靜水壓比 的英文怎麼說

中文拼音 [jìngshuǐ]
靜水壓比 英文
hydrostatic pressure ratio
  • : Ⅰ形容詞1. (安定不動; 平靜) still; calm; motionless 2. (沒有聲響; 清靜) silent; quiet Ⅱ名詞(姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 壓構詞成分。
  • : Ⅰ動詞1 (比較; 較量高下、 長短、距離、好壞等) compare; compete; contrast; match; emulate 2 (比...
  • 水壓 : water gage; hydraulic pressure (用英寸高度表示的)水壓泵 hydraulic pump; 水壓鍛造 hydraulic forg...
  1. Based on measurement of strains of both horizontal stirrups in the joint core and longitudinal reinforcement passing througth the joint, in different stages, transfer mechanism and factors affacting seismic behavior of the joint, were analysed. under different shear compression ration, effect of axial force ratio on seismic behawior of the joint was also evaluated, static shear and seismic shear of the joint based on capacity design were investigated. on this basis, new governing criteria and conditions of seismic behavior of the joint were put forward

    通過對節點區平箍筋以及貫穿節點梁、柱縱筋在不同受力階段應變的精細量測,對節點的傳力機理以及影響抗震性能的因素進行了分析研究;對不同剪條件下軸對節點抗震性能的影響規律進行了分析研究;對不同受力階段梁筋的粘結退化規律以及節點區的剪切變形進行了分析研究;對節點的力抗剪與建立在能力設計思路上的抗震抗剪問題進行了深入研究,提出了建立在新思路基礎上的節點抗震性能控制準則和控制條件。
  2. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場載荷試驗及力盒實測數據,探討了基底應力分佈規律,樁土應力,變形模量的變化關系,對分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力進行了整體評價。
  3. After researching the part thermal equipments and systems include heaters, steam leakage and receiving systems, low pressure drain system etc, and computing the efficiency of the systems, find out the better choice of the imported assemblies than the domestic assemblies in parameter and the disfigurements in design and making. based on the above, point out the measure to progress them. according to the analysis, we can get some measures to increase the economical level of the systems and save more energy

    對局部熱力設備及熱力系統進行分析研究,包括:加熱器設備、漏汽及回收系統、低加疏系統、主、再熱蒸汽系統以及凝汽器等部位;並計算汽輪機本體高、中、低缸效率,藉此著重對汽輪機通流部分進行了剖析,找出國外進口機組動、葉柵、葉型的選擇國產機組先進性以及國產機組在通流部分設計和製造中的諸多缺陷,並且指出了改進的方向,為機組提高熱經濟性、節能降耗奠定了理論基礎。
  4. Genetic algorithm is used to optimize the parameters of pid controller that is used to control the plant lon ( local operating network ) is designed to control vav air - conditioning system. by this means the static pressure control and minimum total supply air volume control are experimented. the paper analyzes the coupling among loops, the whole system ' s stability and energy saving effect under the two control methods

    針對目前變風量空調系統的模型都是用機理建模方法建立的情況,本論文用最小二乘法對機組部分進行系統辨識,建立了閥?送風溫度、變頻風機?兩個迴路的模型,經驗證較接近實際系統;採用遺傳演算法對pid控制器的參數進行尋優,尋優結果令人滿意;設計了變風量空調系統的lon控制網路,以此為實現手段,進行了定控制和最小總送風量控制,並在兩種控制方式下,分析了各個迴路的耦合情況、兩種控制方式的穩定性和節能效果。
  5. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案較,最終選擇了技術先進的砂墊層預抬高分級充法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充加載階段地基超與深層平位移、油罐底板力分佈及地基土強度增長等方面的實測與數據分析。
  6. Based on the experimental results for different wave height, wave period and the relative clearance of underside of the wharf deck, the properties of wave impact pressure on wharf deck are studied. the distribution of impact pressure along the underside of the deck model is analyzed. the influence of different incident wave parameters, structure dimension and relative clearance s / h1 / 3 on the impact pressure is discussed

