  1. Article 48 construction enterprises must give accident and casualty insurance to workers engaged in dangerous operations and pay insurance premium for them

    第四十八條建施工企業必為從事危險作業的職工辦理意外傷害保險,支付保險費。
  2. The expert wu liang yong said : " one of the way to prosper the architecture design is to disentomb culture intension. so, to create new architecture style, we should not only study overseas advanced design thoughts, concept and technique, but also make architecture root in national culture

    因此,要創造具有時代性和民族性的建新風格,必在學習國外先進設計思想、觀念和技巧的同時,使之植根于本土文化,使二者融為一體,才能創造出既有時代感又具有鮮明地域特色的新風格。
  3. The result shows that the simply math - model which is pipe add turbine for this kind of system is unsuitable. the only way is that when calculating the transient of the all hinge of this system, the effect of the ground swell must be taken into account, the result shows that the ground swell will be effect the buildings around the river, the ship which run on the river and the transient of this hinge system

    計算結果表明,對此類樞紐系統進行過渡過程模擬計算時,不能簡化為管道加機組的簡單系統進行模擬計算,而必進行計及涌浪的全樞紐過渡過程模擬計算,才能從模擬結果中反應實際存在的涌浪對周圍建物、行船以及樞紐系統的過渡過程的影響。
  4. Fans like mr hovey junior need no encouragement

    不過象霍維這樣熱衷於綠色建的設計師毋鼓動。
  5. Because that historical environment take on complexity and unstability, architecture take on multiplicity, involved bound expand, the architecture indite under the historical environment not only based on knowledge of architecture, city planning, sight environment, but also from the point of view with sociology, history, zoology, economics, aesthetics, environment psychology and body engineering, analyse the

    歷史環境由於具有復雜性,不穩定性,建創作又具有多樣性,涉及的范圍極廣,使歷史環境下的建創作研究不僅要以建學,城市規劃學,景觀環境學的專業知識為基礎,還從社會學,歷史學,生態學,經濟學,美學,環境心理學,人體工程學等各相關學科的角度,分析其對建創作的影響和要求,並綜合考慮。
  6. Source of every business land belongs to administrative transfer or the estate of derate price money mortgages, the basis concerns a provision, its area structure has registered legally, can agree alone with the building on mortage, when punish pawn, must entrust city to praedial auction undertakes auctioning all right or be sold off, praedial auction is in charge of buckling all right hair should fill the price money that make, the estate of every administration, institution, do not get do sth without authorization to offer guaranty to assure for the enterprise

    凡企業土地來源屬行政劃撥或減免地價款的房地產抵押,根據有關規定,其地面建物已經合法登記的,可同意單獨以房屋作抵押,在處分抵押物時,必委託市不動產拍賣行進行拍賣或變賣,不動產拍賣行負責扣發應補交的地價款,凡行政、事業單位的房地產,不得擅自為企業提供抵押擔保。
  7. The details are included in set no. 2 of as - built drawings for whtcl, which are available for inspection and purchase from the projection co - ordination office. please note that the emission pattern of vitiated air will be affected by proposals for new building development to accommodate the ventilation building of whtcl

    這些詳情載于西區海底隧道有限公司的第2套竣工圖則。這些圖則可在發展統籌辦公室查閱及購買。在此提出,就設置西區海底隧道的通風大樓的新建物發展而提出的建議,將會影響濁氣的排放模式。
  8. His idea was that the army should move into a position away from the petersburg and moscow roads, and, united there, await the enemy. it was evident that this project had been formed by armfeldt long before, and that he brought it forward now not so much with the object of meeting the present problem, to which it presented no solution, as of seizing the opportunity of explaining its merits

    在通往彼得堡和莫斯科的大路旁構陣地,他認為必在那裡集結軍隊,以等待敵人,這樣才能擺脫現有的困境。看來這個計劃阿姆菲爾德早已擬好,他現在陳述它,與其說目的是為了對提案予以解答實際並未解答,不如說是趁機發表這個方案。
  9. 5 the person ( s ) in charge of the activity, e. g., plant maintenance, construction, etc., shall ensure that any individual that has the authority and responsibility for the erection, inspection, and disassembly of scaffolding is competent to do so

    負責這類工作的人(例如工廠維修人員、建人員等)必確保有權利和責任從事腳手架安裝、檢查和拆卸的任何人員都必勝任其工作。
  10. Finally, we can not use electric power but the engine of bus or subsidiary engine to drive air compressors of bus air conditions. because the change range of turnaround speed of engine is very wide, that brings difficulties in controlling the rate of flow of cold - producing medium. in the control of bus air - conditions, preventing evaporator from freezing to make the air - conditions work with high efficiency and controlling the temperature of railway carriage are the basic tasks in air - condition control

    與一般的建空調相比,汽車空調的工作環境惡劣,條件差,控制難度要增加很多,主要體現在以下幾個方面:一是車外熱負荷變化大,難以確定控制參數;二是要求空調負荷大,而且要控制空調使其降溫迅速:三,不便於用電力作為動力源,必用汽車發動機或輔助發動機來帶動壓縮機,當採用汽車發動機作為動力源時,由於汽車的車速變化大,發動機轉速的變化可從600r min到4000r min ,壓縮機轉速與發動機轉速成正比,其轉速變化高達7倍,給空調系統製冷劑流量控制帶來困難。
  11. Seawall and sluice are the parts constructed in advance, while final closure is the last part in construction. the hydraulic condition during the final closure process is worse than that during any other processes. and with the compressing of the entrance, the hydraulic condition becomes badly, the drop height of entrance can reach 2 to 3 meter, the maximum velocity of flow even reaches 6 to 8 meter per second and flow condition also becomes complex

