電路故障試驗 的英文怎麼說

中文拼音 [diànzhàngshìyàn]
電路故障試驗 英文
circuit disturbance test
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ名詞1 (事故) event; incident; happening; accident 2 (原因) cause; reason 3 (朋友; 友情) fr...
  • : Ⅰ動詞(阻隔; 遮擋) block; hinder; obstruct Ⅱ名詞(遮擋物) barrier; block; obstacle
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 電路 : [訊] circuit (ckt); electric circuit; electrocircuit電路板 circuit board; 電路保持 guard of a c...
  • 故障 : hitch; breakdown; stoppage; fault; faulting; accident; blunder; bug; conk; failure; impairment; i...
  • 試驗 : trial; experiment; test
  1. The problem about neutral - point - grounding mode is an all - around technical problem which associated with not only power system reliability , insulation coordination , electromagnetic interference , but assault safety 。 in china , the neutral grounding modes of the 10kv net involved of none grounding, grounding by arc suppressing coils, resistance grounding or reactance grounding in the past 。 with the development of civic power network , low resistance grounding mode was used to restrain the over voltage, particularly in guangzhou, shanghai , beijing , and zhuhai etc. it was reported that the over - voltage level of low resistance grounding mode is lower than that of arc suppressing coil mode, but the operation carried out the other way 。 at substations in guangzhou and shanghai it was found that the low resistance grounding mode is successful 。 but in some areas , such as zhuhai , substations grounding with low resistance revealed some problems , including power supply reliability rapidly dropping , transmitting line often tripping ; and person safety being threatened 。 so interiorly the grounding mode selection of the 10kv network was disputed, which mainly focused on the fault form of 10kv net grounding, the apply area of suppressing arcing coil grounding mode, power supply reliability level of the two modes, person safety, communication interfere and the workload of maintenance

    爭議點主要是在10kv網接地的形式、消弧線圈接地的應用范圍、兩種運行方式供可靠性的高低、人身安全、通訊干擾和運行維護工作量等諸多方面。 11 17本論文就是針對以纜為主的城區10kv網中性點接地方式的選擇問題進行研究。論文首先對10kv網的中性點運行各種方式進行分析,比較各方式的特點,然後以重慶儲奇門變站10kv網的實際參數來建立數值計算模型,在考慮了網接地流變化、中性點阻取值大小、接地點接地阻值變化等多種影響因素的情況下,對中性點經消弧線圈接地和經小阻接地方式下網的過壓水平和接地點短流大小進行了數值計算,其計算結果與科院所作現場進行了比較。
  2. The influence of stray inductance in the module circuit to turn - off transient over voltage of igct has been investigated systematically, the surge current calculation has been done by simulation, and the short circuit failure once occurred in experiment has been analyzed by computer simulation, reproduced the breakthrough failure happened in experiment by means of simulation

    充分利用計算機模擬的優勢,詳細分析了模塊雜散感對igct關斷過壓的影響,進行了短浪涌流計算,對中發生的短進行計算機模擬分析,重現了中出現的誤觸發貫穿短現象。
  3. Experimental results in this paper show our approaches can be efficiently used in delay testing for complex circuits with noise effects

    表明,本文的方法可以應用在復雜超深亞微米的延時中,有一定推廣價值。
  4. The thesis devote to desams ( double - channel electro - hydraulic servo adaptive motor simulator - rig ) condition monitoring and accessing in theory and application. based on short signal analysis theory, the thesis explores the representative vibration faults of complex and non - linear equipment by both theoretical and experimental methods systematically

    本文基於簡訊號分析技術,針對液伺服道模擬臺運行狀態監測和狀態評價,對簡訊號的最大熵譜分析技術在自復雜非線性系統的實時在線診斷領域的應用進行了系統的理論和實研究。
  5. The experimental results indicate that it is feasible to applied at - speed current testing to at89c51 microprocessor at instruction level. through testing of data paths, we can not only detect the faults arose by data path, but also find the faults brought in by control parts

    結果表明,用全速流測在指令級對at89c51微處理器進行測是可行的,通過測所有的數據通,不僅可以檢測數據通,而且可以檢測由於控制錯誤而引起的數據傳送錯誤。
  6. Road vehicles ; diagnostic testing of electronic systems ; identical with iso 8093, edition 1985

    車輛.子系統的診斷
  7. The 6psd30 - 1 fuel injection pump test stand is the 1970 ' s product and leave unused. its electrical control part is made up of large discrete components with low - test sensitivity, inconvenient setting and adjustment, high trouble rate. moreover, its circuit components are aging and spoiled

