面竣 的英文怎麼說

中文拼音 [miànjùn]
面竣 英文
facial palsy
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : 動詞(完畢) complete; finish
  1. Upon the completion in 2009, the expansion will add 19, 400 sq m to the hkcec bringing total exhibition space to nearly 83, 000 sq m and total rentable function space close to 90, 000 sq m

    工程將於2009年工,屆時將為會展中心增加19 , 400平方米的展覽場地,使展覽場地增至83 , 000平方米,而中心可租用的總積將接近九萬平方米。
  2. Basis " orders of sell of access of land of shenzhen special economic zone " the seventeenth regulation, contract of sell one ' s own things should have the following and main provision : ( one ) the full name of bilateral party or name, address ; ( 2 ) a ground date of access of land of sell one ' s own things, area ; ( 3 ) land is used year period reach case stop time ; ( 4 ) the amount of gold of land access sell one ' s own things, money is planted, pay kind and time ; ( 5 ) the time of consign land ; ( 6 ) point of program, municipal design ; ( 7 ) project complete is referred check and accept time ; ( 8 ) municipal facilities form a complete set builds obligation ; ( 9 ) land of use photograph adjacent and viatic limitation ; ( 10 ) the project that builds accessary, add establishment and obligation ; ( 11 ) responsibility of breach of contract ; ( 12 ) party thinks necessary other item

    根據《深圳經濟特區土地使用權出讓條例》第十七條的規定,出讓合同應具備以下主要條款: (一)雙方當事人的姓名或者名稱、地址; (二)出讓土地使用權的宗地號、積; (三)土地使用年期及起止時間; (四)土地使用權出讓金的數額、幣種、交付方式及時間; (五)交付土地的時間; (六)規劃、市政設計要點; (七)項目工提交驗收時間; (八)市政設施配套建設義務; (九)使用相鄰土地和道路的限制; (十)建設附屬、附加設施的項目及義務; (十一)違約責任; (十二)當事人認為必要的其他條款。
  3. Above finished floor level affl

    面竣工標高以上
  4. On the western side, belcher bay reclamation and the construction of belcher bay link on it were completed in february 1997 to tie in with the opening of the western harbour crossing

    在港島西,卑路乍灣填海工程及在該填海區興建的卑路乍灣連接路,已在一九九七年二月工,配合西區海底隧道的啟用。
  5. The facility, which was completed at frankfurt airport in germany in december 2004, is over 19, 000 square feet large and features a cigar lounge with leather armchairs

    位於法蘭克福機場的頭等艙休息廳於2004年12月工,佔地積超過1 . 9萬平方英尺,其中的"雪茄"休息廳全部裝備了真皮扶手椅。
  6. Application estate counterpoises initiative register should submit following document : ? one, land access belongs to a proof ; ? 2, building permit ; ? 3, construction permit ; ? 4, building complete checks and accept card ; ? 5, the book of complete settle accounts with the authorized orgnaization that appoints via municipal government ; ? 6, complete of building design general layout, building pursues ( include monomer to build plane, establish ) of face, profile ; ? 7, the measurement that the mechanism that register approbates orgnaization transaction of issued on - the - spot mapping result

    申請房地產權初始登記應提交下列文件: ?一、土地使用權屬證實; ?二、建築許可證; ?三、施工許可證; ?四、建築物工驗收證; ?五、經市政府指定的機構審定的工結算書; ?六、建築設計總平圖、建築物工圖(包括單體建築平、立、剖圖) ; ?七、登記機關認可的測量機構出具的實地測繪結果報告書。
  7. In 2002, the company was awarded as no. 8 of the " 20 tops of real estate developers in 2002 " by jinan development removal management office for its outstanding achievements in development investment, construction acreage, completed acreage and sold acreage. it won the laurel of " jinan real estate enterprise of famous brand in 2002 " for the solid strength and great fame of luneng brand. the company advocates the thoughts of people first and focusing on customers and makes a developer of social responsibility

