預應力設備 的英文怎麼說

中文拼音 [yīngshèbèi]
預應力設備 英文
stressing equipment
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  1. The gips / gdps series of automatic shut - off valves are safety devices designed to stop the flow of gas when the downstream pressure of the valve reaches a value larger than and / or smaller than the preset operating limit

    升壓感關斷型?與gdps ?降壓感關斷型?系列自動關斷閥為安全計當此閥下游壓達到大於或?和?小於定操作限度的壓值時,來中斷瓦斯流動。
  2. Product introduction : " beifang neoplan " luxury coach series is designed and manufactured after introducing the whole set of technologies, key equipments and fixtures of the neoplan company of germany. with 12meters long prestressed envelope body, with monocoque and space frame, rear - mounted water - cooled engine, air spring suspension, elevating coach body, separate suspension fore axle, 2f power - assisted steering system, 11m3 luggage compartment, external swinging automatic door, warm and cool air conditioner, large complete rubber - laminated windshield, abs system

    產品簡介: 「北方-尼奧普蘭」系列豪華客車是我廠引進德國尼奧普蘭公司全部技術關鍵,夾具計製造的具有世界先進水平的系列豪華客車,具有12米長蒙皮車身,無大樑全承載式車架,後置水冷發動機,空氣彈簧懸掛可升降式車身,獨立懸掛前橋, 2f助轉向系統, 11立方米行李倉,外擺式自動車門,冷暖氣空調,大型全幅夾膠前風擋玻璃, abs系統。
  3. Because the monitoring of electricity equipment is still in the condition of traditional prophylactic test ( monitoring off line ), wordage list and management method of handwork operation, to strengthen the real - time monitoring of the operation state of electricity equipment ( monitoring on line ), find out the anomaly of equipment, monitor and analysis the fault, then take a corresponding measures to lower the fault loss so that we can make the transition between the regulations of periodic repairing equipment and the regulations of reasonable state repair, is the work which the department of power supply and operation make much of

    針對對現有電氣的監測大都還處于傳統的防性試驗(離線監測) 、文字報表、手工操作的管理方式的現狀,加強對電的運行狀態進行實時的監測(在線監測) ,及時發現的異常徵兆、對故障進行診斷分析,並採取相措施,把故障損失降低到最低水平,進而將目前實行的定期檢修制過渡到更為合理的狀態檢修制,一直是供電和運行部門十分重視的工作。
  4. On the other hand, by the statistical analysis of historical flow data, the system can model the network traffic flows, and forecast short - term network flows. after that the system can analyse the network traffic abnormity. by use of the netwok management system and network security facility, we can setup a security infrastructure to monitor flows in real time, predicts the future flows, alarm some abnormal flows, respond to the abnormity automatically and immediately

    論文通過定期採集網路關鍵,包括匯聚層和核心交換層的流量情況,處理后以結構化、層次型的方式保存起來,一方面提供了圖形化的用戶介面,將收集的各種歷史數據和實時數據在其中以圖形的方式直觀地顯示出來,另一方面通過對歷史流量數據的統計分析,從而對網路流量進行建模,短時間測網路流量情況,實現對網路流量異常情況的觀察分析,利用有充分響的網路管理系統和網路安全,構成響警的綜合安全系統。
  5. In this paper, the high - temperature low - cycle fatigue life and fatigue crack propagation life tests are carried on the cylindrical axial symmetry specimens having precrack or non - precrack with different types of notches of 16mnr steel in common use in the petrochemical industry contacting coke drum equipment, the stress / strain and the range of stress / strain of dangerous points are received through stress analysis of the specimens using finite element program under multi - axial stress state. at last, the equations of evaluating the high - temperature low - cycle fatigue life and the fatigue crack propagation life are found through using the least - square regression method

