預拱 的英文怎麼說

中文拼音 [gǒng]
預拱 英文
camber
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  1. The preparation of breakfast burnt offering : intestinal congestion and premeditative defecation holy of holies : the bath rite of john : the funeral rite of samuel : the advertisement of alexander keyes urim and thummin : the unsubstantial lunch rite of melchizedek : the visit to museum and national library holy place : the bookhunt along bedford row, merchants arch, wellington quay simchath torah : the music in the ormond hotel shira shirim : the altercation with a truculent troglodyte in bernard kiernan s premises holocaust : a blank period of time including a cardrive, a visit to a house of mourning, a leavetaking wilderness : the eroticism produced by feminine exhibitionism rite of onan : the prolonged delivery of mrs mina purefoy heave offering : the visit to the disorderly house of mrs bella cohen, 82 tyrone street, lower, and subsequent brawl and chance medley in beaver street armageddon : nocturnal perambulation to and from the cabman s shelter, butt bridge atonement

    準備早餐燔祭351 ,腸內裝滿以及先想到的排便至聖所352 ,洗澡約翰的儀式353 ,葬禮撒姆耳的儀式354 ,亞歷山大凱斯的廣告火與真理355 ,不豐盛的午餐麥基洗德356 ,訪問博物館和國立圖書館神聖的地方357 ,沿著貝德福德路商賈廊358 ,韋林頓碼頭搜購書籍喜哉法典359 ,奧蒙德飯店裡的音樂歌中之歌360 。在伯納德卡南的酒吧里與橫蠻無理的穴居人361吵嘴燔祭。包括一段空白時間:乘馬車到辦喪事的家362去以及一次訣別曠野363 。
  2. Southeast of the ccsd main hole, there are quite a few such reflectors, implying that eclogite bodies exist in the extension direction of the surface eclogite body

    在ccsd主孔東南方深部重力高部位有多個這樣的形反射,示在地表陡傾榴輝巖的延伸方向還有多個一定規模的隱伏榴輝巖體。
  3. With resonable calculating model and dynamic analysis method, the construction control elevation can be decided and so the precompression difficulty of support can be solved in the construction of large - span arched bridge

    採用精確的計算模型和動態分析技術,一次性給出施工控制標高,解決了大跨度橋有支架施工中支架需要壓的問題。
  4. Static and dynamic behavior of three - span continuous prestressed concrete rigid framed arch bridges without spandrel members

    三跨連續無腹桿應力混凝土剛架橋的靜動力特性
  5. Taking into account hong kong s warm and humid weather, carpenters purposely leave narrow gaps between floorboards to allow for expansion

    由於香港天氣潮濕溫暖,工人鋪地板時會在木條之間留幼縫,以供日後膨脹之用,避免起變形。
  6. Abstract : based on practice, this paper introduced the construction technique of long - span liting and assembling for large - span archy rib refabricated in section, which is a good reference to prefabricate lifting and assembling archy rib with multiple arches and multiple sections

    文摘:結合工程實例,探討了大跨度分段制吊裝肋施工工藝,對多孔多段制纜索吊裝肋施工具有參考價值。
  7. Air cannon block clearer is a special device used to prevent and remove the material blast and block of all kinds of bunker, hopper, cement preheating furnace, pipeline y section and mine drawshaft and drawslope

    空氣炮清堵器是防止和消除各類型料倉,料斗、水泥熱器窯和管道分叉處及礦山溜井、溜坡的物料起,粘倉閉塞等現象的專用裝置。
  8. Dimension testing method of prepared rib - like arch with box section

    箱肋及鋼管製件線形質量現場檢定方法
  9. The bridge has builded by balanced cantilever construction technique. the beam camber of construction is a controlling index of construction quality control. it is nonlinear, and now is not mature forecasting method

    該橋採用節段式懸拼施工法,其施工預拱度的控制是關鍵指標,目前沒有一個成熟測方法。
  10. Combining with the performances of danshan bridge, discussing the methods on the construction controlling and calculation of cable - stayed bridge, this paper raises an efficient construction controlling system, and realizes collecting construction data of the real bridge and technical information. by analyzing on the difference of theoretical calculation and real construction state, the author determines to take self - adapting construction controlling method which uses kalman filter method to identify and adjust construction parameters. by getting rational construction state from forward iteration method, this paper, taking concrete creep effect in consideration, raises a rational scheme to pre - remain deformation and adjust cable force

    結合丹山橋的結構特點,通過對斜拉橋施工控制及結構計算方法的探討,提出了有效的施工控制系統,實現了對實橋施工數據和技術信息的採集;通過分析理論計算與實際施工狀態的差異,確定了以卡爾曼濾波法作為施工參數識別與調整的自適應施工控制方法;通過正裝迭代法確定其合理施工狀態,並考慮混凝土的徐變效應,提出了合理的度和索力調整方案。
  11. In this thesis, aim to the beam axis shape be exactitude for design, the internal force of the beam be appeased by design request, the concept of modem cybernetics is applied, at the same time, the effecting parameter has collected. the paper build the ann model in predicting the beam camber an construction and discuss indetail the extraction of inputting nodes information when quoting the fundamental principle of ann model and introducing research process of the improved bnn. according to them, ann is applied in the construction control of prestressed concrete continuous bridge

