頂固模 的英文怎麼說

中文拼音 [dǐng]
頂固模 英文
dejecting
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  1. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞式、變形能力、承載能力和角鋼錨的可靠性;分析了層邊節點在張開彎矩作用下的工作性能、破壞式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  2. What ’ s more, this paper takes the effect of crown wall rock and mid - board foundation reinforced parametric variation on tunnel structure stress and stability into account grounded on building typical section model of i wall - rock sector

    另外,本文還通過建立類圍巖地段隧道典型斷面型,分別考慮拱圍巖和中墻地基加參數的變化對隧道結構受力和穩定性的影響。
  3. The chinese part of the firm, beset by deeply hierarchical and deferential behaviour, needs to get people to talk more openly to each other ? even if that means confronting a superior

    聯想在中國國內受困於根深蒂的層級觀念與服從上級的行為式,這里需要廣開言路,即使這意味著撞上級。
  4. Using two - dimensional numerical simulation software, analyze the affect of isolated - trench ' s parameters on the breakdown voltages of three - class bipolar power devices ( whose ideal breakdown voltages correspond to 40v, 70v and 100v ), which include width, depth, isolated material ' s dielectric constant, fixed interface - charge and field plate located at the top of deep - trench termination

    利用二維數值擬軟體分析了影響三類典型應用的雙極功率器件(對應的理想擊穿電壓bv _ ( cro )分別為: 40v , 70v , 100v )擊穿電壓的諸多因素(主要包括阱寬度、阱深度、阱內填充介質、界面定電荷、阱區端場板) 。
  5. Although grouting - lift is a complicated dynamic process, according to the difference of action between the slurry and soil, this process is provided into several static stages in the paper. in every stage, the author expounds the working mechanism and builds the model, to study earth pressure distribution and lift - force magnitude when being grouted

    結合每個階段的特點,進行注漿機理闡述,建立注漿型,探討了注漿過程中土層中壓力分佈規律和升力大小的計算方法,分析了土體抬升的破壞式以及注漿的加效果、升效果和注漿量之間的關系。
  6. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和板分別綁扎並吊裝鋼筋骨架入;拆裝式和液壓式兩種板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  7. Components of injection mould for plastics. ejector retainer or plate

    塑料注射零件.定板.墊板
  8. The plastic qian bing of clamp of a kind of tool, what narrate plastic qian bing to be able to cover the part holding a power of park tool clamp, among them, the integral structure of plastic qian bing wraps synthesis by sub of one horniness model and photograph of sub of one soft qualitative model model, form in its whole structure have one with grasp can cover firm between the handle those who close wear a ministry, its feature depends on : sub of this horniness model is one by on, lower mould shapes directly, in its two side surround motherboard form have wear the side that cover a ministry, the mouth office that equips a ministry in its is formed have wear the side that cover a mouth, and empty section structure is shown to appear empty coping completely in its coping ; narrates weak qualitative plastic data is filled set in aforementioned to wear the side that cover a ministry, wear the side that cover a mouth and top between fully empty section, form soft wrap cladding plasticly character, shape wear the structure that cover a ministry

    一種工具鉗的塑膠鉗柄,所述塑膠鉗柄可套置於工具鉗的握柄處,其中,塑膠鉗柄的整體結構由一硬質塑膠層以及一軟質塑膠層相包合成型,並在其整體結構中形成有一與握柄間可穩套合的穿套部,其特徵在於:該硬質塑膠層為一由上、下直接成型、在其底板兩側邊圍形成有穿套部側邊,在其穿套部的開口處形成有穿套口側邊,以及在其部為一完全透空的部透空區段結構;所述的軟質塑膠材料填設在前述的穿套部側邊、穿套口側邊以及部透空區段間,構成軟質塑膠的包覆層,並成型穿套部結構。
  9. Constructs bit patterns that are used to identify texture coordinate fixed point formats within a flexible vertex format description

    構造用於在彈性點格式說明中標識紋理坐標定點格式的位式。
  10. On the basis of simplified calculation model presented by doctor wangxiaoping, some finite element models are set up. by finite element model program sap93, an analysis of static models of 18m - span and 30m - span w666 acmr in different supporting conditions is made. also a study on the relation between definite support displacement, which reflect variational stiffness of substructure represented by steel column or reinforced concrete column, and load - carrying capacity mechanical performance is made too

    本文以w666金屬拱型波紋屋為研究對象,沿用王小平博士的簡化計算型,對18m 、 30m跨波紋拱兩端不同支座形式(鉸支、支和彈性支座)分別利用有限元計算程序sap93進行計算分析,研究波紋拱在不同跨度,不同支座形式下,不同外荷載作用時對該結構受力性能及穩定承載力的影響,同時分析下部支承鋼柱、鋼筋混凝土柱的剛度變化體現為允許支座位移的大小與結構受力性能及穩定承載力之間的關系。
  11. It was shown that the position of neutral point of pile shaft varied with the consolidation of surrounding soil and the magnitude of pile - head load

    利用該型分析了大面積堆載下,在樁作用大小不同的豎向荷載以及樁側土達到不同結度時再施加樁荷載情況下,樁身摩阻力的發展變化規律。
分享友人