    本文採用無裂紋和帶裂紋環狀缺口圓柱形試樣,進行了石化焦炭塔常用材料16mnr多維狀態下不同缺口形式的高溫低周疲勞總壽命試驗及裂紋擴展壽命試驗,並利用有限元程序對試樣缺口周圍及裂紋尖端附近進行了軸對稱多維狀態下的變場分析,來評價材料不同條件下的高溫低周疲勞總壽命和裂紋擴展壽命,最後利用最小二乘回歸方法,得到了該材料高溫低周疲勞總壽命和裂紋擴展壽命評價方程。
  6. Because the span of the bridge becomes longer and longer, the request of designing, construction, material and equipments should be elevated

    由於橋梁跨度的不斷增大,對大跨度混凝土橋梁的計、施工、材料及等要求亦不斷提高。
  7. In order to make use of labor power, material resources, financial resources, financial resources and natural resources in the panzhihua iron and steel company, to develop the district of high - grade magnetic material and establish magnetic material industry production base in the west region of china, this paper focus on the study of the application technology of hard ferrite pre - sintering material with high - quality

    為充分利用攀鋼現有人、物、財及得天獨厚的自然資源優勢,發展地區高檔磁性材料產業,建中國西部磁性材料產業基地,本文對高檔永磁鐵氧體燒料制用技術進行了研究。永磁鐵氧體特別是高性能永磁鐵氧體材料是當代社會及其發展的基礎功能材料。
  8. To minimize the impact of the overhaul of power generating, transmission equipments on the safety, stability and economic operation of power gird, this paper, aiming at the overhaul demand of lots of equipments, brings forward the practical optimization method for overhaul planning which can adapt to the dynamic changes of the scale of power grid and integrate the load forecast and the balance of power load and power volume into it, therefore solve the key technical problems encountered by using computer to realize the optimization of overhaul planning

    為最大程度減少電網發、輸電檢修對電網安全、穩定、經濟運行的影響,針對電網大量的檢修需求,提出了能適電網規模動態變化,並與電網負荷測、電電量平衡有機結合的實用檢修計劃優化方法,解決了利用計算機實現檢修計劃優化的關鍵技術問題。
  9. After a short - term load forecasting method based analogous and linear extrapolation is proposed, the load forecast and the priority of equipment action are led into static reactive power optimization. the aim function is constructed for the practical situation of power system. on the basis of traditional genetic algorithm the fitness function and the holding of population diversity are improved

    在提出基於相似日和線性外推的短期負荷測新方法的基礎上,將負荷測和動作優先級引入靜態無功優化中,並結合電網實際情況,構造了實用的目標函數,對遺傳演算法的適度函數和群體多樣性的保持進行了改進,採用鄰域搜索運算元增加遺傳演算法的局部尋優能
  10. Machines for the manufacture of constructional products from concrete and calcium - silicate - safety - part 7 : stationary and mobile equipment for long line manufacture of prestressed products

    混凝土和硅酸鹽建築產品用生產機器.安全.第7部分:製品長線法生產用固定和移動
  11. Prestressed bar, anchorage device, construction and cost of civil engineering, evaluation, design, testing, addident analysis of pc structure, mould and reinforcement technology

    土建類鋼材、錨具、、施工與造價;結構評估、工程計、現場測試與事故分析;模板鋼筋技術。
  12. For the statically indeterminate structure of pestressed concrete, it is especially have the favor of the designers by its superiority

    混凝土超靜定結構,更是以其優越的結構性能計人員的青睞。
  13. It is concluded that this technique can rapidly and continuously reflect the operation status of equipments and predict the latent faults in them ; hence it is effective in ensuring the safe and economic operation of power equipments and worth spreading

    最後指出,發電機、變壓器類電的狀態監測和故障診斷技術,可以迅速、連續地反映的運行狀態,示運行存在的潛伏性故障,是保障電安全經濟運行的有措施,推廣。
  14. The instrument has been applied to spot construction for the first time on the construction site of commanding and dispatching center of channeling water from huanghe river in wanjiazhai of shanxi. digital and sensing technology is employed to accomplish the dual open loop control over the tension of prestressing tendon. because the traditional technology of prestressing construction is improved, construction accuracy and efficiency are greatly rais ed

