順序程序設計 的英文怎麼說

中文拼音 [shùnchéngshè]
順序程序設計 英文
sequential programming
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 順序 : 1. (次序) plain sequence; subsequence; order; sequence; succession2. (順著次序) in proper order; in turn
  • 程序 : 1 (進行次序) order; procedure; course; sequence; schedule; ground rule; routing process 2 [自動...
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  1. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文分析了國內外水電站自動控制裝置的研究和發展狀況,尤其是國內小型水電站的自動化現狀,針對現有電力部門的需求,並實現了一種單元式的微機自動監控裝置,該裝置不僅實現了對水電站內各種模擬參數和數字信號的實時監測功能,還對水輪發電機組進行了調控,通過與上位機處理的配合,可以實現水電站的自動發電控制、機組啟停;在測量發電機組機端電壓和電流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。
  2. In the process of arithmetic design, newton " method is used to compute power flow of network. graph theory knowledge is used to determine all paths from generator to load. to improve efficiency, thesis use branch expunction method to optimize the node order

    在演算法中,採用牛頓拉夫遜法進行潮流算得到系統潮流分佈,利用圖論原理中的路徑搜索演算法確定了發電機對負荷的供電路徑,此外為了提高潮流跟蹤的算效率,利用了支路消去法進行節點的優化。
  3. A lot of experiments have been done in the process of exploiture soft packaging li - ion battery about how to choice the rational arts and crafts. the content include : how to deal with the collector, add how much pvdf in the material, how long the material need to stirring and the right viscidity, how much condubtivity agent the electrode need, what theckness is best, choice different collectors, the degree of dryness of the electrode, theckness of pressed model, how much electrolyte will be added, placement how long after added the electrolyte, system of formation how to influnce the battery, in formation the battery need or not need preesure from outside, how to vacuumize and the optimize matching positive pole and negative pole. with these practice make sure the parameter of the positive pole should less than 90 m ; according to different vacuumize order the conduc - tivity agent in anode will be 5mass % and 9mass %, respectively, and in cathode the data is 2mass % ; every 100mah added to 0. 4 ml electrolyte ; before formation the battery should be placement 8 hours and the system of formation must be less than 0. 01c before the voltage reach to 3. 0v ; should press in outside when battery in formation ; to these batteries which capacity more than 350mah the vacuum time not excess 15s ; the optimize matching positive pole and negative pole between 2. 10 : 1 and 2. 15 : 1. finally make out the battery which cycling performance and security are all very well

    液態軟包裝鋰離子電池的研究主要是對關鍵工藝進行了優化,具體包括:集流體的處理、 pvdf的加入量、漿料攪拌時間和粘度、導電劑的加入量、電極膜的厚度、不同集流體的選擇、電極膜的乾燥度、壓型的厚度、電解液的加入量、注入電解液后靜置時間的長短、化成制度的影響、化成時電池所具有的壓力影響、抽真空的處理、正負極活性物質的匹配。最後確定出液態軟包裝鋰離子電池最佳工藝參數:正極膜的厚度小於90 m ;根據化成時不同抽真空,確定正極膜中的導電劑的加入量分別為5mass %和9mass % ;負極膜中導電劑的加入量為2mass % ;電解液的加入量為每100mah添加0 . 4ml ;化成前電池的靜置時間應當大於8h ;電池在3 . 0v之前採用小於0 . 01c的化成制度;在化成過中應當施加一定的外部壓力;對於350mah的電池抽真空的延時不應大於15s ;而正負極活性物質的質量比應當在2 . 1 : 1 2 . 15 : 1之間。
  4. To deal with the difference on operating system level, this paper designs a thread - level algorithm based upon priority inheritance protocol to prevent priority inversion. a dynamic priority mapping and scheduling algorithm to achieve strict order is also presented. through analysis of multi - threaded execution order under fixed priority scheduling model, a multithreaded programming model with totally predicable execution order is proposed

    針對各種操作系統的差異,本文提出了基於優先級繼承協議的線級防優先級翻轉演算法,提出了能夠嚴格保的動態優先級映射方法及相關的調度演算法,通過研究固定優先級調度下的多線執行問題,本文還提出了一種執行可預測的多線模式。
  5. First of all, the assembly model of dfa is established and the data structure of the model is proposed ; in order to redesign product and structures and select optimized assembly plans, an assemblability evaluation system is constructed. secondly, assembly process planning is analyzed, including assembly path planning and assembly sequence planning ; and then the thesis brings forward the way of 11 - tuple to represent the movement of assembly / disassembly of assembly elements. in the end, this paper makes an research on the technology of interference checking, raised a kind of algorithm of swift interference checking based on envelops bounding box decomposition, hence, the accuracy and efficiency of the algorithm is improved dramatically

