預延時時間 的英文怎麼說

中文拼音 [yánshíshíjiān]
預延時時間 英文
predelay
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  1. This product has obtained gold medals tourism handicraft competition and the titles of consumer ' s trusted products many times. it can get through the blood vessels, stimulate the menstrual flow, strong then the internal organs function, regulate sleep, and delay old and feeble

    穿可打通血脈通徑疏絡,調解人體平衡,增強腎、肝、肺臟功能,改善睡眠,緩衰老,減肥效果明顯,對足指麻木、關節寒腿、胃寒、胃炎、高血壓、肥胖癥等多種疾病的防和治療均有獨特的療效。
  2. For reducing the disadvantageous influence of the the relaxation of strain and the lose of pretension on the structure, the time span of delaying scene torsional moment checx and accurate maintence method are given

    為減少高強螺栓拉應變鬆弛和拉應力損失對結構的不利影響,給出了遲現場扭矩檢測的和正確維護的方法。
  3. As the pre - evaporation time increases, the water flux first decreases then increase, at the 23rd second it reaches the minimum value ; the clearance rates of urea and creatintine increase first then decrease and increase a little at last

    隨著蒸發長,水通量先減小后增大,在235有一最小值;肌肝和尿素去除率均是先升高而後降低然後再稍為升高的趨勢。
  4. According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river

    根據小浪底下游各站沙峰均滯後於洪峰的35場洪水,對沙峰滯後於洪峰的特性進行了剖析,建立了小浪底、花園口、夾河灘、高村、孫口、艾山、利津各河段沙峰滯后與上站洪峰流量、沙峰含沙量、洪水傳播速度、懸移質泥沙群體沉速之的回歸方程,可以用來查補長沙峰滯后,為下游各站沙峰傳播的準確報提供依據。
  5. To cope with the increased burden, the report ' s authors suggest nurse practitioners, physician assistants and hospices pick up some of the workload ; primary - care doctors monitor patients who ' ve finished treatment for recurrence ; older oncologists delay retirement ; more cancer specialists be trained ; and technological advances, such as electronic medical records, be employed to free up more of doctors ' time for patient care

    為了應付日益增加的負擔,該報告的作者建議從業護士,醫師助理和救濟院提升部分工作量;初級保健醫生負責已經完成防腫瘤復發治療病人的監測;老的腫瘤專家遲退休;更多的癌癥專家接受培訓;利用技術進步,例如電子病歷來幫醫生騰出更多的去照顧病人
  6. To methods of financial management, impc should use quantity prediction, should build system of overall budget, especially budget analysis and feedback system, should establish financial management control system

    公司應多採用定量測法。要形成全面算體系,同算的編制要精,要長,並建立算差異分析制度和報告制度。
  7. The thrust tail duration is also longer than predicted by theory.

    推力拖尾所續的也比理論所計的長。
  8. First of all, we bring forward the basic project of tadil, which adapts to combined operations. it is suggested to use tdma ( the abbreviation of time division multiple access ) as the working pattern and utilize the concept of mobile ad hoc network to construct the data link network. aiming at the impact of time delay on data link and the characteristic of cooperative combat under the command of director aircraft, this thesis applies a kind of kalman filtering algorithm in polar coordinates to compensate the error of time delay, and then does the transformation of target motion parameters to obtain the current information of target

    本文結合空軍裝備部某「十五」研課題,圍繞著戰術數據鏈、多機協同多目標攻擊、超機動攻擊、空對地攻擊這四個方面展開了一系列的研究工作:本文首先給出了適應三軍聯合作戰的戰術數據鏈系統的基本方案,建議採用分多址的工作模式,並利用移動自組織網路的概念構建數據鏈網路,同針對數據鏈傳輸信息的遲特性和指揮機指揮下的多機協同作戰特點,應用一種極坐標系下的卡爾曼濾波演算法對該傳輸遲誤差進行補償,並在此基礎上進行目標運動參數的轉換,以獲得目標相對于某無人機的當前運動信息,且利用模擬驗證了方法的有效性。
  9. They should not block the roads by waiting and should follow the instruction of police officers and listen to the radio on the news of the traffic situation

    此外,擬前往機場的市民應留較長的,以免交通誤。警方呼籲市民盡量使用公共交通工具及提早出發。
  10. They should not block the roads by waiting and should follow the instruction of police officers and listen to the radio on the news of the traffic situation. public going to the airport are reminded to reserve more time for their journey

    此外,擬前往機場的市民應留較長的,以免交通誤。警方呼籲市民盡量使用公共交通工具及提早出發。
  11. Hydraulic pile hammer is one of the pile driving machines that drive prefabricated piles into the ground in the construction of pile foundation such as construction, bridge, dock, etc. with the development of science and technology, the prefabricated pile driving machines evolve from block hammer, steam - hammer, diesel hammer to hydraulic hammer. hydraulic pile hammer is one of ideal prefabricated pile driving machines because it can adjust stress waveform, decrease stress peak value, prolong effectual action when it drives piles. hydraulic pile hammer is used widely and formed series in developed countries now