    2002年度,公司因在開發投資額施工積和銷售積的出色表現被濟南市開發拆遷管理辦公室授予「二二年度房地產開發企業20強」位列第八名「魯能」品牌的雄厚實力和家譽戶曉的知名度,使公司榮獲「二二年度濟南市地產品牌企業」的殊榮公司倡導人本思想一切以顧客為中心,做有社會責任感的開發商,深入人心的誠信經營更為公司贏得「濟南市民最信賴的房地產品牌公司」的美譽, 2002年公司成為濟南市房地產廣告協會理事單位。
  8. Work on the wall stopped at a 200 - foot cliff hanging over a foaming white river

    長城終于工了,終端雄踞在一處高達200英尺的懸崖之上,俯瞰著下白浪滔滔的河流。
  9. With regard to hardware, rigorous stress tests conducted by kcrc indicated that the earth return and surge arresters problems had been resolved after improvement had been made

    硬體方,九鐵進行了的嚴負荷測試證實,經過改良后,電力迴流及限壓器問題已經解決。
  10. Floor space of buildings completed : refers to the floor space of buildings that are completed in the reference period in accordance with the requirements of the design, up to the standard for putting them into use, and have been checked and accepted by concerned departments as qualified ones

    房屋建築積:指在報告期內,按照設計所規定的工程內容全部完成,達到了設計規定的交工條件,經有關部門檢查驗收鑒定合格的房屋建築積。
  11. And so, the gis - based electric cable information management system can administrate transformer substation, switch substation, power distribution room, power cable, silo, canal and high voltage user according to their location, drawings, cable records. the system provides multiple index for query service and statistical electric cable graph and information on properties

    本系統可以實現對變電站、開關站、配電室、電纜、豎井、溝道及高壓用戶等空間位置、圖形資料(包括一次接線圖、工圖、斷圖) 、電纜臺帳信息的綜合管理;並可按多種方式來查詢、檢索、統計電纜圖形及屬性數據信息。
  12. This paper, through the research on the implementing of gaobazhou water conservancy project, demonstrated that the project is technical feasible, economic reasonable, and is conform to the state macro policy in external environment. described the full - aspect management on the design process of gaobazhou water conservancy project, fully demonstrated that the selection of design scheme and the design quality is directly related to the investment, quality and progress control of the project ; described the full - aspect management on the construction process of gaobazhou water conservancy project, discussed the management procedure and manner of supervisor in the construction process, how does the contractor to complete construction task scientifically and reasonably by following the certain supervision procedure based on the contract ; described the management on the procurement of gaobazhou water conservancy project, clarified these cautions to be taken during material and equipment procurement through the discussion on the content of procurement contract ; described the project acceptance and after - event evaluation of gaobazhou water conservancy project, fully defined the content for the final acceptance of the project ; fully described the comprehensive management carried out on gaobazhou water conservancy project, mainly focused on the study of information management, communication management, conflict management and risk management, which ensured the smooth execution of the project

    本文通過對高壩洲水利樞紐工程項目實施的研究,論證了高壩洲水利樞紐工程項目在技術上是可行的,在經濟上是合理的,在外部環境方符合國家的宏觀政策;闡述了高壩洲水利樞紐工程設計過程的全管理,充分論證了設計方案的選擇及設計質量的高低,直接關繫到工程項目的投資、質量和工程進度的控制好壞;闡述了高壩洲水利樞紐工程施工過程的全管理,論述了監理在施工過程中的管理程序和方法,施工單位遵循一定的監理程序,依據施工合同科學合理地完成施工任務;闡述了高壩洲水利樞紐物質設備的采購管理,通過對采購合同內容的論述,明確了物質設備采購時應注意的問題;闡述了高壩洲水利樞紐工程項目驗收及后評價,明確了高壩洲水利樞紐工程項目工驗收的內容;較全地闡述了高壩洲水利樞紐工程項目實施的綜合管理,重點研究了保證高壩洲水利樞紐工程項目順利實施的信息管理、溝通管理、沖突管理和風險管理。
  13. This paper presents a study and analysis of project management organization ' s set up, progress control, quality control, safety control, capital control, bidding management and construction spot management, risk management etc. and on the basis of the study and analysis, a set of strategic plan about project management appropriate for beijing huamao center is worked out

