預應力鋼索 的英文怎麼說

中文拼音 [yīnggāngsuǒ]
預應力鋼索 英文
prestressed cable
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 鋼名詞(鐵和碳的合金) steel
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • 鋼索 : steel cable; cable; cable wire; steel rope; wire rope鋼索傳動 rope transmission; steel rope drive...
  1. Suitable calibrated dynamometers were used to control the pull in the prestressing cables.

    用合適的標定過的量測計控制預應力鋼索的拉
  2. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、的結構、作用及其在滑坡防治中的用進行了詳細的分析;基於施工現場的地質條件,對錨錨固及錨最佳錨固段長度進行了理論計算;制定了實驗研究方案,進行了前期實驗、現場標定實驗、實地張拉實驗;對兩組結構型式的十組絞線內及總張拉的實驗數據進行了研究,提出了提高錨固性能的措施,以及具體的施工方案和施工工藝。
  3. Steel strip sheaths for prestressing tendons - test methods - to - and - fro bending test

    帶護套.試驗方法.反復彎曲試驗
  4. Steel strip sheaths for prestressing tendons - test methods - determination of flexural behaviour

    帶護套.試驗方法.撓性的測定
  5. Steel strip sheaths for prestressing tendons - test methods - determination of shape and dimensions

    帶護套.試驗方法.形狀及尺寸的測定
  6. Friction sliding cable element for structural analysis of prestressed steel truss

    桁架結構分析中的摩擦滑移單元
  7. The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable

    本文的主要工作是:對國內外結構的發展歷史及現狀作了綜述和總結,指出當前結構工程實踐中存在的主要問題;闡述了結構的受機理,並指出結構的適用范圍和特點;在考慮結構和變位約束的條件下,建立結構優化設計模型;提出多次結構優化設計方法和步驟,採用線性規劃和滿約束準則相結合的優化方法,可優化設計出施加的每一級的大小,並得到結構各部分的優化截面;對多次最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和方法,分別對大跨多次屋架、局部布的水平平行弦桁架、整體布的水平平行弦桁架和局部布的超靜定桁架等算例進行了優化設計,經濟效益明顯;對水平平行弦桁架的幾種施加的方案進行比較,對于局部布只對下弦起到卸載作用,對上弦和腹桿基本不起作用;而整體布除對下弦卸載外,對折點以外部分腹桿也起到卸載作用,經濟效益好於局部布
  8. The influence of some design parameters, such as density of net, rise - span ratio, height of strut, prestressing tension of cable, are analyzed, some economical and reasonable optimized parameters were gotten

    分析了網格密度、矢跨比、撐桿長度、值等設計參數對弦支穹頂各項性能指標的影響,得到了經濟合理的設計參數取值范圍。
  9. Secondly, the basic principle on optimal design of structure is presented. based on the characteristics of aqueduct - stayed optimal design, cable optimization, aqueduct body selection optimization and aqueduct body vertical section optimization are included. the prestresses of cable - stayed, the dimension of aqueduct and the number of reinforcing steel bar are chosen as the design variables

    根據斜拉式渡槽優化設計的特點,本文將槽身優化分為優化、槽身橫斷面優化以及槽身縱斷面優化三個方面進行優化設計,確定斜拉、槽身斷面尺寸、槽身橫向及縱向鉸線配筋數量等槽身設計的主要變量。
  10. Steel strip sheaths for prestressing tendons - test methods - determination of tensile load resistance

    帶護套.試驗方法.抗拉負荷的測定
  11. Steel strip sheaths for prestressing tendons - test methods - determination of lateral load resistance

    帶護套.試驗方法.抗側面負荷的測定
  12. The test data of dongping project, which belongs to beijing - zhuhai highway at guangdong province, are given in this thesis. all the data are drawn to diagrams and compare with the theory compute results of winkler method and continue beam method separately

    本文還對東坪工點的地梁進行了現場試驗,測試了錨外錨,地梁土壓以及梁內筋拉,並繪製成相關數據表和相曲線圖。
  13. In this article the prestessed loss in the prestressed concrete structure will completely be analyzed in the theory. combining with the fourth - hanjiang bridge of xiang - shi freeway in hubei province, the prestressed friction loss of the prestressed steel rope is analyzed ideally and researched experimentally

    本文從理論上對混凝土結構損失做了全面地分析,結合襄樊漢江四橋建設工程,對橋梁預應力鋼索摩阻損失進行了理論分析和試驗研究。
  14. First, to solve the present difficulties in steel - concrete engineering structural analysis and construction supervision and control, steel - concrete coordinating relations for two kinds of heterogeneous material composite members, prestressing cables and concrete, steel tubes and concrete, are studied and deduced by proposing the concepts of both composite members of heterogeneous materials and steel - concrete coordinating relations

    首先,針對混工程結構分析和施工監控中存在的一些難題,在提出混異種材料組合構件和混協作關系概念的基礎上,研究並推導了預應力鋼索與混凝土、管與混凝土兩種異種材料組合構件的混協作關系。
  15. Steel strip sheaths for prestressing tendons - test methods - determination of leaktightness determination of water loss

    帶護套.試驗方法.密閉性的測定水損失的測定
  16. In order to quicken convergence in this paper, the optimal process of pre - stressed steel structure is divide into several parts

    在對結構進行優化的步驟上採取分級優化的方法,縮小了解空間的大小,從而提高了演算法搜效率。
  17. The feasibility and searching ability of improved sga presented in this paper is verified by optimal design example of single pre - stressed steel structure and multiple pre - stressed steel structure

    通過幾個單次或多次結構優化設計實例的計算,驗證了本文演算法的可行性和搜效率的高效性。
  18. The distribution features of the stress fields caused by the pretensioned stresses of bolts and cables, and the effects of steel strip to the bolt pretensioned stress diffusion were analyzed through finite difference numerical modelling

    採用有限差分數值計算軟體分析了不同下錨桿、錨產生的場分佈特徵,以及帶對錨桿擴散的作用。
  19. Products are : super high pressure electric, pneumatic, manual oil pump ; pre - stress jack for the use of coal mine and construction ; steel bar and cable scissor ; all kinds of bolt for safety supporting and bolting ( km19 and km22 bolt have all got the certificate of “ ma ” in china. ) ; cable anchor and bolt test stand ; hydraulic nut scissor and etc

    產品有防爆式超高壓電動、風動、手動油泵;煤礦、建築用張拉千斤頂;筋、絞線切斷器;安全支護用各種錨具( km19 、 km22錨具在國內率先取得煤安證書) ;錨錨具靜載拉伸試驗臺;液壓螺母破切器等。
  20. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜拉橋的主體工程,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、塔和橋墩;用可考慮幾何非線性的桁元模擬斜拉、施工掛藍作為結構單元進行拆裝,參與受計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張拉筋和張拉斜拉
分享友人