    海堤和水閘的修建都是圍海工程先期施工的部分,堵口則是海堤修的最後階段,堵口合龍成敗關繫到圍海工程成敗,由於此階段所遇到的水力條件十分惡劣,口門落差可達2 3m ,流速最大可達到6 8m / s ,且水流極其復雜,根據我國《圍海工程技術規范》規定圍海堵口必進行龍口水力計算。
  12. She visited our echmiadzin cathedral, which impressed her immensely. she admired the old armenian architecture

    隨后所拜訪的聖伊米辛天主教大教堂讓她印象深刻,她對亞美尼亞古老建贊嘆不已。
  13. New government buildings are required to achieve certain energy efficiency standards and targets ; if so, of the details of such requirements ; and

    有否規定新建政府建達致某些能源效益基準及目標若有,有關規定的詳情為何及
  14. We sixth, namely last the responsibility, is responsible for the shareholder, the company certainly must make a profit the growth, must breed the reserve fund, must conduct the research, the development has the risk spirit the plan, pays the wrong price, must prepare in advance for the adverse circumstance, pays the suitable tax money, purchases the new machine, the building new workshop, promotes the new product development new sale plan, we must test the new conception, we after this all responsibilities, the shareholder should obtain the fair return rate, we were determined under the mercy god assistance, we biggest strength completes these duties

    我們的第六個即最後一個責任,是對股東負責,公司一定要獲利成長必孳生準備金必進行研究,開發有冒險精神的方案,支付錯的代價,必為逆境預作準備,支付適當的稅款,購買新機器,建新廠房,推出新產品開發新的銷售計劃,我們必實驗新的構想,我們盡到這一切責任后,股東應該得到公平的報酬率,我們決心在慈悲的上帝協助下,盡我們最大的力量完成這些義務。
  15. Please note that whether the reprovisioned facilities are to be integrated with other buildings of wkcd or not, the divisional fire station, physical training establishment office, and ancillary facilities should be relocated as a unique body within the indicated boundary as shown in plan 13, and the fireboat station and fireboat pier should be relocated to a suitable waterfront site of the development area to the satisfaction of the fire services department, as stated in section 4. 3. 5 ( a ) ( ii ) of volume one of the ifp

    請留意,無論重置設施是否與西九龍文娛藝術區的其他建物結合起來,分區消防總局、體能訓練組辦事處和附屬設施均以獨特建體的形式,重置於圖13所顯示的界線之內。至於滅火輪消防局和滅火輪碼頭,則按發展建議邀請書第一冊第4
  16. Proponents may propose to integrate the divisional fire station, physical training establishment office, ancillary facilities, fireboat station and fireboat pier with other buildings of wkcd, on the conditions that all the requirements stipulated in the ifp are complied with, and that the reprovisioned facilities are properly separated from other facilities of wkcd and provided with independent circulation systems so that they can be operated, maintained and managed independently

    建議者可建議把分區消防總局、體能訓練組辦事處、附屬設施、滅火輪消防局和滅火輪碼頭,與西九龍文娛藝術區的其他建物結合起來,條件是有關建議必符合發展建議邀請書所訂明的一切規定,而重置設施則必與西九龍文娛藝術區的其他設施適當分隔,並且各自設有通道系統,以便可以獨立運作、保養和管理。
  17. Please clarify if the above ifp requirement is still maintained. please also clarify if proponents should not propose any pier structure outside the scheme area requiring reclamation and gazetting under the foreshore and seabed ( reclamations ) ordinance

    請澄清載于發展建議邀請書的上述規定是否維持不變,以及建議者是否不應建議把碼頭構物建於計劃區之外而根據《前濱及海床(填海工程)條例》進行填海及刊登憲報。
  18. A proprietor of a transportation company was sentenced to 160 hours of community service for conspiring to use a false receipt to deceive 42, 290 from a geotechnology firm by claiming that the money had been used for dumping construction waste

    一名運輸公司東主,串謀利用偽造收據,訛稱款項已用作傾倒建廢料,向一間地質科技公司騙取四萬二千二百九十元,被判履行一百六十小時社會服務。
  19. Full range in specification " stainless steel tube fittings " come in 500 more varieties and are increasing in number steadily for architects and designers to choose the fittings and parts specification such as 1, 1 - 14, 1 - 12, 2, 2 - 12 and 3 according to the gravity load requirements. products in pecial specification are available upon your request, we will tailor your need precisely by offering whatsoever specifications you may need

    不銹鋼圓管組合配件,種類八百多種已開發出五百多種產品規格供建師、設計師依其建所必承受之重力,由1 - 14 " 、 1 - 12 " 、 2 " 、 2 - 12 " 、 3 "來選擇所需要的圓管大小。
  20. Contractors are reminded to segregate inert materials from other construction wastes before separate disposal to public fill and landfill. for construction contracts commencing after july 1999, a trip - ticket system has been implemented to avoid illegal dumping and ensure proper disposal of construction and demolition materials

    所有由一九九九年七月以後生效的建合約,均規定承建商必採用新設的運載記錄制度以防止非法棄置建廢料,並確保它們得到妥善處理。