頂面 的英文怎麼說

中文拼音 [dǐngmiàn]
頂面 英文
[寶石] table; top surface
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  1. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出的溫度場和徐變應力場模擬模型理論,編制了高碾壓混凝土壩的三維有限元模擬計算程序,在程序中考慮了各種溫控措施的數值模擬,包括:水管冷卻、冬季保溫、降低混凝土的澆築溫度、夏季混凝土表噴水霧、施工汛期壩頂面過水等。
  2. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟粘土厚度大、可能作為樁基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的勘探手段(如高精度淺層地震勘探、跨孔波速試驗、十字板剪切試驗、旁壓試驗等) ,查明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。
  3. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:柱腳在礎石頂面平擱簡支、柱架榫卯連接、柱高不越間之廣、側腳、生起、斗拱等的構造機理及結構功能進行了量化分析和實驗研究: (一)通過木柱石礎靜摩擦試驗,測定了柱腳與石礎古鏡間的摩擦系數及摩擦力隨上部結構荷載變化的規律; (二)通過單柱承載力試驗,測定了古建築中木柱的受力變形特徵、破壞模式、及模型材料的變形模量、極限承載力、極限變形等參量; (三)通過柱架低周反復荷載試驗,測定了柱架的抗側移剛度、柱架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷載試驗和受壓試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承載力及受力變形規律; (五)通過抬梁式殿堂間架模型振動臺試驗,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  4. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱頂面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方看,在風荷載、地震作用下,肋拱基本滿足要求,個別排架橫梁不滿足要求,肋拱連系梁普遍不滿足要求;計入水平橫槽向地震作用的工況為設計控制工況。
  5. In general, the top surface of the beam is acted upon by transverse loads.

    橫向載荷作用一般認為在梁的頂面上。
  6. The limited hydrothermal karst and mixed zone beneath the anticline axis controls the porosity distribution of ordovician system and it is anticipated that surroundings of the axis of fold formed by compressional reverse orverthrusting during indo - chinese epoch and the coordinated area of morphology of anticline in the screen of buried hill and that of top surface morphology is the best position for development of the reservoir

    局限的熱液巖溶和裸露的背斜軸部之下的混合帶對千米橋潛山奧陶系孔隙分佈具有重要控製作用,預期在印支期擠壓逆沖作用形成的背斜軸部,特別是潛山內幕背斜形態與潛山頂面形態相互協調的區域,應是儲層發育最好的部位。
  7. In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method

    該程序在編制過程中考慮了混凝土分層澆築、施工間歇、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度場及溫度應力場的影響,同時也考慮了水管冷卻、壩體表保溫、控制澆築溫度、施工汛期壩頂面過水等各種溫控措施的數值模擬。
  8. Applying those engineering techniques, at present, the following results are obtained : the ground temperatures on the top and at the bottom of an embankment made of crushed rock are all lower than those of common embankment, so the crushed rock embankment is of great advantage of decreasing embankment temperature, and becomes an effective and initiative engineering measure to protect permafrost ; the crushed rock embankment can actively adjust the temperature difference between south slop and north slop, and mitigate the asymmetry of ground temperature ; the deformation of the crushed rock embankment is less than that of common embankment

    通過以上的施工技術,取得了相應的階段性成果:片石路基片石層頂面、底與路基基底位置處地溫分別低於普通路基相同位置處地溫,片石路基有利於降低路基地溫,是一種有效的主動保護多年凍土工程措施;片石路基在調節路基陰陽坡地溫起到了積極的作用,減輕了路基地溫不對稱性的發生;對比片石路基和普通路基的路基變形量,片石路基的變形量相對較小。
  9. We conclude that the conjunction intensity between the platform and piles has a prominent impact on the deformation on the surface and there exists the " curtain effect " of the pile that weakens the slide tendency to the sea. it is confirmed the most disadvantageous load cases

    通過數值模擬得到以下結論,承臺與樁連結對碼頭頂面的側向位移影響顯著;存在樁的「遮簾作用」 ,它在一定程度上弱化了岸坡土體向海方向的位移趨勢;確定出對碼頭穩定性最不利的工況荷載組合。
  10. Use electrical lift on the feeding table. top of the board and feeder are maintain at the same level, easy for feeding

    送紙臺採用電動升降裝置,使紙板頂面與進紙口保持同一高度,便利於送紙。
  11. Horizontal construction joint shall be set at the top of the slab

    5施工縫留設:水平施工縫留置於板頂面
  12. If you ride with a shorty or half helmet, you are accepting only 39 % of the protection you could obtain

    如果你騎車時是戴著一頂面罩更短的安全帽甚至是瓜皮帽,你只有受到39 %的保護。
  13. And, of course, if you ride wearing a “ novelty ” helmet or no helmet at all then you have none of the protection you could have chosen

    如果你騎車時是戴著一頂面罩更短的安全帽甚至是瓜皮帽,你只有受到39 %的保護。照字上來看,你為什麼要放棄61 %的保護而不選擇一全罩式的安全帽呢?
  14. Being of good quality to ask the front or top surface, stop up head, jade quality bad to ask the back jade have

    玉質地好一叫陽頂面堵頭,玉質地差的一叫陰
  15. Crown of ballast

    道床頂面
  16. Light test capability : top, bottom and side

    能迎合頂面、底或側放射的光電產品。
  17. One winner will receive fifty - two 50 get go

    禮券,和夜將接受50禮券的頂面
  18. Presszoom - all the earnings from the concert will go to

    禮券,和夜將接受50禮券的頂面
  19. A box has a top, a bottom and four sides

    盒子有頂面、底和四個側
  20. Laboratory furniture ; ceramic tiles for laboratory bench tops

    實驗室設備.實驗室工作臺頂面的瓷磚
分享友人