靜水段 的英文怎麼說

中文拼音 [jìngshuǐduàn]
靜水段 英文
quiet reach
  • : Ⅰ形容詞1. (安定不動; 平靜) still; calm; motionless 2. (沒有聲響; 清靜) silent; quiet Ⅱ名詞(姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  1. I shot past the head at a ripping rate, the current was so swift, and then i got into the dead water and landed on the side towards the illinois shore

    流很急,我的小舟箭一般劃過島的頂端。接下來劃到了,便在面對著伊利諾斯州的一邊上了岸。
  2. It was a monstrous big river down there - sometimes a mile and a half wide ; we run nights, and laid up and hid daytimes ; soon as night was most gone we stopped navigating and tied up - nearly always in the dead water under a towhead ; and then cut young cottonwoods and willows, and hid the raft with them

    一到下游那邊,只見一條大得嚇人的大河有的地方河面有一英里半開闊。我們在夜晚行駛白天,便躲起來。夜快盡了,我們便停止航行,把筏子靠岸總是靠在一處沙洲流平的地,然後砍下白楊和柳樹的嫩枝,把木筏子給遮蓋起來。
  3. Based on the result of the comparision static penetrat ion test and field vane shear test before and after the treatment of soft founda tions for a experimental section, and based on four static loading tests for two single piles and two composite foundation, behaviors of soil among piles before and after the construction of powder - spray piles and the pattern of the ch ange of the stress ratio between piles and soil are studied, a new determination met hod for bearing capacities of cement powder - spray piles and composite foundati on is proposed, and the formula for calculation of composite foundation bearing capacity are revised

    基於某試驗路軟基處理前後力觸探、十字板試驗的對比測試和對兩根單樁、兩處單樁復合地基進行的4次載試驗,研究了樁間土性狀在施工泥粉噴樁前後的變化和樁土應力比的變化規律,提出了根據載試驗確定粉噴樁及其復合地基承載力新的取值方法,並修正了復合地基承載力的計算公式。
  4. Abstract : based on the result of the comparision static penetrat ion test and field vane shear test before and after the treatment of soft founda tions for a experimental section, and based on four static loading tests for two single piles and two composite foundation, behaviors of soil among piles before and after the construction of powder - spray piles and the pattern of the ch ange of the stress ratio between piles and soil are studied, a new determination met hod for bearing capacities of cement powder - spray piles and composite foundati on is proposed, and the formula for calculation of composite foundation bearing capacity are revised

    文摘:基於某試驗路軟基處理前後力觸探、十字板試驗的對比測試和對兩根單樁、兩處單樁復合地基進行的4次載試驗,研究了樁間土性狀在施工泥粉噴樁前後的變化和樁土應力比的變化規律,提出了根據載試驗確定粉噴樁及其復合地基承載力新的取值方法,並修正了復合地基承載力的計算公式。
  5. Based on measurement of strains of both horizontal stirrups in the joint core and longitudinal reinforcement passing througth the joint, in different stages, transfer mechanism and factors affacting seismic behavior of the joint, were analysed. under different shear compression ration, effect of axial force ratio on seismic behawior of the joint was also evaluated, static shear and seismic shear of the joint based on capacity design were investigated. on this basis, new governing criteria and conditions of seismic behavior of the joint were put forward

    通過對節點區平箍筋以及貫穿節點梁、柱縱筋在不同受力階應變的精細量測,對節點的傳力機理以及影響抗震性能的因素進行了分析研究;對不同剪壓比條件下軸壓比對節點抗震性能的影響規律進行了分析研究;對不同受力階梁筋的粘結退化規律以及節點區的剪切變形進行了分析研究;對節點的力抗剪與建立在能力設計思路上的抗震抗剪問題進行了深入研究,提出了建立在新思路基礎上的節點抗震性能控制準則和控制條件。
  6. Test results indicated : with the hoist of altitude, the increase of ice amount and the rise of pollutant, the average flashover voltage reduced. the character exponent generally depends on the insulator profile, ice amount, ice state and pollution severity etc. by means of a high - speed camera, a data acquisition system and high voltage test facilities, a series of the flashover processes on ice surfaces were record. the experimental results form this study and the subsequent theoretical analyses suggested : the thermal ionization of the air in front of an arc root resulted in arc movement ; the electrostatic force had an auxiliary effect of impelling arc propagation ; the electrical

    通過對攝像機、數據採集系統及高壓試驗裝置記錄覆冰絕緣子表面閃絡電弧的發展過程的試驗結果進行理論分析得出:弧根周圍空氣的熱電離導致了電弧的發展,電場力對電弧的發展起到了加速作用,電擊穿僅發生在閃絡最終的跳躍階;通過測量閃絡過程中的放電電壓、泄漏電流、閃絡時間、覆冰電導率、電弧長度及電弧半徑等參數,得到了不同階電弧(電弧起弧階、電弧發展階及完全閃絡)的發展速度、臨界電弧長度均隨覆冰電導率的增加而減小。
  7. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩溫控並縫措施研究:為廠房壩並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的動力安全穩定性及溫控方案提供依據。
  8. Genetic algorithm is used to optimize the parameters of pid controller that is used to control the plant lon ( local operating network ) is designed to control vav air - conditioning system. by this means the static pressure control and minimum total supply air volume control are experimented. the paper analyzes the coupling among loops, the whole system ' s stability and energy saving effect under the two control methods

