預應力成對 的英文怎麼說

中文拼音 [yīngchéngduì]
預應力成對 英文
prestressed double tee
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
  • : Ⅰ動詞1 (回答) answer; reply 2 (對待; 對付) treat; cope with; counter 3 (朝; 向; 面對) be tr...
  1. Prestressed cable truss has some characters of transparency, safety, simplicity, dexterity, and beauty. due to these peculiarities there is a splendid prospect when the structure is used in the glass curtain. therefore, it is becoming warm and important problems to study its structural components and behaviors

    索桁支承體系具有通透、安全、靈活、工藝感強以及環保節能等諸多特點,決定了該體系在點式玻璃幕墻中具有廣闊的用前景,因此,其受性能進行研究,日益為結構工程學科研究的重要方向和熱點問題。
  2. To meet the demands for large space and flexible compartmentation of buildings, laminated vierendeel trusses are adopted in high - position transfer story structures. first the bearing characteristics are analyzed, in which reasonable stiffness ratio of the upper chord, middle chord, and lower chord is derived. then combined with an actual engineering model ( 1 8 similar ratio ), the static loading and pseudo - dynamic tests of two models for laminated vierendeel truss used in transfer story structures are conducted, in which one model adopts reinforced concrete, and the other adopts prestressed concrete and shape steel concrete. seismic behaviors are analyzed, including inter - story displacement, base shear - displacement skeleton curves, and equivalent viscosity - damping curves. a program is programmed to carry out the elasto - plastic dynamic analysis, and displacement time - history curves of the two models are derived. the test and analysis results show that the laminated vierendeel truss with prestressed concrete and shape steel concrete has excellent seismic behaviors. it can solve the disadvantages of laminated vierendeel trusses used in transfer story structures. finally, some design suggestions are put forward, which can be referenced by similar engineering

    為滿足建築物大空間和靈活隔斷要求,在高位轉換層結構中採用迭層空腹桁架結構.首先分析了其受性能,得出了空腹桁架各構件合理的截面剛度以及布局形式.然後結合一實際工程,進行了兩榀迭層空腹桁架轉換結構模型( 1 : 8相似比)的豎向荷載下靜試驗以及擬動試驗.其中一榀為普通混凝土迭層空腹桁架,另一榀配置了和鋼骨混凝土,比分析了兩模型的層間位移比、骨架曲線以及等效粘質阻系數等抗震性能的比較,並進行了彈塑性動分析.試驗和分析結果表明,配置和型鋼混凝土的迭層空腹桁架轉換結構具有良好的抗震性能,可以功地解決迭層空腹桁架作為轉換層結構所產生的弊端問題,最後這類轉換層結構提出了相的設計建議
  3. The cable - strut tensile structures are the self - stress equilibrium systems composed by tensional cables and struts. in this paper, the basic concept of the structures was described. the analysis methods of the structural characteristics ( statically and kinematically determinate or indeterminate ) and the geometrical stability were presented. it is indicated that the cable - strut tensile structures are in stable equilibrium with first - order infinitesimal mechanisms. the ranks of equilibrium matrix were calculated by employing the singular value decomposition, and the independent modes of inextensional mechanisms and the states of self - stress were also obtained in the same way. this paper contains some typical examples which illustrate all of the main points of the work

    索桿張結構是指由張索和壓桿組的、具有自平衡的新穎結構體系.本文詳細闡述這種結構的基本概念和結構特徵,討論結構靜動定體系特性和幾何穩定性判定分析方法,指出索桿張結構具有一階無窮小機構的幾何穩定體系.文中採用奇異值分解方法計算結構平衡矩陣的秩,並計算獨立機構位移模態和自模態.最後,幾種典型的索桿張結構進行了算例分析
  4. The prestress in the structure have two functions : on the construction process, the prestress keeps the structures to be formed ; but on the initial equilibrium state, the prestress changes the force in the members and keep cable do not out of work

    提出了結構的作用有兩個:在施工形階段,的作用為保證結構能夠施工形;而在施工形后,的作用主要是改變結構中各構件的內分佈,同時控制索不要退出工作。
  5. The author hoped professors give some precious advices for the thesis and this technology to develop it

