預先加載 的英文怎麼說

中文拼音 [xiānjiāzǎi]
預先加載 英文
preload
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 名詞1 (時間或次序在前的) earlier; before; first; in advance 2 (祖先; 上代) elder generation; ...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 預先 : in advance; beforehand
  1. Based on the terszige and biot theory, initially analyze the economical of this experiment, directly save investment 22 % after compute. after that, computing the settlement of highway foundation, comparing the computing and survey value, the predict formula of vacuum - heaped load combining precompression for designing, this formula show that the distortion law of consolidation progress. at the same time, based on the position and room experiment, analyzes the intension transformation in soft soil and criteria of stabilization control

    在太沙基和比奧固結理論的基礎上,分析了此次試驗的經濟性,經核算直接節約投資22 ,經濟效益十分明顯;隨后對真空堆聯合壓法固軟土路基的沉降量進行了估算,並與實測值作對比分析,得出了真空堆聯合壓下的沉降量估算公式,能反映「真空」固過程的變化規律;同時根據現場和室內試驗,分析了軟土強度的變化,以及給出並驗證了工后沉降控制標準。
  2. During the experiment, the fatigue - loading was paused after fixed fatigue cycle and the white - light speckle patterns were acquired without loading

    在疲勞過程中,按一定的疲勞周次在零荷狀態下停機,並採集試件表面上制備的白光散斑圖。
  3. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術進的砂墊層抬高分級充水壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層抬高分級充水壓法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。
  4. First, the author carried out static experiment on the 1 : 1 model of fixed support beam strengthed by external prestressing and by bonding steel plate

    ,進行了1 1模型的體外應力法和粘鋼法固固端支座梁的靜試驗。
  5. The author designed, made, processed and tested to the plexiglass model and the bridge. then author calculated and analyzed the results, as a result of the computer programs bsas, sap, qjx and nastran. the author researched the force characteristics and structural behavior of large - span prestressed concrete bridges with continuous rigid frame structure, used the advanced theory and technology, materials, arts and crafts to resolve the practical matters in design and construction, to optimize structure, and to provide credible technical data for the design and construction and maintenance of bridges

    本文以吉林省九站松花江特大橋為研究對象,通過有機玻璃模型的設計製作及工和試驗,以及對已竣工通車的實橋荷試驗,利用計算機程序bsas 、 sap 、 qjx及nastran等程序進行理論計算和綜合對比分析,探討大跨徑應力砼連續剛構橋的力學特點和使用性能,運用進的理論、技術、材料、工藝等來解決設計和施工中存在的實際問題,優化結構,並為橋梁的設計、施工及使用維護等提供可靠的技術資料。
  6. Insert a permission request for all the permissions your code must have, and handle up front the load - time failure that occurs if the permissions are not granted

    為您的代碼必須具有的所有權限插入權限請求,並處理在未授予權限時發生的時錯誤。
  7. Specifies the null delivery provider, used to preload the cache

    指定用於預先加載緩存的null傳遞提供程序。
  8. Reads request data from the client when not preloaded by using the specified buffer to read from, byte offset, and maximum bytes

    使用指定的要從中讀取數據的緩沖區、位元組偏移量和最大位元組數從客戶端讀取請求數據(當未預先加載時) 。
  9. Powerpoint comes pre - loaded with a list of commonly misspelled words, which you can customize by adding your own words or removing unwanted ones.

    Powerpoint啟動時預先加載常見拼寫錯誤列表,您可以向其中添自己所需要的單詞或從中刪除不需要的單詞。
  10. At first, this thesis analyzes the main causes in theory, which have effects on the redistribution of internal force and modulation of moment for the bonded post - tensioned partially prestressed concrete frame ( for short prestressed frame ), including the relative height of compressive zone of section ( ), secondary moment and types of load applying. then, this thesis analyzes the test of prestressed frame. then, a method, called curvature - force method, for nonlinear analysis of prestressed frame is put forward

    本文首從理論上分析了影響后張有粘結部分應力混凝土框架(簡稱為應力框架)內力重分佈和彎矩調幅的主要因素,即相對受壓區高度、次彎矩和方式等,並初步分析了兩榀只豎向荷和兩榀既豎向荷水平荷的單層單跨應力框架靜力的試驗。
  11. Another important feature was to allow the characters to move in a seamless environment, without loading time between predetermined small geographical zones, during which the player would be idle

    另一個重要特性是允許玩家在一個無縫的環境中移動,不會出現一些定義的小地理區域的過程,因為在這些時間里,玩家只能停下來等待。
  12. The pfs tender forecast below is published for information purpose only and shall not be construed to imply that prior notice is hereby or will be given by the government of the tender invitation date for any site listed in the forecast

    以下油站用地招標報只供參考,不應詮釋為意味政府在此或將會就招標列的任何一幅土地的招標日期給予事通知。
  13. An index in which the logical order of the index key values is different than the physical order of the corresponding rows in a table. the index contains row locators that point to the storage location of the table data

    1 .多維數據集中的一組操作,用於重新生成多維數據集的結構,將數據到多維結構中,計算匯總信息,並保存計算的聚合。
分享友人