設計及系統主機的特點等。
  15. Generic cabling systems - specification for the testing of balanced communication cabling in accordance with iso iec 11801 - part 1 : installed cabling

    通用布線系統.根據iso iec 11801對通信布線進行檢驗的規范.第1部分:敷設
  16. Testing of cables, wires and flexible cords ; capacitance unbalance vde specification

    導線和軟線的檢驗.容的不性. vde規范
分享友人