    本文從投資方工程項目管理的角度對北京華貿中心工程項目建設管理模式、組織機構的設立、工程工期控制、質量控制、安全控制、投資控制、工程招投標管理、合同管理、信息管理、施工現場管理、工驗收及項目后評價管理、風險管理等方作了較深入的研究、分析,制定出一整套適合本工程項目特點及市場定位的工程項目的建設管理策劃方案。
  14. The article introduces the basic concepts and common methods of fuzzy mathematics, initially discussing the applications of fuzzy mathematics in the following aspects : 1 ) division of " skidding " strata with grade of membership that are drilled with diamond bits ; 2 ) comprehensive evaluation on the application in evaluation of diamond bits, classification of rock drillability, and evaluation of clay ; 3 ) classification of " hard rock " through fuzzy clustering analysis ; 4 ) estimation of completion time of boreholes and evaluation of underg round water with fuzzy mathematics ; 5 ) identification of new ore areas and option of best water resource area with fuzzy model ; 6 ) option of diamond bits and evaluation on oil field development plan with fuzzy resemble option and the improved calculation method ; ? ) prediction of mud slurry performance and of the amount of surging water in ore pits with fuzzy control ; 8 ) comprehensive evaluation of diamond bits and supporting plan of deep foundation pit with fuzzy optimal theory

    初步探討了以下幾方的應用: 1 )用隸屬度劃分金剛石鉆進「打滑」地層; 2 )綜合評判在金剛石鉆頭評價、巖石可鉆性分級及鉆探造漿粘土評價中的應用; 3 )用模糊聚類分析進行「硬巖石」分類; 4 )用模糊數進行鉆孔工時間預估及地下水質評價; 5 )模糊模式識別在新礦區類型識別和最佳水源地選擇中的應用; 6 )模糊相似選擇及其改進演算法在金剛石鉆頭選擇和油田開發方案評價中的應用; 7 )模糊控制在泥漿性能和礦坑涌水量預測中的應用; 8 )優化理論模型在金剛石鉆頭和深基坑支護方案綜合評價中的應用。
  15. The development of the 716, 000 square - feet in terms of gfa apartment and commercial property project in manzhouli, inner mongolia, is expected to be completed by 2009

    位於內蒙滿州里之公寓及商業物業發展項目提供可建築總樓積達716 , 000平方尺,預期於二零零九年工。
  16. Shanghai people enterprise group power transmission and distribution complete equipment industrial park occupies an area of 1200mu ( 1mu = 1 / 5ha. ), this project is finished and can be used now. at present group imported advanced producing equipments and testing equipments to made this industrial park to be an advanced international level manufacturer

    上海人民企業集團輸配電設備工業園位於上海市奉賢經濟開發區,佔地80萬平方米,一期工程15萬平方米的生產廠房及配套設施已全面竣工交付使用; 2003年,集團斥巨資引進了國際領先水平的生產檢測設備,將輸配電設備產業建設成集團接軌全球化、打造先進製造業基地的龍頭產業。
  17. E work according to quality guidelines of professionalism, precise effective, keeping ahead of this industry, making excellent products that improved the quality and grade of resuns products

    今年,集團公司的規模建設也在迅速拓展,廣州工業園主體工程已全面竣工,投產在即。饒平工業園也已破土動工。
  18. The cement road to the scenic spot has been accomplished

    縣城到景區水泥路鋪設已全面竣工。
  19. Nanjing community center has been topped out and started inner decoration which is expected to be fully completed with all facilities and equipment installed in july 2005

    目前項目已封頂,進入內外部裝修階段,預計今年7月裝修將全面竣工,配套設施也將全到位。
  20. The residence district laid foundation on september 11, 2001 and will be totally completed on june 31, 2005. 1300 residents will move in the district then

    小區於2001年9月11日奠基,全面竣工日期為2005年6月31日,屆時將有1300戶居民入住小區。
分享友人