項目進度報告 的英文怎麼說

中文拼音 [xiàngjìnbàogào]
項目進度報告 英文
project progress report
  • : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
  • : Ⅰ名詞1 (眼睛) eye 2 (大項中再分的小項) item 3 [生物學] (把同一綱的生物按彼此相似的特徵分為幾...
  • : 進構詞成分。
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : Ⅰ動詞1 (告知; 報告) report; declare; announce 2 (回答) reply; respond; reciprocate 3 (答謝)...
  • : 告動詞(由上至下告知) officially announce
  • 項目 : item; article; clause; subject of entry; [體育] event
  • 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
  • 報告 : 1. (告訴) report; make known; inform 2. (講演; 書面申請或總結) report; speech; talk; lecture; advisory
  1. All report sections should be coherently linked with a logical " red thread " which runs through from the beginning to the end of the report. a coherent report will, at a minimum, logically include : 1 appropriate background information to introduce the responsibilities, programme areas, operations, issues and environmental management structure of your organization ; 2 a policy that details your organization s commitments to improving performance in relevant environmental areas in light of item 1 ; 3 report contents that relate to each policy commitment and detailed measures initiatives undertaken in the reporting year and or previous years to improve performance to fulfill each commitment ; 4 results of the measures initiatives undertaken and resultant performance levels ; 5 assessment of performance clearly showing whether the performance meets the objectives and targets or not ; 6 follow - up actions and future objectives and targets to clearly demonstrate continual improvement initiatives ; and 7 top management s comments on the organization s future focus and prioritization of environmental issues

    按照常理,一份內容連貫銜接的最少應涵蓋以下內容: 1提供適當的背景資料,介紹機構的職責工作營運事務及環境管理架構2聲明機構的環境方針,詳述機構如何在第1點所述的背景下,承諾促相關環境工作范疇的表現3關于每政策承諾的事,以及詳述在及或之前年為改環境工作表現以實現每政策承諾所採取的措施行動計劃4說明上述措施行動計劃的成果及所達到的表現水平5列述環境工作表現評估結果,清楚顯示是否達到既定標及指標6說明將採取的跟行動和未來的標與指標,明確表示日後會持續推行改善環境表現的行動計劃及7列述高級管理層為機構擬定的未來環保工作重點和處理環境事務的優先次序。
  2. In the report of the sixteenth national congress, the purpose of our country administration system reform is to form an administrative system featuring standardized behaviors, coordinated operation, fairness and transparency, honesty and high efficiency. “ whether of not the government is efficient, it will restrict and influence the failure and success in reform and opening policy and all kinds of building causes, will restrict and influence the realization of the magnificent aim of socialism modernization. ” in

    「政府…是否高效能,直接制約和影響著改革、開放和各建設事業的成敗,直接制約和影響著社會主義現代化這一宏偉標的實現。 」鑒于西方國家政府改革的成功經驗,實施績效管理對于改善政府形象、提升政府效能、促十六大提出行政改革標的實現以及為鞏固改革成果提供深層制保障等方面具有十分重要的意義。
  3. Firstly, the theory summarize of r & d project evaluation and performance measurement are done, the limitation and shortage of traditional evaluation and measurement is pointed out ; afterward, the purpose and content, the methodologies and classify, the basic principle and work procedure, the reporting and organizing are dissertated ; and then, the influence factor and the main parameter of the r & d project performance measurement are analyzed, the index of performance measurement are discussed emphatically, based on this, a dynamic and effective r & d project performance measurement system is developed, it comprises designing, implementing and updating performance measurement systems ; at last, the development current of r & d project evaluation and performance measurement is discussed and the conclusion of this paper is made

    首先,本文對r & d評估和績效測行了理論綜述,指出了傳統評估與測的缺陷與不足;然後,論述了r & d評估的的和內容、方法和分類、基本原則和工作程序、組織與工作;其次,分析了r & d績效測的權變因素和主要參數,重點探討了測指標,並在此基礎上開發了一個動態有效的r & d績效測系統,包括對r & d績效測系統的設計、實施和更新;最後,探討了r & d評估與績效測的發展趨勢並得出了本文的結論。
  4. Sadp - annual progress report

