露天模型 的英文怎麼說

中文拼音 [lòutiānxíng]
露天模型 英文
open-air model
  • : 露動詞[口語] (顯露; 表現) reveal; show
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • 露天 : in the open; open-air; outdoors
  • 模型 : 1 (仿製實物) model; pattern 2 (制砂型的工具) mould; pattern3 (模子) model set; mould patter...
  1. Abstract : considering the stochastic characteristic of main hydrogeologic parameters in yuanbaoshan open coal pit, a groundwater stochastic management model for optimal drainage borehole design is established. the result of the modeling shows the effect of stochastic characteristics of hydrogeologic parameters on the result of management modeling. it was found that the higher the parameters uncertainty and the management reliability level, the worse the management result

    文摘:從影響元寶山礦地下水疏乾的主要水文地質參數隨機性特徵分析入手,建立並求解了元寶山礦疏干工程優化設計的隨機地下水管理,揭示了水文地質參數隨機性對管理結果的影響,認為參數的隨機性越大,管理結果越壞;置信水平越高,管理結果越壞,且滲透系數和邊界條件對管理結果影響最大。
  2. The mathematics model of the produce arrangement for the strip mine and trucks dispatch

    礦生產安排及車輛調度的數學
  3. The thesis detailedly discusses a kind of optimize method on genetic algorithm, and points out the advantage obout utilizing genetic algorithm to solve large - scale non - linear system. through the study on large - scale strip mine truck real - time dispatch system, proposes the optimize model of strip mine truck real - time dispatch system, and utilizes the characteristic of genetic algorithm, provides a method of using genetic algorithm to solve the optimize model, designs the genetic operators at the same time. by the program language of matlab, develops strip mine truck real - time dispatch system. the system has the advantage of simpless and perfect function, proposes powerful sustain for strip mine ' s production and decision - making

    本文詳細討論了遺傳演算法這種優化方法,指出了遺傳演算法在解決大非線性系統優化問題時的優越性。通過對大礦卡車調度系統的研究,建立了礦卡車實時調度系統的優化,並藉助于遺傳演算法自身的優點,給出了應用遺傳演算法解算該優化的編碼方法,設置了相應的遺傳運算元。並用matlab編程語言開發了礦卡車實時調度系統,該系統具有操作簡單和功能較完善等優點,為礦的生產決策提供了強大的支持。
  4. Finally, jinduicheng mo. company open - pit is quoted as an instance for building mine transportation vechile scheduling system model, and according to the model, adopt genetic algorithm to study the optimization of mine transportation vechile scheduling system. a rational project is given to this problem, the paper also analysized the optimial design of mine transortation vechile scheduling, the model offering in this paper, convergence of optimal algorithm and data bank management, and transportation project of minerals and disposals is optimized, which realize the decision of transportation project and data visibilization, and wich improves the science and information process of transportation department management

    最後,論文以金堆城鉬業公司礦為例建立礦山運輸車輛優化調度,結合所建立的礦山車輛優化調度,採用遺傳演算法對礦山運輸車輛系統進行優化研究,為其提供合理的體系方案。並對礦山車輛優化調度系統設計進行了詳細分析,提出的礦山車輛優化調度系統,集優化演算法與數據庫管理分析於一體,進行礦巖運輸方案的優化,實現調度方案決策的可視化、運行數據的可視化,促進運輸部門管理的科學化、信息化進程。
  5. ( 3 ) soil erosion assessing systems and evaluating water - soil safety models have been first raised in the stackpile of large opencast mine within loess area

    ( 3 )初次建立了我國黃土區大礦排土場土壤水性致災因子指標體系和水土安全評價
  6. Aiming at various problems that exist management system of ore blending in open - pit and actual production in sandaozhuang open - pit, this thesis brings forth the ore blending ' s method making use of the linear program and gets a total the strategy to the ore blending. this thesis, in specific operation, adopts a simplification model with ore blending. the primitive data of ore blending direct come from measuring

    本論文針對目前礦配礦管理系統中存在的各類問題以及三道莊礦的生產實際,提出了先採用線性規劃配礦原理配礦,得到一個總體配礦策略,然後再採用一個簡化配礦來處理,其中配礦原始數據直接從爆堆測量中獲取,保證了數據的準確性和快捷性。
  7. The model that this method adopts is not only fully expressing fuzzy attribute of the mine, but also making the resolution ratio high based on the research, this decision - making model is applied to tonglushan mine for starting the open north stope, the result shows : this method is scientific, simple and accurate, and it offers rational basis for the decision making of the mine

    在學習、研究大量多屬性決策糊多屬性決策基礎上,對各個進行了分析比較,提出適合礦產資源開發的決策,並經過深入研究,對進行了改進,使得解析度進一步提高。在分析研究基礎上,將該決策應用於銅綠山銅鐵礦,結果表明:該方法科學、簡便、精確,為北礦啟動決策提供了合理的依據。
  8. The artificial neural network model which forecasts open mining slope stability is established by neural network theory and method. the article describes the nonlinear reflection relation between stability target of open mining slope and its influence factor. the article brings forward the method of forecasting open mining slope stability

    利用人工智慧中的神經網路原理和方法,建立了礦順層邊坡穩定狀態預測的神經網路,描述了礦山邊坡穩定指標與其影響因素的非線性映射關系,提出了礦邊坡穩定性預測的神經網路原理和方法。
  9. Multiobjective non - linear programming model of the transporting arrangement in the production of strip mine

    礦生產中車輛安排問題的多目標非線性規劃
  10. Ecological evaluation model for large opencast mine and its application

    礦區生態評價研究及應用
  11. In order to decrease the size of fragmentation and reduce blasting vibration effects on the stability of eastern open pit slope of tongshankou copper mine < this work involved two steps. first of all, based on the experiment in laboratory, this paper presented the optimum blasting parameters and applied it in practice

    為降低銅山口礦采場生產爆破的大塊率和地震波振動強度,保證采場東幫陡邊坡的穩定,本文在對國內外大量文獻綜合調研的基礎上,首先採用正交設計對現場爆破參數進行了室內實驗,得出優化的爆破參數后又應用於生產。
  12. Yuanbaoshan surface mining deposit model and mining plan system

    元寶山礦地質及采礦計劃編制系統
分享友人