    智能張拉儀是能與普通張拉配套重復使用的智能化顯示與控制儀表,是本課題組研製的專利產品,本文首次在山西省萬家寨引黃工程式控制制調度中心施工現場將智能張拉儀用於現場施工中,利用數字傳感技術實現了對筋張拉的雙重開環控制,改進了傳統的施工工藝,大大提高了施工的精度和效率,從而有效地避免了工程事故的發生。
  15. Based on the actual background of jinhua electric power and the application level of business intelligence ( bi ) technology, the construction objective supplementary decision system of operational analysis in jinhua electric power is determined. the useful data acquired by etl tools will be concentrated in data warehouse or data markets. decision proposal will be made on electric equipments maintenance, reactive power control, electric line operational analysis, equipment defect prevention and control and electric power fault diagnosis by adopting dw, olap and dm technologies

    針對金華電網運行生產的實際情況,結合當今業務智能技術( bi )的用水平,金華電網運行分析輔助決策系統的建目標是:在全局數據中心集中存儲和管理經過清洗、抽取后各種有用信息,並在數據集中的基礎上,採用數據倉庫( dw ) 、聯機事務分析( olap )和數據挖掘( dm )等技術對大量的數據和信息進行分析和挖掘,提出有益於電檢修、電壓無功優化、線路運行分析、缺陷控和故障診斷等的決策建議。
  16. This text through leading into and exchange room power, environment concentrate on administrative system of controlling, it thus can realize supply and possess last state at real - time watch - dog at modernized requirement communication, it is expected that takes place, fix a breakdown, write down and deal with the relevant data, such as integrate management functions, etc. have economized the attendant ' s works and improved the dependability that the power equipment runs, have guaranteed that the security of the communication network is unblocked, it is on duty to realize little people or nobody

    本文通過引入交換機房動、環境集中監控管理系統,從而實現現代化通信要求的電源供實時監控運行狀態、期故障發生、迅速排除故障、記錄和處理相關數據、進行綜合管理等功能。節約了值班人員的調度,提高了動運行的可靠性,保證了通信網路的安全暢通,實現了少人或無人值守。
  17. It is the particular application of modern information technology in civil engineering construction. the research on digital tension technology has important backgrounds of engineering and broad prospects of application. intelligent tension instrument of prestressed concrete is a kind of digitizer with the function of intelligent display and control

    數字化張拉技術是採用數字化直接進行張拉施工的技術,是現代信息技術在土木工程施工中的具體用,該技術的研究有著重要的工程背景與廣闊的用前景。
  18. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加,對加勁梁的架影響大;懸吊結構未完體系(架時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
  19. By fitting reasonable external prestressing tendons to ensure ultimate bearing capacity of the bridge, to ensure stress reserve of the main beam, to reduce effectively principal tensile stress, to renew line state of bridge structure and gradient

    通過合理地置體外束,確保了該橋的極限承載能;增大了主梁的;有效地減少了主拉;恢復了橋面線形和坡度。
  20. Then we also study the effect of string on the dynamical characteristic under the symmetric load and not under the symmetric load as the prestressing is the key making beam string structure the balanceatie system, having large rigidity and embodying the superiority of dynamical characteristic of this structure, this paper studies and conceives how to deteimine the number of the prestressing in each stage of construction and through comparing between the plan of onetime and repeated pulling construction choose the suitable pulling construction plan

    並且本文還研究了在對稱荷載和不對稱荷載兩種工況下,結構的受性能隨豎向撐桿數目、結構垂跨比以及下弦索等參數改變時的變化情況,總結出該結構受方面的特徵,為實際工程計提供依據。鑒于是使張弦梁結構形成自平衡體系、具較大剛度和體現結構性能優勢的關鍵,本文研究和探討了結構施工各階段該大小的確定方法,通過一次張拉與二次張拉方案各項指標的比較,選擇適當的張拉施工方案。
分享友人