    最後學生懇請教授們論文及「錨桿肋梁支護技術」提出寶貴意見,以使該技術能進一步完善熟。
  6. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;變雙控制確保施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  7. This paper attempts to research the seismic behavior of joints between concrete - filled steel tubular core columns and prestressed concrete beams under reversed cyclic loads, in order to make the joints become a good kind of seismic system

    本文旨在鋼管混凝土核心柱與混凝土梁框架節點在低周反復荷載作用下的抗震性能進行研究,以便使這種節點最終為一種完善的抗震體系。
  8. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄洪閘閘墩這一工程實踐,採用國際上已熟的有限元方法,合理地建立了閘墩的三維有限元模型,該模型可方便地按錨索的點位施加錨索張拉,考慮了可能發生的多種荷載工況組合,並與無閘墩結構進行了比分析研究,指出其效果是明顯的,可以大大改善閘墩結構的受狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的果和各荷載下的位移果,這些果的取得閘墩的設計具有一定的指導和參考價值。
  9. The optimization model of the cable tensile force is established, resolving the ideal finished state of considering syntheticly the requirement including the dead load, active load and presress of structure, meanwhile, providing a forward - calculating method for determining the rational construction state on the foundation of the optimization model. on the other hand how to determine and adjust the important parameter, the cable midst tensile forces and the main feam form setting levels in constructing cable - stayed bridge, has also been analyzed, besides, the corresponding calculation method is introduced and applied to the actual construction controlling of xian tao han jiang highway bridge well

    本文以仙桃漢江公路大橋為工程背景在斜拉橋設計計算方面進行了的研究,建立了斜拉橋索優化模型,一方面解決了能綜合考慮結構恆載、活載及等多方面因素的理想橋狀態確定問題;另一方面在確定合理施工受狀態問題上提出了一套以索優化模型為基礎的正裝計演算法。同時斜拉橋施工中關鍵參數斜拉索中間索和主梁立模標高的確定和調整做了進一步的分析,提供了相的計算方法,並用於仙桃漢江公路大橋施工控制過程中,取得了良好的效果。
  10. The main causes, which have effects on redistribution of internal force in the prestressed frame, including the relative height compressive zone of section, secondary moment and types of load applying are taken into account. the horizontal braces force which results from the tension of the prestressing steel, reduces the pre - compress stress is analyzed

    並且探討了各影響因素框架梁截面延性的影響和由於柱的抗側剛度在鋼筋張拉時約束梁的軸向變形,從而影響在梁中的建立所造的梁中軸向的損失。
  11. Then on the basis of calculating result from the prefigurative deviation control structure calculation, " rational data forecast processing about error adjust in prefigurative deviation control was made by the prefigurative theory of bp neural network and corresponding program and software matlab6. 1. at last via the data comparison with the practical survey data draw a conclusion : it is feasible for the construction prefigurative deviation control and error adjust used in pc rigid frame bridges to use the calculation model and program brought forward in this paper

    同時,在混凝土剛構橋施工過程線形拱度控制的結構計算分析的基礎上,利用bp神經網路的測理論和相的程序及軟體包matlab6 . 1拱度控制中的誤差調整進行了較好的測處理,通過與實際施工數據及橋后測量結果作分析比較,得到結論:運用本論文的計算模型和程序混凝土剛構橋拱度控制過程進武漢理工大學碩士學位論文行結構分析和誤差調整處理是可行。
  12. The paper, in the light of my bureau ' s construction experience and project practice in constructing large span prestressed continuous beam bridge ( continuous rigid frame ) in recent dozens of years, introduces a new thinking about the standardized design of cable - stayed hanging basket and the standardized construction technology of the continuous beam bridge ( continuous rigid frame ), gives the detailed account of a series of construction technique and achievements such as : the development and construction ways of large span continuous beam bridge, the standardized design thinking and operation of cable - stayed hanging basket, the standardized construction technology of the continuous beam bridge ( continuous rigid frame ) etc., meanwhile, it is attached with a whole set of detailed standardized design sample drawings of cable - stayed hanging basket