    針對目前變風量空調系統的模型都是用機理建模方法建立的情況,本論文用最小二乘法對機組部分進行系統辨識,建立了閥?送風溫度、變頻風機?壓兩個迴路的模型,經驗證比較接近實際系統;採用遺傳演算法對pid控制器的參數進行尋優,尋優結果令人滿意;設計了變風量空調系統的lon控制網路,以此為實現手,進行了定壓控制和最小總送風量控制,並在兩種控制方式下,分析了各個迴路的耦合情況、兩種控制方式的穩定性和節能效果。
  9. Non linear static & dynamic finite element procedure is adopted for the true emulation of the four typical geologic profiles of the dam, and imitates to compute the each stage deformation and stress distribution from the dam fill to full water run and during the 7 degree seismic intensity, the article also imitates to compute the response to earthquake force, the excess vibration pore water pressure distribution and permanent deformation, predicting the occurrence possibility of the crac ^ plastic zone and earthquake liquefaction

    採用非線性、動力有限元分析程序對圍壩的4個典型剖面進行了、動力模擬模擬,模擬計算了壩體自填築至蓄運行和發生7地震各階壩體及壩基的變形以及應力分佈,地震應力響應和地震引起的超振動孔隙壓力分佈以及永久變形。判斷了壩體和壩基中出現裂縫、塑性區以及地震液化的可能性。
  10. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充預壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充預壓法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充加載階地基超孔壓與深層平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。
  11. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的態應力位移及壩體在竣工期、蓄期等各個階可能產生的破壞進行了認真研究。
  12. The second, open out the definition, the character, the element and the structure of the cis, and bring forward the model of csp ( the core - level determinants, the supplementary - level determinants, and the periphery - level determinants ), then, based on which, aiming at the model of csp, we explain that the basic pattern of the mode of cluster learning which is the dynamic mechanism of cis, and consider that the degree of the interact between the actors of clusters and the knowledge base are the two crucial dimensions in the research of cluster learning, go step farther that we put forward the four corresponding kinds of spatial forms clusters and the three - phrase evolution path, and so the integrated framework of cluster learning is built

    在此基礎上,針對csp模型,從動態知識學習和態知識積累兩個角度解釋了集群學習模式(集群創新系統動態機制)的基本範式、機制模式,明確了集群成員之間知識互動的緊密度和集群態知識基礎的平是考察集群學習的兩個維度,並由此進一步提出了對應的四種集群空間形態和三階演進路徑,從而構建了集群學習的模式框架。
  13. On the basis of integral study of core data, testing and geology in es3 of huzhuangji oilfield both before and afater water injection, the major factors inducing reservoir changes are analyzed in the area after water injection, a model is established for interpreting physical properties of the reservoir, by which the study of reservoir heterogeneity turns to dynamic development from static one, by which basis is laid down for precision study of remaining oil distribution at the high water - cut stage

    在綜合研究胡狀集油田沙三前後巖心、測試、地質等資料的基礎上,分析該區儲層注后容易變化的主客觀因素,建立儲層物性解釋模型,使儲層的非均質研究由態向動態方向發展,為精細研究高含期剩餘油分佈規律奠定基礎。
  14. On basis of the experiment of a pk prestressed composite floor slab under static water, its working performances are studied and analyzed

    通過pk預應力雙向疊合樓蓋的加載試驗,本文對這種雙向疊合樓蓋彈性階的受力性能進行了研究。
  15. Furthermore, author designs some tests, such as diffusion speed test of stress in soil under static load and sound wave test. by these tests, author verified that sound wave test can measure the stress in soil. comparing those aforementioned tests, we can know that their conclusions is coherent, so those conclusions also verify the feasibility of measuring stress in soil by sound wave tests

    經理論以及試驗結果分析,荷載作用下土中應力傳遞速度試驗、聲波試驗以土中應力分佈傳遞規律的試驗及測試技術研究及前述室內模擬試驗,在土體含量、密度變化情況下,三者所獲規律是一致的,初步證實聲波測試技術作為土中應力測試手的可行性,為無損傷、不擾動測試土中應力做了探索性工作。
  16. The modal analysis result shows that the vertical and horizontal frequencies of dps undeployed are high enough and suffice the dynamic stiffness requested for launching. but the large spread length and light weight effect the low frequency of dbs deployed, so considerations should be taken to the effects of other systems of the satellite. the static analysis result shows that the displacements of the dbs are small under the joint affect of vertical and horizontal loads, and stresses are low, so the stiffness and intensity are good enough

    模態分析結果表明伸桿收攏狀態的軸向和橫向頻率都比較高,可滿足發射升空時的動剛度要求;力分析結果表明伸桿結構在衛星處于發射和上升時,在軸向和橫向過載聯合作用下變形均較小,剛度足夠;其應力平亦較低,強度儲備較大。
  17. And the head popped back again ; and we heard no more, for the time, of these six very faint - hearted seamen

    那個腦袋便縮了回去。有一時間,我們再沒聽到這六個嚇昏了頭的手有什麼動
  18. According to the statistical data, the los " of " static state " of guangzhou - shenzhen and guangzhou - foshan freeway are evaluated. according to the 5min data, the los " of " real - time state " of guangzhou - foshan and shanghai - nanjing freeway are evaluated

    並對統計匯總的廣深高速公路和廣佛高速公路實測交通狀態進行了「態」服務平評估;根據5分鐘時實測數據,對廣佛高速公路和滬寧高速公路1車道和2車道進行了「動態」服務平模擬監測。
分享友人