頂斜面 的英文怎麼說

中文拼音 [dǐngxiémiàn]
頂斜面 英文
top bevel
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  1. At the end of the corridor was the dressing room belonging to clarisse and simonne. it was a long, ill - built room under the roof with a garret ceiling and sloping walls

    克拉利瑟和西蒙娜的化妝室在走廊的一端,這間屋子狹長,造得很粗糙,在屋,墻角傾,墻上有裂縫。
  2. A vertical piano cadby with exposed keyboard, its closed coffin supporting a pair of long yellow ladies gloves and an emerald ashtray containing four consumed matches, a partly consumed cigarette and two discoloured ends of cigarettes, its musicrest supporting the music in the key of g natural for voice and piano of love s old sweet song words by g. clifton bingham, composed by j. l. molloy, sung by madam antoinette sterling open at the last page with the final indications ad libitum, forte, pedal, animato, sustained, pedal, ritirando, close

    一架立式鋼琴凱德拜牌205 ,鍵盤露在外。上蓋關得嚴嚴實實,擺著一雙淡黃色婦女用長手套,一隻鮮綠色煙灰缸里是四根燃盡了的火柴,一根吸過一截的香煙,還有兩截變了色的煙蒂。譜架上搭著一本古老甜蜜的情歌g .克利夫頓賓厄姆作詞,詹萊莫洛伊配曲,安托瓦內特斯特林206夫人演唱g大調歌曲
  3. The limited hydrothermal karst and mixed zone beneath the anticline axis controls the porosity distribution of ordovician system and it is anticipated that surroundings of the axis of fold formed by compressional reverse orverthrusting during indo - chinese epoch and the coordinated area of morphology of anticline in the screen of buried hill and that of top surface morphology is the best position for development of the reservoir

    局限的熱液巖溶和裸露的背軸部之下的混合帶對千米橋潛山奧陶系孔隙分佈具有重要控製作用,預期在印支期擠壓逆沖作用形成的背軸部,特別是潛山內幕背形態與潛山形態相互協調的區域,應是儲層發育最好的部位。
  4. She was leaning over, with part of her upper deck above water, and you could see every little chimbly - guy clean and clear, and a chair by the big bell, with an old slouch hat hanging on the back of it, when the flashes come

    這條船已經一側傾,上艙一部分浮在水上。電光一閃,栓煙囪的一根根小鐵鏈看得清清楚楚。還有大鐘旁邊一把椅子,背後還掛著一垂邊的舊帽子。
  5. Yuli brand drive optical network lights and the colourful new torpedo lights product range, is use of new improved power spring - loaded device access by luminous objects bottom cathode metal with top of spring - loaded contacts, contacts larger, use more flexibility, and must change the old generation network light bending of " spring - loaded " installation use error - prone, lean, exposed the defects

    "魚利"牌勁光網標燈及彩光新魚雷燈系列產品採用全新改良的電源彈簧接觸裝置,由發光器底部負極金屬片與彈簧部接觸,接觸更大使用更加靈活方便.傾底解決了老一代網標燈彎尾彈簧安裝使用時易偏差、傾、外露的毛病。
  6. However, when extremely high oblique impacts occurred ( 55 degrees or more ), as on turret roofs and decks, face - hardened armor, due to its brittleness, was a very poor choice since it could break and throw pieces into the region behind it even if the shell glanced off

    然而當炮彈以極大的彈著傾角( 55度或以上)擊中炮塔部和甲板時,由於裝甲的脆性,即便炮彈只是擦過,裝甲的背也會破碎飛散,這時表硬化裝甲便是個拙劣的選擇了。
  7. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再板的施工順序和向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  8. Application of type built - up roof beam in face of steep coal seam

    型組合梁在急傾採煤工作的應用
  9. Suspend - dome is a new multiplex structure system composed of single - layer spherical latticed shell above, prestressed cables below and braces bars used to link them. compared with single - layer latticed shell and cable dome, suspend - dome can cross a larger span economically and reasonably

    弦支穹( suspen - dome )是由上部的單層球網殼,下部的預應力環索和索以及聯系二者的撐桿組成的一種新型的復合結構體系。
  10. Large water tanks at the tops of buildings could act as mass dampers to counteract any swaying from extreme lateral loads and as reservoirs for deluging fires

    上裝設大型儲水槽,可以發揮質量阻尼器的功能,抵消因為側負載過重導致的傾,此外,也可以用來撲滅大火。
  11. Management method to increase mining ratio of incline working face with caving

    煤工作提高采出率的管理辦法
  12. Owing to the cant of the vessel, the masts hung far out over the water, and from my perch on the cross - trees i had nothing below me but the surface of the bay

    由於船身的傾,桅桿都伸出水上方很遠。我坐在桅橫桁上,下只有一灣海水。
  13. Abstract : by means of the basic climatic principle and the local astronomical parameters the optimal dip angle, maximum wind pressure borne by the roof material, the depth of the cold - proof ditch and the suitable distance between the greenhouses in chengdu area are calculated

    文摘:應用氣侯學基本原理,當地天文參數與氣候資料,計算了成都地區節能日光溫室採光最佳傾角,覆蓋材料承受最大風壓,防寒溝深度及溫室間適宜距離。
  14. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州長江公路大橋拉橋施工過程各狀態和成橋恆載狀態下,拉索索力、主梁線形、主梁關鍵截應變、索塔塔水平偏位等關鍵項目的施工控制結果均滿足設計期望值的要求,滿足橋梁施工范圍的要求,大橋主梁線形流暢,拉索、主梁和索塔三大體系的受力狀態合理,橋梁結構安全可靠,大橋的監測監控取得了圓滿成功,並為該橋營運階段的長期監測監控奠定了良好的基礎。
  15. This was much less likely with soft homogeneous armor that could dent and tear slowly, easing the shell away and staying more intact, with few pieces torn off

    然而當炮彈以極大的彈著傾角( 55度或以上)擊中炮塔部和甲板時,由於裝甲的脆性,即便炮彈只是擦過,裝甲的背也會破碎飛散,這時表硬化裝甲便是個拙劣的選擇了。
  16. We will make the lifter and ( inner ) slider in this position, will that be a problem

    產品裏的這個位置我們打算做或內行位,有問題嗎?
  17. The angular lifter interferes with the boss during ejection. please consider changing the position of the boss

    與後的柱位空間太小,在運動時會干涉到柱子,能移動這個柱子的位置嗎?
  18. A structure with a single - pitch roof that is attached to the side of a building as a wing or an extension

    搭連主墻有一的構造,邊接在建築物側作為側廳或延伸物
  19. The park, sprawling over 3, 000 square metres 32, 290 sq ft of desert land in the gulf city of dubai, will include ski - lifts to take guests to five slopes of varying height and steepness. the resort with artificial snow will form part of a recently opened shopping complex, billed as the world ' s largest mall

    迪拜是一座位於波斯灣沿岸的城市,而這家滑雪場則建造于該市所屬的沙漠地帶內,其佔地積超過了3000平方米,場內安裝的索道將會把遊客送到擁有不同高度和傾角度的5條雪道的端。
  20. Talking about the roof management at slope thick seam blast mining surface

    淺談傾厚煤層炮采工作板管理
分享友人