    本文根據我局十幾年來修建大跨度連續梁(連續剛構)橋的施工經驗和工程實例,介紹了一種斜拉式掛籃標準化設計的新思路及連續梁(連續剛構)橋標準化施工工藝。詳細敘述了大跨度連續梁橋的發展、施工方法、斜拉式掛籃標準化設計思路及做法、連續梁(連續剛構)橋標準化施工工藝等一系列施工技術及果,並附有全套詳細的斜拉式掛藍標準化設計定型圖。同類型橋梁的施工及掛籃設計具有參考價值。
  13. These can make up the shortcoming of slrcp ; 2 3. to study the steel stress development of penstock, ring - form slsfsrcp and horse - shoe slsfsrcp during curing period are monitored. the pre - tension stress due to expansion of self - stressing concrete can be used in design ; 4

    圓形和馬蹄形管道進行了28天養護期內監測,研究了鋼襯鋼筋鋼纖維自混凝土壓管道的自長過程,明確了鋼筋的數值,為此類改性管道設計直接提供依據; 4
  14. The test data of dongping project, which belongs to beijing - zhuhai highway at guangdong province, are given in this thesis. all the data are drawn to diagrams and compare with the theory compute results of winkler method and continue beam method separately

    本文還東坪工點的錨索地梁進行了現場試驗,測試了錨索外錨,地梁土壓以及梁內鋼筋拉,並繪製相關數據表和相曲線圖。
  15. Finally, with the research results, the author analyzes the two tv tower drums : the normal concrete tower and the presrtressed concrete tower. at the same time, the calculation reliability of prestressed concrete tower drum and dropping - coefficient of stiffness established in this paper has been proved

    最後,利用本論文的研究果,普通混凝土電視塔和電視塔進行實例分析,驗證了本文建立的塔筒計算公式和剛度降低系數計算公式的可靠性。
  16. Different from the construction of rc, the construction of pc needs high technique. there is a close relation between design and construction, and different manner of construction would result in different internal force of structure

    混凝土結構的施工不同於普通鋼筋混凝土結構的施工,其技術有較高的要求,且結構在設計與施工上關系密切,施工方式的不同有可能造結構內的不同。
  17. The security and dependability of the extra long bridge structure have become the general concern question of the society in these days. because of the influence of the prestressed loss, the real stress does n ' t coincide with the designed stress, that is to say, the calculated stress does n ' t display the condition of the real structure stress properly, and thereby the undiscovered danger leads to the quality of the engineering construction

    特大型橋梁的結構安全可靠性已為當今社會普遍關注的問題。大跨度混凝土橋梁而言,由於損失的影響,結構的實際與設計很難完全吻合,即計算不能很好地反映結構的實際狀態,從而留下安全隱患,嚴重影響了工程建設質量。
  18. Abstract : in this paper, the effect of pre - stress on peen - forming is studied by experiments, the results show that pre - stress can change the relationship between pre - deformation and pre - stress shot peen deformation, and that 0. 05 % 0. 1 % pre - strain is comparetively suitable to improve the spanwise rectilinearity of shot peen - forming configuration surface

    文摘:噴丸形進行了試驗研究,指出可以改變其變形與噴丸變形之間的大小關系,在以改善噴丸型面縱向直線度為主要目的的噴丸形中,變取值0 . 5 / 1000 1 / 1000較為適宜。
  19. Firstly, the domestic researches, which have been reported, are introduced. then the characteristic of the system in estimation of prestressing losses is analyzed by theoretical method, and the reasons that the elimination of tendon is large and test results are not consistent are pointed. using fem software ansys, anchorage zone of pylon are analyzed

    論文首先介紹了國內現階段該問題的一些研究果,然後從理論上分析了小半徑大噸位環向體系在計算損失方面的特點和造張拉伸長量偏大且實測的數據離散性較大的原因,並採用國際權威的有限元分析軟體? ? ansys從理論上進行分析和索塔錨固區最不利節段的足尺寸模型試驗進行校驗。
  20. At present, crack phenomenon always appears in long span prestressed concrete continuous beam bridges used, the reason of which is that the structure prestressed loss is estimated lower

    目前,在部分已建運營的大跨度混凝土連續梁橋的不同部位出現了不同程度的開裂現象,多數是由於施工時結構損失估計不足所造的。
分享友人