預應力平板 的英文怎麼說

中文拼音 [yīngpíngbǎn]
預應力平板 英文
prestressed slab
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  1. In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered

    考慮到梁段以外附近區域的作用,在其兩端面上施加了由面桿系結構分析所得的端面內,另外,索(梁縱向、橫隔梁橫向、斜腹豎向)也施加在相的位置,分析了箱形主梁在自重、索作用下的空間
  2. Additionally, rushing - board brake is parallel - adjusted so that its very convenient for users to adjust it. iii. j53 - 630c model is improved on base of j53 - 630b model, retaining advantages of j53 - 630b model such as air cylinder control, steel structure platform, rushing - board brake and integrated pre - stressing force machine frame

    三j53 - 630c型在j53 - 630b型的基礎上的改進型,保留了j53 - 630b型產品的優點,氣缸操縱,剛結構式臺,推式剎車整體機架。
  3. Simulation on tig welding of aluminum alloy plate and residual stress predicting

    鋁合金鎢極氬弧焊數值模擬與殘余
  4. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模工程、混凝土工程、工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹和頂分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底、后腹、再頂的施工順序和斜向分段、腹分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;變雙控制確保施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  5. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    的支護機理:充分利用巖土層自身或處理的局部的穩定性,隨基坑開挖分層掛鋼筋網噴射砼,以避免土層幫片及巖石邊坡小的節理破碎滑塌,並把土壓傳給錨,由錨桿集中受,通過錨桿的錨固衡土壓
  6. 3. in applications, the structure of stabilizing piles with pre - stressed anchor cables can be associated with retaining wall, combined bolting and shotcrete, precast concrete lagging ( plain, troughlike, archlike shapes ), and so on, which enlarge the application areas of this structure

    3 、在實際用中,錨索抗滑樁可與砌石擋墻、噴錨支護、制擋、槽形、拱形等)聯合作用,形成多種形式的組合結構,從而可擴大這種結構型式的用范圍。
  7. By using a cell equivalent method, the present model can deal with the face - center square structure of erf. combining the scheme of the classical conductivity model for the single - chain structure, a new formula for the prediction of the shear yield stress of erf is set up. the influences of the separation distance of the particles, the volume fraction of the particles and the applied electric field on the shear yield stress are investigated

    在電導模型的基礎上,建立在電流變液體在外加電場的作用下,粒子之間會形成某種特定的微觀結構,利用等效胞元的方法,將這微觀結構等效成一個,建立了等效的微觀結構模型,通過計算電流變液體內部的局部電場,對電流變液體的工作機理和剪切屈服進行了測,並且分別考慮了在不同的粒子間距、不同的粒子濃度、不同的外加電場的情況下,對剪切屈服的影響。
  8. With the typical on - axis fatigue tests to get the relative s - n curves of unidirectional laminates, executed at certain stress ratio, it is possible to predict the fatigue life of multidirectional laminates subjected to cyclic stresses of different stress ratios. this would tremendously reduce test costs for laminate structures

    考慮了層壓中單向層面內多軸的影響,在已知單向在確定比下受典型單軸循環的s - n曲線的基礎上,測任意鋪疊次序層壓結構在不同比的循環載荷下的疲勞壽命。
  9. 3 - wire strands with tensile strength of 1570 mpa were collocated in the lower precast concrete slabs of superposed floor. the manner of reinforcement lap and other detailing were brought forward. plane dimensions of the tested floor are 9m and 12m, and height is 180mm

    本論文通過對前期試驗的分析總結,選用1570mpa的三股鋼絞線作制底鋼筋,提出了合理的側橫向鋼筋搭接方式和其它構造措施,並按照現行規范設計並製作了試驗結構,樓蓋面尺寸9 12m ,樓厚度180mm 。
  10. Abstract : the relations between prestressed reinforcements in two directions and the total balance loading of unbonded prestressed dual concrete slabs are established in the present paper based on the analysis of projects, in which the structural cost is optimized satisfying the requirements of the service state, the ultimate state and constructions

    文摘:本文在對無粘結雙向兩個方向衡荷載分配方案分析的基礎上,建立了以兩個方向筋面積與總衡荷載的關系式,在滿足極限狀態、正常使用極限狀態和構造要求的條件下,使結構的造價達到最佳。
  11. The relations between prestressed reinforcements in two directions and the total balance loading of unbonded prestressed dual concrete slabs are established in the present paper based on the analysis of projects, in which the structural cost is optimized satisfying the requirements of the service state, the ultimate state and constructions

