非計劃停機 的英文怎麼說

中文拼音 [fēihuàtíng]
非計劃停機 英文
unplanned outage
  • : Ⅰ名詞1 (錯誤) mistake; wrong; errors 2 (指非洲) short for africa 3 (姓氏) a surname Ⅱ動詞1 ...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • : Ⅰ動詞1 (停止) stop; halt; cease; pause 2 (停留) stay; remain; stop off [over]: 船在錨地停了一...
  • : machineengine
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  1. Nonscheduled down time

    非計劃停機時間
  2. As acoustic leakage detection technology for power plant boiler tubes can detect small leakages early in boiler tubes before they become catastrophic leakages and reduce economic loss resulted from disarranged stopping of boilers, many research institutes have begun to pay attention to it

    =鍋爐爐管泄漏聲學監測技術由於能夠在電站鍋爐爐管發生輕微泄漏時就可監測到泄漏的發生情況,減少由於非計劃停機帶來經濟損失,因此引起了國內外許多研究構的重視。
  3. In other words, it adopts the principle of main prevention and planned examination to enhance the equipment reliability. in the water power station, whether mechanical equipments maintenance or electric equipments maintenance, the planned maintenance is adopted in the whole of maintenance in order to accomplish the production - reliability target for increasing economy benefit. the production - reliability target includes fof ( forced outage factor ), eaf ( equivalent availability factor ), po ( times of planned outage ), uo ( times of unplanned outage ) etc

    在水電廠,不論械設備還是電器設備,幾乎都是採用固定周期的檢修或更換的處理方法預防事故的發生,完成發電企業確定的可靠性生產指標:提高組的等效可用系數,降低強迫運次數,減少組的運次數(次/臺年)等,從而提高企業的經濟效益。