    可持續農業發展
  5. Maintain records of actual project progress and submit progress reports to production planning dept. on a weekly basis, and co - operate with the project dept

    保持記錄實際和每周向生產計劃部遞交並且協調和部的關系。
  6. On the base of venture capital organizations, this paper deduced the major risk factors influencing the decision of venture capital organizations by collecting risk analysis part of investment feasibility report and combining risk evaluation theory of venture capital. using fuzzy classification, these factors are classified as environment risk, technique risk, production risk, market risk, manager quality risk, operation risk, withdraw risk and moral risk. through analyzing the risk factors, a risk evaluations system is built for venture capital project

    本文從風險投資機構的角出發,對風險投資機構的投資可行性的風險分析部分行匯總分析,結合風險評價理論,得到影響風險投資機構投資決策的主要風險因素,然後應用模糊聚類分析法,對這些風險因素行了分類,分類結果為環境風險、技術風險、生產風險、市場風險、管理者素質風險、運營風險、退出風險及道德風險,並對這些風險因素行了分析,以此建立了風險投資的風險評價體系。
  7. In order to make a healthy and smooth progress for the " three simultaneity " work, all local agencies and enterprises concerned, at present, should continue to carry out safety responsibility system, strengthen treatment of hidden accidents and supervision of the " three simultaneity " construction projects and earnestly perform review and registry work for safety pre - evaluation report and safety acceptance appraisal report

    為促電力建設「三同時」工作健康有序發展,當前,各地和各有關企業要繼續抓好落實企業安全生產主體責任、加大事故隱患整改力、加強對建設「三同時」工作的監督指導,以及做好安全預評價和安全驗收評價的評審備案工作。
  8. External milestones are the points where the team and customer review work to date and agree to proceed with the project, appear as a task with a duration of zero work units, and are exposed on customer reports

    外部里程碑是團隊和客戶評審當前工作,並同意繼續的點,它作為持續長為零個工作單元的任務出現,並且公佈於客戶中。
  9. The fund management organ shall inspect the annual progress reports on the projects and the annual reports concerning the management on funded projects

    基金管理機構應當對和年基金資助管理行審查。
  10. A supporting institution shall inspect the annual progress reports concerning the funded projects, check the original records on the implementation of the funded projects, and file the annual reports concerning the management on funded projects to the fund management organ

    依託單位應當審核,查看基金資助實施情況的原始記錄,並向基金管理機構提交年基金資助管理
  11. Article 23 a project principal shall organize and implement the research work in light of the project scheme, make original records on the implementation of the funded project, and submit an annual progress report concerning the project to the fund management organ

    第二十三條負責人應當按照計劃書組織開展研究工作,作好基金資助實施情況的原始記錄,通過依託單位向基金管理機構提交
  12. Certain categories of items controlled by the wassenaar arrangement are subject to post - facto undercut reporting, albeit not a true " no undercut " policy. we believe that these regimes, in addition to our discussions with and demarches to the major potential supplier nations of sensitive exports, have helped preserve the integrity of our export controls - - including vis - a - vis china. conclusion are these u. s. export controls enough

    對于受瓦塞納協議管制的某些種類,在事後必須就此提出,盡管這實際上並不屬于「不干擾」政策。我們相信,除了我們與敏感出口的主要潛在供應國行磋商以及我們對這些國家採取的方針以外,這些制有助於我們維護我國出口管制的完整性,其中包括對中國實行的管制。
  13. 169 we shall also make the project schedule report every day

    我們也將每天提出項目進度報告
  14. To provide up front planning , resource loading and leveling , progress reporting , updated schedule and cost information and analysis of project trends in schedule and cost , thus enabling management to make informed decisions

    管理層決策而提供:計劃,資源配置,,更新表和成本信息,以及分析和成本。
  15. To report to the immediate manager on a regular basis on work progress and to produce the reports

    定期向直接主管領導匯實施並編寫工作
  16. To report to the immediate manager as frequently as required on project progress and to produce the reports for the assigned project

    經常性向直接主管領導匯主管並編寫工作
  17. Progress report on internal audit projects

    內部審核工作項目進度報告
  18. Progress report internal audit projects

    內部審核工作項目進度報告
分享友人