    液壓打樁錘是用於建築、橋梁、碼頭等樁基礎施工中打入制樁的樁工機械。隨著科學技術的進步,制樁施工機械由落錘、汽錘、柴油錘,發展到了液壓打樁錘。用液壓打樁錘打樁,可以調整撞擊應力波波形,減小應力峰值,長有效作用,是一種比較理想的制樁施工機械,目前在發達國家已被廣泛使用,並形成了系列化。
  12. So this paper tries to solve these problems through the following work : first, we select some index to valuate the close - end funds, including income, stability, risk in falling, stocks selecting ability and tuning ability, based on overseas funds valuation methods and domestic market condition ; second, we analyze the stability of all index and form two styles index, which are f and other bad stability index ; then, we form the valuation system, including two - layers index, which are p and factor score ; last, we use this system to analyze the close - end funds which came into existence before 2000 and get the final comparative result. the main intention of this paper is to create the system of valuating close - end funds in our country, which is comprehensive and objective. in my valuation system involving the period from 2000 to 2003, the funds as a whole performs inferior to the stock index

    首先,對國外理論界經典成型的、以及前沿的基金評價指標和評價方法進行了詳細的分析,並結合我國的基金市場狀況,選取了可以衡量基金收益、穩定性、下跌風險、股票選擇能力、機選擇能力等量化指標;其次,根據我國基金分析的需要,採用了諸如基金交易價格、換手率等二級市場表現指標;然後,對這些指標進行了續性分析,檢測這些指標在運用到我國基金市場能否有效測基金未來表現,從而形成了兩類指標:續性很好的s _ p和續性不好的其它所有指標;再次,在以上工作的基礎上形成了由兩個層面的指標構成的我國證券投資基金評價體系: s _ p和因子分析中綜合因子得分值;最後,選取了我國2000年1月1日前成立的23隻封閉式基金作為樣本,並同採用上證a股與深成a股兩個基準組合進行了3年樣本期的實證分析,得出了最終的比較性評價結果。
  13. It is most helpful to adise women in their mid to late 40s that the median age at menopause in nonsmoking women is 52 to 53 years and that symptoms such as hot flashes and longer interals between menses may be the most practical predictors of the approaching cessation of menses

    非吸煙婦女絕經的中位年齡為52到53歲,潮熱癥之類的癥狀及月經周期長是接近月經終止最可行的測因子,對那些將近50歲的婦女說明以上建議是有益的。
  14. It is most helpful to advise women in their mid to late 40s that the median age at menopause in nonsmoking women is 52 to 53 years and that symptoms such as hot flashes and longer intervals between menses may be the most practical predictors of the approaching cessation of menses

    非吸煙婦女絕經的中位年齡為52到53歲,潮熱癥之類的癥狀及月經周期長是接近月經終止最可行的測因子,對那些將近50歲的婦女說明以上建議是有益的。
  15. The use of time delays on these vehicles helps to eliminate transmission and motor damage by providing even and controlled acceleration. the delay is adjustable between 0 to 5 seconds and can be wired independently of other delays or alternatively these delays can be wired in cascade so that it is necessary for the first delay to switch on before the following commences timing etc. suppression is included in the delay circuit to prevent damage by voltage transients

    遲開關可以調整0 ~ 5秒,並可連接數個遲開關來逐步控制連續動作之(復數連接,第一個開關要啟動接下來的開關才會跟著動作)避免電動車起動初期之電力脈沖,達到平順的起步動作,可防電壓無端變動造成之電路故障
  16. Has the project progressed according to the proposed schedule ? if the answer is “ no ”, please state the reasons and the impact on the project time - line

    計劃是否能按照計劃書定的表進行?如答案是否,請說明計劃誤的原因及對計劃表的影響。
  17. In those experiments wave shapers have been utilized to modify the incident wave so that the condition of constant strain rate is satisfied more sufficiently. the effect of outer factors on the stress equilibrium of early stage in the specimen was analyzed, and the methods to improve the uniformity of stress in specimen at early stage were given. the elastic wave velocity of specimens can be determined by the wave shape fitting of the predicted transmitted wave with the measured transmitted wave at the early stage, furthermore, the shifting - time in shpb data processing can be determined

    在shpb實驗中採用波形整形技術使入射波的上升沿變寬;分析了影響shpb實驗中試件早期應力平衡的外部因素,給出了改善早期應力均勻性的方法;採用透射波的早期估波形與實測波形作對比的方法確定了shpb實驗數據處理中的;因而在實驗中得到了比較準確的應力應變曲線。
  18. As the pre - evaporation time increases, the holes on the membrane surface becomes smaller and less, dense layer is becoming more evident with large and deep holes in supporting layer ; and porosity increases as well - as average hole diameter decreases

    隨著蒸發長,膜表面的孔變小變少,膜的緻密層越來越明顯,支撐層有大而深的孔結構出現。隨著蒸發長,膜的孔隙率上升,平均孔徑下降。
  19. First, calculating time delay and embedding dimension to reconstruct phase space. second, based on chaos theories, the artificial neural network is used to build one - step and multi - steps predictive model. third, combining with an adaptive filter, predictive error is processed so that weak signal is extracted from strong chaotic noise

    研究的內容分為三個方面: ( 1 )確定嵌入維數和重構相空; ( 2 )將混沌理論與人工神經網路結合,建立混沌序列(混沌背景)的一步與多步測模型; ( 3 )結合自適應信號分離器對測誤差進行處理達到檢測微弱信號的目的。
  20. The lst sigle stage time delay unit is a solid state device which delays the operation of an electrical circuit for a preset period. it has been designed for use with contactors on stepped control systems for electric motors such as are used on electric vehicles

    Lst遲開關可以很簡單又容易的控制電動車電路系統之;並可配合連接電磁接觸器來逐步控制行走馬達,可以幫助您省略控制電路板與加速器之損壞費用。
分享友人