    本文在對無粘結雙向兩個方向衡荷載分配方案分析的基礎上,建立了以兩個方向筋面積與總衡荷載的關系式,在滿足極限狀態、正常使用極限狀態和構造要求的條件下,使結構的造價達到最佳。
  12. Secondly, the writer carried out the calculation on prestressed concrete slabs with openings by yield line theory and got the changes of limit load of openings of different size, different place

    然後,筆者採用屈服線理論對混凝土開孔的極限承載進行計算,得出不同開孔參數對的極限承載
  13. The development of the technology of the prestressed concrete with unbonded tendons has promoted the development of new materials, new structure, new technology, new craftwork. since 1980 the application has ranged from single member to a whole structure such as flat floor, frame, high - story structure, portal rigid frame, special structure and special structure

    無粘結混凝土技術的發展,促進了新材料、新結構、新技術、新工藝的發展,自80年代以來,已從單個混凝土構件發展到混凝土結構:結構、框架結構、門式剛架、高層結構、空間結構及特種結構等。
  14. First, the constitutive model of concrete based on micropiane theory is studied and the constitutive behaviors of high - strength concrete and steel fiber reinforced concrete are described. second, the material nonlinear finite element analysis program of concrete plate, shell and box - section structures is developed. third, the sttuctural behaviors of test beams are simulated by the program developed by the aathol in the first part, the constitutive model of concrete, a key matter of material nonlinear finite element analysis of concrete structure, is studied

    作為整個課題的組成部分,筆者的博士論文中進行了以下幾個方面的研究: ( 1 )基於微面理論的混凝土本構模型的研究和基於該理論的高強混凝土與鋼纖維混凝土本構行為的描述; ( 2 )混凝土、殼及箱型結構非線性有限元分析的研究; ( 3 )高強混凝土變截面箱型連續梁結構行為的數值模擬。
  15. Moreover still the utilization program has been imitated the resisted fire ability that the ordinary flat board was netted to put up, and analyses prestressing force and nets the resisted fire property putting up by way of the contrast, and has found that the prestressing force dull and stereotypedly nets the resisted fire weakness putting up, for prestressing force nets frame application has created the conditional sum basis that is suitable three corresponding calculator programs of establishment all use the model have been verified their correct nature

    另外還利用程序模擬了普通網架的抗火能,通過對比來分析網架的抗火特性,發現了預應力平板網架的抗火弱點,為網架的用創造了適用的條件和依據。編制的三個對計算程序,都利用模型驗證了它們的正確性。實例模型採用了實際的試驗模型,從而為初期計算數據提供了有效驗證。
  16. Abstract : a previously proposed approximate quasi - static theoretical method is employed herein to examine the deformation and perforation of a simply - supported circular plate struck by a flat - faced projectile at normal incidence. based on the principle of virtual work, static load - displacement relationships are first obtained and then used to predict the energy - absorbing capacity of the plate subjected to relatively low speed impact. it is shown that good agreement is obtained between the theoretical predictions and the available experimental data, provided that adiabatic shear plugging failure does not occur, but the influence of strain rate sensitivity is taken into account

    文摘:採用準靜態近似理論方法分析簡支圓頭彈丸正撞下的變形和穿透.首先基於虛功原理得到了靜態荷載位移關系,並將其用於測低速沖擊下圓的能量吸收能.當考慮了材料的變率敏感性,並且不發生絕熱剪切沖塞破壞的前提下,理論測和實驗結果吻合良好
  17. According to construction features of three - span prestressed concrete and continuous rigid frame box with v pier bridge, the paper demonstrates the shell finite element theories, c onstruct the spatial model, and researches its spatial stress and variable regularity under different loads including uniform load, concentrated load and prestressing force wire. morever, the paper studies vibratory modal of three - span prestressed concrete and continuous rigid frame box with v pier bridge, and sets about experimental investigation of the corresponding practical bridge

    本文根據典型的三跨混凝土墩連續剛構橋的特點,提出採用殼有限元法計算理論,建立其空間分析模型,研究該橋在不同荷載(均布恆載、集中活載、束)支承條件下的空間受特性和變化規律:探討了典型三跨混凝土墩連續剛構橋的空間靜動特性及相的振動模態;探索一般的面理論測值與實際空間效的差異,並進行相的試驗研究。