    本文以大橋成橋線形滿足設計要求和成橋內力控制在設計容許范圍內為目的,運用現代控制理論的思想,引用神經網路基本原理,詳細介紹bp神經網路的研究過程,從而建立應力混凝土連續梁橋施工預拱度的神經網路模型,並詳細討論了模型的神經網路結點信息的提取,在工程實例的基礎上進行了數值計武漢理工大學碩士學位論文算,數值表明,將神經網路應用於應力混凝土連續梁橋施工控制,獲得了滿意的結果,在應力混凝土連續梁橋施工控制技術研究方面,具有方便有效、精度高的優點,具有良好的應用前景。
  12. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了埋冷卻水管的效果和可行性以及埋冷卻水管的區域。
  13. The results demonstrated that the ann is efficient and the theoretical results fit well with that of forecasting the beam camber in construction

    分析表明該方法是有效的,與實測預拱度結果較吻合。
  14. Then on the basis of calculating result from the prefigurative deviation control structure calculation, " rational data forecast processing about error adjust in prefigurative deviation control was made by the prefigurative theory of bp neural network and corresponding program and software matlab6. 1. at last via the data comparison with the practical survey data draw a conclusion : it is feasible for the construction prefigurative deviation control and error adjust used in pc rigid frame bridges to use the calculation model and program brought forward in this paper

    同時,在對應力混凝土剛構橋施工過程線形預拱度控制的結構計算分析的基礎上,利用bp神經網路的測理論和相應的程序及軟體包matlab6 . 1對預拱度控制中的誤差調整進行了較好的測處理,通過與實際施工數據及成橋后測量結果作分析比較,得到結論:運用本論文的計算模型和程序對應力混凝土剛構橋預拱度控制過程進武漢理工大學碩士學位論文行結構分析和誤差調整處理是可行。
  15. In this essay the technique of the structure calculation and error adjustment measures used in bridge construction prefigurative deviation control was researched based on the construction control and monitor project of wuhan caidian han river bridge

    本文主要結合蔡甸漢江公路大橋的施工監測監控項目,研究施工預拱度控制的結構計算和誤差調整方法。
  16. The deflection ' s computation is complicacy when considered the agents included concrete creep. so we should compare the calculation results with design date before construction to find the problem. we should continually adjust the elevation date in construction control to reduce the error

    考慮徐變后結構的撓度計算是極其復雜的,因為它包含了包括混凝土徐變在內的許多因素,而且即使計算出預拱度,在施工之前也應將計算數據並與設計值比較,從而發現問題。
  17. Not only t he self - weigh of every beam, the prestressing, the compression on the support of form scaffolding, constriction of concrete, creeping are considered when the inter nal force is calculated, but also the result of displacement and deviation of th esupport and precamber should be taken into consideration

    施工階段的內力計算不僅考慮逐段施工梁的自重,加應力,模板支架的支點壓力,以及混凝土的收縮、徐變;同時還應考慮施工程序,施工中的支座位移、支座偏差和預拱度等的影響。
  18. After that, the paper makes a relatively profound study analysis of the structure calculation and error adjust forecast technique used in pc rigid frame bridges construction monitor and control, and comprehensive analyzes of the influence factors in building the bridges, based on the engineering practice

    本論文的其後部分主要是從工程實際出發,對應力混凝土剛構橋施工過程線形預拱度控制的結構計算分析和誤差調整測方面作了較為深入的研究,對應力混凝土剛構橋施工控制過程的影響因素作了全面的分析。
  19. With checking and optimization, some rational suggestions on bridge location, shape and overall arrangement is put forward. after construction checking, the author also puts forward some requests for construction pre - cove and safety pier setting, at the same time gives optimum design on joint balance pier. construction structure checking indicated that not only the strength and stability coefficient of rotation stiffness framework is affluent, but also the section size

    通過驗算及優化,對該橋推薦方案的橋址、武漢理工大學碩士學位論文橋型及橋梁總體布置提出了合理化的建議;通過施工驗算,對施工預拱度及保險墩的設置提出了要求,對交界平衡墩進行了優化設計;施工結構驗算表明,轉體勁性骨架強度、穩定性富餘系數較大,截面幾何尺寸過大,結構設計過于安全保守,並提出了結構優化的方法,從而大大節省了工程投資,加快了工程進度,增強了橋梁的美觀。
  20. A model with some parameters is used to forecasting the beam camber in the construction. based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre - stressed and so on working condition, the model parameters are identified by ann, and the beam camber of different sections are given

    建立施工預拱度的數學模型,根據施工時的應力張拉后等工況橋面實測標高與設計值的差異,用bp神經網路識別預拱度模型的參數,確定有關各截面的預拱值。
分享友人