非一致電路 的英文怎麼說

中文拼音 [fēizhìdiàn]
非一致電路 英文
anticoincidence circuit
  • : Ⅰ名詞1 (錯誤) mistake; wrong; errors 2 (指非洲) short for africa 3 (姓氏) a surname Ⅱ動詞1 ...
  • : Ⅰ動詞1 (給與;向對方表示禮節、情意等) deliver; send; extend 2 (集中於某個方面) devote (one s ...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 電路 : [訊] circuit (ckt); electric circuit; electrocircuit電路板 circuit board; 電路保持 guard of a c...
  1. The perfect and swift communication between ciaa and singapore headquarter also other branch offices ensures all our professionals in the company able to share company ' s resources, work together for a same project

    思雅城市景觀( ciaa )有限公司與新加坡總公司及其他分公司保持常完善的聯系,迅捷的訊網等現代技術確保了公司能夠將資源共享並靈活調配,使公司全體專業設計師可以協作,共同力於同項目中。
  2. A major limitation of piezoceramic actuators is their lack of accuracy due to the hysteresis nonlinearity which can result in the degradation of system performance and even lead to instability

    摘要由於壓陶瓷執行器固有的遲滯線性會影響系統的控制精度,甚至能導系統不穩定,基於神經網建立個遲滯線性的智能模型。
  3. As umbirfpa is a new type of infrared detecting device, its work principle is complex and its performance is affected by many factors. in the initial stage of developing, the design experiment and theoretical understanding are little interiorly. furthermore, the problems such as sensitivity reduced, dynamic range shortened, nonuniformity increased come forth if umbirfpa is not designed properly

    Umbirfpa是種新型的紅外探測器件,微測輻射熱計的工作原理復雜,其性能受到很多因素的影響,目前國內尚處于發展初期,缺少實際的設計經驗和理論認識,同時umbirfpa又是在集成工藝線上生產的,投資大、周期長,如果設計不當,不僅可能導靈敏< wp = 13 >度降低、動態范圍縮小、噪聲增大、均勻性增大等問題,更可能的是根本就不能用於成像,從而造成很大損失。
  4. Answer : preparative job includes : understands workplace one, the moving circumstance of 2 equipment, this job has with moving equipment without direct connection, have the job that cooperates without need with other team and group ; makes working priority discipline and the blemish that prepare to solve and weak point ; the staff member makes clear to divide the work and be familiar with the concerned data such as blueprint and test gauge cheng ; should be had the blueprint that agrees with actual state, record that examines last, newest rectify spare parts of the instrument that decides requisition, test gauge cheng, qualification, machine parts or tools kept in reserve, tool and join lead to wait ; is a few righter important equipment, especially complex protector or couplet jumps loop protector, should weave test program, working controller should fill in ticket of protection safety precaution, examine and approve via technical chief, just can carry out

    答:預備的工作包括:了解工作地點、二次設備的運行情況,本工作與運行設備有無直接聯系,與其他班組有無需要配合的工作;制定工作重點項目及預備解決的缺陷和薄弱環節;工作人員明確分工並熟悉圖紙與檢驗規程等有關資料;應具備與實際狀況的圖紙、上次檢驗的記錄、最新整定通知單、檢驗規程、合格的儀器、備品備件、工具和連接導線等;對些重要設備,凡是復雜保護裝置或有聯跳迴保護裝置,應編制試驗方案,工作負責人應填寫繼保護安全措施票,並經技術負責人審批,方能實施。
  5. Especially, the relay protective settings of transmission line are greatly affected by network parameters and framework changing resulted from operational mode of system and the examining and repairing of equipment. so it makes the calculation of relay protective settings more complicated and the more repeated computation work and lasts more time, while the best plan ca n ' t always be achieved

    尤其輸保護整定值受系統運行方式、設備檢修等導的網參數和結構變化影響較大,使得其整定計算更加復雜繁瑣,重復計算工作量常大,耗時較長,而且還不定能夠得到最優方案。
  6. Figure 1 illustrates the connection arrangement of circuit protective conductors ( cpc ) and bonding conductors to exposed and extraneous conductive parts. by proper installation of automatic disconnection devices, cpc and equipotential bonding, in case of an earth fault occurred in an installation, the voltage on any exposedextraneous conductive parts occurring anywhere in the installation should be of such magnitude and duration as not to cause danger ( please refer to figure 2 and 3 )

    因此,當力裝置發生故障時,由於線得到相關截流器的保護,力裝置的任何處的外露金屬部分和氣裝置金屬部分的壓,其強度及持續時間皆不引起危險(請參閱附圖二及三) 。
  7. For the convenience of operation, it is necessary to number 63 e1s. since there are no definite speculations about the corresponding relationship between the e1 numbers and the positions of the tributary channels in the optical circuit, vendors number the e1s on the basis of before and after multiplexing. hence two e1 numbering methods. while difference in numbering will not cause problems in interconnectivity of equipment, it will cause inconvenience of maintenance

    在使用中為了操作方便需要對63條e1進行編號,由於在itu - t的規范中,沒有具體對e1的編號和支在光中的位置的對應關系作明確的規定,所以不同設備供應商分別按照復用前和復用后兩種方式對e1進行編號,因此也就出現了兩種e1的編號方式,編號不不會造成設備對接問題,但是會造成維護的不方便,旦分配時出現人為的差錯,糾正起來常困難,因此在實施前統不同交換機和傳輸設備的編號是十分重要的工作。
  8. Two illustrative examples, a duffing oscillator subject to a harmonic parametric control and a driven murali - lakshmanan - chua ( mlc ) circuit imposed with a weak harmonic control, are presented here to show that the random phase plays a decisive role for control function. the method for computing the top lyapunov exponent is based on khasminskii ' s formulation for linearized systems. then, the obtained results are further verified by the poincare map analysis on dynamical behavior of the system, such as stability, bifurcation and chaos

    通過兩個實例,即類參激激勵作用下的duffing系統和類murali - lakshmanan - chua ( mlc ),考察隨機相位在反饋混沌控制中的影響與作用,利用最大lyapunov指數和poincare截面分析法證實了隨機相位確實可以用來調節系統的混沌行為,即個小的隨機相位的擾動可能導系統從有序轉變為無序,也可能使得系統從無序轉變為有序。
  9. Common forms of arrhythmia, such as atrial flutter, occur when abnormal electrical circuits deelop inside of the heart ' s upper chambers, causing the heart to beat ery quickly ( about 150 beats per minute ) and out of sync with lower chambers, or entricles

    般心律失常的類型,例如心房撲動,是由在上部分的心腔內形成的異常心引起,它導心房跳動常快(大約每分鐘150次) ,從而與下部分的心腔或心室不同步。
分享友人