    6psd30 - 1型子控制噴油泵臺是七十年代的產品,其氣控制部分採用大量分立元件構成,測靈敏度低,設定調整不方便,率高,而且元件大多老化、損壞,現處于閑置狀態。
  8. The simulative tests by computer and experiments by test - bed all can indicate that the established modularization and multi - layers fault diagnosis system for desams is not only simple but also specific and real - time

    計算機模擬和臺架實表明,所建立的「模塊化」 ,多層次液伺服道模擬臺的診斷系統具有結構簡單、任務明確、實時性強等特點。
  9. The multi - layers fuzzy neural networks fault diagnosis system is set up by using the hierarchy decomposing strategy to carry out condition monitoring and diagnosing. finally, combined with the technology of short signal analysis, the application software of fuzzy neural networks fault detecting and diagnosis system ( fdds ) for desams is developed independently with the microsoft visual c + + 6. 0

    利用功能層次分解策略,建立了液伺服道模擬臺的診斷的多層次智能診斷系統,採用vc6 . 0開發工具,自主開發了具有實際應用價值的診斷軟體fdds 。
  10. Guide for synthetic fault testing of ac high voltage circuit breakers rated on a symmetrical current basis

    額定對稱流基礎上的交流高壓斷器的綜合指南
  11. 2 ) we put up the experiments mainly based on the cpld for the faults emulation on some typical digital circuits. and we built the transition function databases according to the faulty testing results

    2 、以cpld為核心進行了一些典型數字模擬模擬,建立被測的狀態轉移函數集,為進一步研究的可測性和診斷提供了數據。
  12. As a result of the international advanced technology and detection means so that the test - bed habitat leading domestic level, can be quickly and easily, and visual on the domestic and import cars ignition system, the charge of the starting circuit, speakers circuit, lighting system, signal lines, electronic ignition components such as testing, inspection and adjustment, can also check the work of a car engine, engine fault diagnosis of the reason that test bed is the experimental large automobile repair shop, the second category repair shop and car essential for the use of the transport sector detection equipment, by all parts of the country auto repair trade management departments welcomed

    由於採用了國際上先進的技術和檢測手段,使本實臺居國內領先水平,可以快速方便,直觀的對國產、進口車的點火系、充系起動、喇叭、燈光系、信號線子點火組件等進行、檢查和調整,還可以檢查汽車發動機的工作情況,診斷發動機的原因,所以本實臺是汽車大修廠、二類修理廠和汽車使用運輸部門必不可少的檢測儀器,深受全國各地汽車修理行業管理部門的歡迎。
  13. ( 3 ) we put up the experiments for the faults emulation on some digital signal circuits. these experiments were mainly based on the cpld / fpga and we built the testing faulty databases according to these circuits

    ( 3 )以可編程邏輯器件為核心進行了一些典型數字模擬模擬,並建立相應的集數據庫,為這些的可測性研究提供數據。
  14. And through simulative experiments by pspice, the analysis of the test results for short faults, open faults and transistor parameter errors in cmos and bicmos circuits are given

    並通過模擬實,分析了動態流檢測方法對cmos與bicmos中短、開、晶體管參數錯誤的測情況。
  15. Experimental results show that more than 20 % stuck - open faults in part of is85 and iscas89 circuits can produce 2. 5 times iddr variation, and then can be detected by iddt testing

    結果表明,中相當一部分是i _ ( ddt )可測的。並與以前的自動測產生演算法做了比較,此演算法穩定性好、速度快且可測性測度值好。
  16. In this paper, on the basis of typical circuit fault model and conventional bit testing arithmetic, the verification platform for bit technique is founded, which is composed of a fault injector and a manage computer

    論文在研究航空發動機數控系統典型模式和常規bit檢測演算法的基礎上,建立由注入器和管理計算機構成的bit技術平臺。
  17. Supplement to guide for synthetic fault testing of ac high - voltage circuit breakers rated on a symmetrical current basis - 8. 3. 2 : recovery voltage for terminal faults - asymmetrical short - circuit current

    額定在均衡流基礎上的交流高壓斷器模擬指南補充. 8 . 3 . 2 :終端恢復壓.不平衡短
  18. Based on the fault tree analysis ( fta ), the main loop circuit of electrical life - test device is studied and its corresponding fault tree constructed

    樹分析理論的基礎上,對壽命設備的主迴進行了分析,並建立相應的樹。
  19. The experimental results illuminate the hierarchical test generation algorithm can greatly decrease the scale of test sets ( about 66 % ), but the fault coverage and time performance are lower than gate - level test generation

    數據表明分層測產生演算法能大大壓縮集(約為66 ) ,而覆蓋率有略微下降,時間性能也有些許降低。
分享友人