    首先建立了面向裝配的裝配模型,給出了它的數據結構;接著從面向產品結構和裝配工藝過兩方面再的角度,構建了裝配性評價體系;接著闡述裝配工藝規劃技術,包括裝配路徑規劃和裝配規劃;然後提出了11元組法來表示裝配元件的裝拆運動;最後對干涉檢驗技術進行了研究,採用一種基於包容盒逐層的快速干涉檢查演算法,提高演算法的精度和效率。
  6. I also summarized briefly the qualifications for tender agency, factors which would block the development of tender agents and the countermeasures, a nd anticipated the foreground of its development in water conservancy systems of hebei province, and then, i advanced my suggestion on the standardization of tendering and bidding procedures in the relevant projects ; i also analyzed the insufficiencies of decision - making system, documents study and circumstances research in the tenders. at the same time, i introduced the skills and strategies in the tendering and bidding, and advanced my analysis results and suggestions. through the introduction of the procedure from opening to evaluating and deciding the tenders, and the scores registration method on evaluating tenders, i pointed out the status quo and main problems occurred in the tendering and bidding in the construction of water conservancy projects in hebei province, and put forward my suggestion on the system of opening, evaluating and deciding of tender in the projects

    在對招標人、招標代理機構和招標過的法律規定與分析后,指出河北省水利工招標人和河北省工招標代理機構的現狀及存在問題,提出了市場經濟條件下,最合理的招標組織形式為招標代理,並簡述了招標代理機構的資格要求、河北省水利工管理機制中阻礙招標代理機構利發展因素及對策,預測了招標代理制度在河北省水利系統的發展前景,對進一步規范河北省水利工招標活動提出建議;對投標過中存在的投標決策、招標文件研究、投標環境調查不足之處進行了分析,同時介紹了河北省水利工投標報價技巧及策略,對河北省水利工投標活動現狀及存在問題提出規范化的分析和建議;通過對水利工開標、評標、定標運行和河北省水利工評標分辦法的介紹,指出了河北省水利工招標投標定標運行的現狀和存在的問題,提出了河北省水利工開標、評標、定標運行體系的建議。
  7. They include the framework of product long - distance maintenance guiding system, fault diagnose, automatically making of maintenance technics, the query of information and the visual leading. according to b / s model, the author puts forward system structure of product maintenance guiding system based on network. the dissertation introduces the main technologies for the realization of maintenance guiding system, the data structure of product fault and order of disassembly and assembly, and the way to get the preliminary data

    本論文對產品維修向導系統的幾個部分:包括產品維修向導系統的體系結構、故障診斷、維修工藝的自動生成、資源信息查詢和可視化引導的有關技術進行研究;根據web技術b / s模式結構和產品維修過提出基於網路的產品維修向導系統的體系結構;介紹了維修向導系統的具體實現中的一些主要技術和產品故障數據結構、拆裝數據結構的以及這些數據表的原始數據獲得方法;對產品故障診斷採用的決策樹方法作了介紹;重點對產品故障診斷和產品各零部件的拆裝關系以及資源信息的查詢進行了實現;針對轎車卡板式門鎖,開發了產品維修向導系統的實例。
  8. The program of the man - machine interface is designed by the sequential function chart design method the paper presents the sequential function chart of the program. according to the chart the ladder diagram program can be made out easily

    論文用控制人機界面的,給出了人機界面的功能圖,根據功能圖可以很容易地出梯形圖
  9. This article flows the information system take the jilin postal service the design as the research object, first introduced the research background, the significance and the research content, the multianalysis postal service entered the modern age to flow the domain the superiority and the inferiority, disparity and insufficiency, as well as needs to overcome question, expounded the jilin postal service development third party flows condition, was clear about the third party to flow the information system the concept

    提出吉林郵政物流信息系統的總體目標,按照基礎施、技術層、數據層、功能層、服務層的分析吉林郵政物流信息系統各項功能和應用。對吉林郵政物流業務流重新整合,確定訂單管理、倉儲管理、配送管理和結算管理的業務流。藉助數據流圖、 e - r圖、控制矩陣等工具先後完成系統功能、邏輯模型、數據庫和內部控制的
  10. Thus, under the background of mutual communication and involvement on the criminal procedure among all of countries in modern world, we shall follow the international trend, use the native resources, study the advanced experience of foreign countries and make out the more detailed arrangement on procedure and institution, which shall recoustruct the institution that we had lost and make the special immunity of the relatives as witness be reasonable

    因此,在當今世界各國的刑事訴訟制度互相交流、互相融合的形勢下,我國當應國際潮流,充分利用深厚的本土資源,借鑒國外的先進經驗,作出更加詳細具體的和制度,以求重構我國曾經失卻的制度,使得親屬作證特免權制度更趨合理化。
  11. First of all, this article has been clear several concepts about construction cost, development cost and complete cost. the construction cost constructs by the preliminary engineering cost, the infrastructure expense, the construction and installation engineering cost, the necessary facility spends. the development cost constructs by the land cost, constructs the cost, the development indirect expense. the complete cost constructs by development cost and period expense

