頂注法 的英文怎麼說

中文拼音 [dǐngzhù]
頂注法 英文
direct teeming; topouring
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ動詞1 (灌入) pour; irrigate 2 (集中) concentrate on; fix on; focus on 3 (用文字來解釋字句)...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  1. Answer : " law of 10 " word : crack side of apical towards the left from buttock or on the right side of equalize is horizontal, make one perpendicular bisector from qia ji apogee next, will coxal cent is 4 quadrant, quadrant goes up outside its and escape an internal angle ( connect a line to big rotor from the thorn on qia hind ) it is inject area namely

    答: "十"字:從臀裂點向左側或右側劃一水平線,然後從髂嵴最高點作一垂直平分線,將臀部分為四個象限,其外上象限並避開內角(從髂後上棘至大轉子連線)即為射區。
  2. Kesteven girls grammar school was an imposing redbrick building, sitting on a hilltop overlooking the centre of the town.

    凱斯蒂文女子文學校是一座引人目的紅磚房,座落在山上,俯瞰城鎮中心。
  3. Although grouting - lift is a complicated dynamic process, according to the difference of action between the slurry and soil, this process is provided into several static stages in the paper. in every stage, the author expounds the working mechanism and builds the model, to study earth pressure distribution and lift - force magnitude when being grouted

    結合每個階段的特點,進行漿機理闡述,建立漿模型,探討了漿過程中土層中壓力分佈規律和升力大小的計算方,分析了土體抬升的破壞模式以及漿的加固效果、升效果和漿量之間的關系。
  4. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方;綜合考慮、優化混凝土配合比,混凝土灌從兩端至中間、先底板、后腹板、再板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方;壓漿、封端、橋面防水層和保護層施工的一些規定和意事項等都是對箱梁製造行之有效的施工技術和施工方,並可為以後類似施工作借鑒。
  5. When anything particularly disagreeable or revolting had to be doneto put ones shoulder to a waggon stuck in the mud, to drag a horse out of a bog by the tail, to flay a horse, to creep into the midst of the french, to walk fifty versts in a dayevery one laughed, and looked to tihon to do it

    每當要做某種困難的和討厭的活的時候,如用肩膀把陷進泥里的大車出來,拽著馬尾巴把馬從泥澤中拉出來,偷偷混入國人中間去,一天要走上五十俄國一俄里等於一六七公里譯者等活兒,人們總是笑嘻嘻地指著吉洪。
  6. A card game in which the players lay wagers on the top card of the dealer ' s pack

    羅一種牌戲,游戲者對莊家一組牌中的張下賭
  7. I followed many of his courses he gave in europe and received all kinds of tantric empowerments and had two or three private meetings with him. a highlight was a 3 - month tantric enlightenment experience in dharamsala india in 1982, where he gave empowerments and commentaries on nearly all major anutara yoga tantra s like guhyasamajy, heruka, red dakini, yamantaka and others

    其中最讓我印象深刻的是1982年于達蘭薩拉一次長達三個月的傳期那時他正傳授各類無上瑜珈密的灌釋如密集金剛勝樂金剛紅色空行母大威德金剛等。
  8. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍堰的全結構模型,相對準確地模擬灌封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊梁、底梁等的應力和變形,並對比吊箱圍堰板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方計算大型施工結構問題具有現實意義。
  9. Study of determination method on water infusion parameters of water pre - infusion treating top coal in fully mechanized sub - level caving mining

    綜放開采預水處理煤的水參數確定方研究
  10. Members expressed concern about the safety of the proposed arrangement to remove asbestos roof sheets in phases

    議員關到,按擬議安排分階段將含石棉的屋蓋板拆除,是否安全的做
  11. You on the beach. it happens but it ' s not very usual, " said jelena mandic, a model from serbia, as she walked past crowds of teenaged girls on the sun - kissed boulevard

    戛納電影節正如火如荼地進行著,世界各地級明星薈萃國戛納的同時,大量渴望被星探發現的年輕人也穿著各式各樣引人目的衣服來到這里。
  12. The main text of the book presents the underlying principle and philosophy of carbon neutral construction. these pages are marked with a globe at the top of the page

    本書的大部分篇章介紹了碳中性建造的基本則和原理。這些章節用地球的形狀標在頁面的部。
  13. The reverse situations that should be changed are that : 1 ) more obedient to existing power structure than to the design target of the system ; 2 ) replacing the national laws by departmental laws ; 3 ) doing things perfunctorily for the present and short of long - term consideration and legal principle concerns

    應改變: ( 1 )過分順從于既有的權力格局而不是服從于制度設計目標; ( 2 )部門立替國家立; ( 3 )在制度建設中以能夠應付眼下矛盾的方案為上策,缺少長遠考慮和對理的關
分享友人