    通過對不同波浪參數、結構物尺度、結構物與面的距離等情形的試驗結果的較分析,研究隨機波浪對不同接岸型式碼頭面板的沖擊力特性,分析波浪沖擊力沿碼頭面板底面的分佈規律,討論入射波要素、結構物尺度、結構物相對凈空等要素對碼頭面板底面所受的沖擊力的影響規律,給出便於工程應用的計算波浪沖擊力的經驗公式。
  7. The results of numerical experiments, using the four - dimensional variational data assimilation system of the nonhydrostatic mesoscale model mm5, show that : the tangent linear model and adjoint model conducted by keeping the " on - off " switches the same as the basic state, can provide a good approximation of the first - order information to the nlm perturbation and a good descent direction for the minimization procedure ; switching on and off at every other time step in the kuo cumulus parameterization scheme do n ' t impact the convergence rate of cost function ; the existence of the switches do n ' t impact improvement to the mm5 model rainfall prediction because that not only specific humidity, but also wind, temperature and pressure are assimilated into the model

    力中尺度數值模式mm5的四維變分資料同化系統進行的數值試驗結果表明: 「開關」變量保持與基態一致,所構造的切向線性模式能夠提供關于非線性模式擾動的一階近似,伴隨模式所計算的梯度值能夠為最小化過程提供較好的下降方向;郭氏降參數化方案中對流每隔一個積分步的交替發生並不影響目標函數最小化的收斂速度; 「開關」變量的存在也不影響將風、溫度、氣濕結合起來同化對mm5降預報準確性的提高。
  8. The recovery time duration of normal blood pressure and urine volume was sooner in group a than that in group b. [ conclusions ] the lactate - directed medical therapy associated with a marked decrease in mortality for patients undergoing heart surgery makes the time duration of recovery sooner in lactate - directed group

    結論使用血乳酸平可以更好地監測患者組織平的灌注是否充分,結合使用中心對于補液及心功能的調整單獨使用中心更有優勢,能很好地改善患者的預后。
  9. Based on the data of vertical and horizontal displacements from a certain construction site in cixi city of zhejiang province, the validity of controlling earth - extrusion effects in saturated soft clay ground caused by statically piling was quantitatively analyzed and compared with different technical measures, including reduction of piling rate and installation of stress - relax holes

    摘要根據在浙江省慈溪市某法沈樁施工現場所監測的地基土位移數據,定量分析較了控制施工進度、設置應力釋放和排深孔等工程技術措施對減輕飽和軟粘土地基沈樁擠土效應的有效性,並初步提出了現場地基土位移及其變化速率的監控標準。
  10. When putting the static curve with the elongation of 1. 4 and the dynamic curves in different pressure together, we can find that the slope coefficients of the static curve increase with the growth of radius

    把伸長為1 . 4時的態曲線和三種平下的動態曲線放在一起,從態曲線可以看出,當直徑增大時,曲線的斜率也逐漸增大。
  11. We did n ' t find that there was significant difference between the dynamic and the static curves in radius in the same pressure. the statistics on the slope coefficients of the dynamic and the static curves in the pressure of 80 - 120mmhg showed that there was significant difference between the means of slope coefficients of the dynamic and the static curves

    平為80 - 120mmhg時的動態和態曲線的斜率進行統計,得出的結論為:在80 - 120mmhg的平下,伸長分別為1 . 4 , 1 . 6 , 1 . 8時,動態和態曲線的斜率的平均值具有明顯差異。
  12. Further more, the computer code pdss is used to analyze the consolidation process of composite ground with cement - mixed columns under one teaching building and under one laboratory building, respectively, and the principle of the developments of excess pore water pressure in these composite ground and of the settlement is revealed. finally, the fem results are compared with the ones obtained from traditional method and field observation, and the feasibility of using pdss to calculate the settlement of composite ground with cement - mixed colu mns after construction of building is discussed

    進而運用pdss程序對一教學樓和一實驗綜合樓的泥攪拌樁復合地基的固結過程進行了較完整的數值計算,分析了該類復合地基中超和基底沉降的發展規律,並通過與規范法計算值和現場實測數據的較,討論了採用pdss程序計算建築物下泥攪拌樁復合地基沉降和工后沉降的可行性。
分享友人