    針對這一社會熱點問題,本文以長影世紀村一期工為例,從成本控制理論入手,敘述了房地產開發成本構成,按照房地產開發進的先後進行展開,較為詳細地論述了項目前期、規劃階段、招標采購環節、施工階段、銷售環節、期間費用的成本控制措施。
  12. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工、模板工、混凝土工、預應力工、移存梁工、孔道壓漿工、梁體封端工、橋面防水層和保護層工等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  13. In chapter 4 we discuss the design of the high speed and high performance vlsi and its imp1ementation, firstly we ana1yze and compare the features and ru1es of al1 kinds of fft algorithm, adopt complex radix 4 butterfly calcu1ation as basic alu, then discuss all kinds of process architectures, the design thoughts, rule, method, technique way, the characteristics of the design are r4 dit algorithm, pingpong ram design method and pipeline structure between stages. we also analyze the limited word length effect and the method to avoid overflow of the fixed points fft process, bring out the expandable platform mode

    第四章主要討論了高速高性能的快速傅立葉變換處理器的和實現,首先分析和比較了各種快速傅立葉變換演算法的特性和規律,提出基4蝶算的演算法具有最好的性價比,討論了、級聯、并行和陣列的處理結構,闡述了高速高性能快速傅立葉變換處理器時的原則、思路、所採用的技術路線,驗證並測試fft處理器,分析了定點fft處理過由於有限字長效應所產生的量化誤差的范圍及防溢出控制辦法,提出了可擴展平臺模式。
  14. Several key techniques of carving and milling machine cnc system are deeply studied they include : the transformation, data rebuild and interface design of huge volume nc program produced by cam ; the algorithm of cubic parametric spline pre _ interpolation and high speed real time interpolation in the cnc system, which. will gain a much higher surface precision and cutting speed ; methodology and algorithm of movement velocity acceleration control on a real time forecast _ and _ prejudge basis is designed. therefore, a smooth movement is insured. the shake and noise problem caused by non _ uniform pules for driving stepping or servo motor is solved by an improving algorithm to generate uniform pules

    同時,本文對基於統一的pc平臺的雕銑機數控系統中的幾項關鍵技術進行了深入的研究,包括: cam生成加工的傳送、接收、讀取及其加工鏈表的生成和實時重構;對cam生成的離散數據進行三次參數樣條插值和基於累加弦長的三次參數樣條插補控制,保證加工工件表面的精度和光性;具有「前瞻」功能的自動升降速控制方法,保證加工過的平穩性;通過脈沖均勻化,有效地解決加工過中因為脈沖不均勻而引起的震動問題。
  15. Curve smoothing treatment and its nc processing programming for forming dresser

    成型磨削砂輪修整時的曲線光處理及數控加工
  16. Displacement back analysis and optimum design of excavation subsequence in underground engineering are important to reliability analysis of surrounding rock and detail design. in underground engineering the method to determine initial ground stress and mechanical parameters of surrounding rock mass and excavation subsequence is key problem to design and study

    地下工位移反分析及開挖優化是地下工圍巖穩定性分析與施工的重要內容,探討地下工圍巖初始地應力與力學參數以及其開挖施工的確定方法是目前地下工與研究的關鍵問題。
  17. The three - dimensional convective storm numerical model system is based on the three - dimensional convective storm model ( csm3d ) developed in the institute of atmospheric physics ( 1ap ), chinese academy of sciences. this system is an interactive system running in windows operating system and can be used in severe convective cloud numerical simulation and numerical forecast in the system designation, software is programmed in vc + +, fortran and grads. mixed - languages programming ( vc + + and fortran ), multithreading programming, vc + + interface programming and windows shell programming are applied

    使用visualc + +和fortran語言以及grads等軟體,利用vc + +和fortran混合語言編技術、 visualc + +界面編技術、 windowsshell編等多種編技術,基於多線思想,將原來的基於dos操作系統的強對流雲數值模式系統移植到windows操作系統下,理了原系統各個模塊之間的邏輯關系,建立了具有windows風格的友好界面,本系統操作簡單直觀,交互性好,方便使用者的操作。
  18. Node runner is a php application designed to contact network nodes in a specific order based on the description of the node

    這個php應用為按照節點的描述以特定的來連接網路節點。
  19. Node runner - php network monitor - node runner is a php application designed to contact network nodes in a specific order based on the description of the node

    這個php應用為按照節點的描述以特定的來連接網路節點。
  20. Among the attention of many people, school program design contest finals was held on april 14 smoothly

    萬眾矚目當中,校競賽決賽於4月14日利舉行。
分享友人