預裝載 的英文怎麼說

中文拼音 [zhuāngzǎi]
預裝載 英文
preloaded
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 裝載 : freight; loading; shipping; capacity; storage; embarkation; laden
  1. For this reason, the following problems are researched emphatically : firstly, the long - term prediction method for calculating the extreme values of slamming pressure is founded. the effects of sea conditions, ship speeds, traveling directions, loading conditions on the results of long - term prediction are studied. on this basis, the computing process is simplified rationally, so as to this method can be used in practical engineering computations

    為此,本文主要在下面幾個方面進行了探索:首先,建立了底板砰擊極值壓力的長期報方法,通過分析海況、航速、航向角、狀態等不同的影響,合理簡化了長期報的計算過程。
  2. Degassed furnace, sealing furnace, stabilizing oven, mask annealing lehr, blackening furnace, bulb roaster, primary annealing lehr for colour tube funnel, secondary annealing lehr for colour tube funnel, annealing lehr of single - press, annealing lehr of double - press, funnel annealing lehr, colour tube panel annealing lehr, tube - neck sealing and annealing lehr, cut - off machine, necking machine, funnel - loader, lehr preheating unit, neck - loader, funnel auto - pickup, auto - pickup conveyor, funnel auto - loader, neck seal loader, neck - delivery conveyor, rough grinder, fine grinder, fine - polish grinder, panel pickup, button sealing machine, pin sealing machine, funnel annealer loader

    彩管、彩玻設備系列:排氣爐、封接爐、穩定爐、蔭罩退火爐、黑化爐、焙燒爐、彩色玻錐一次退火爐、彩色玻錐二次退火爐、雙壓機退火爐、單壓機退火爐、彩色玻屏退火爐、管頸封接退火爐、割頭機、接頸機、錐置、退火爐置、管頸機、屏自動取出置、自動取出傳送帶、錐自動機、管頸封接機、管頸供給傳送帶、粗研磨機、細研磨機、精拋光研磨機、取屏機、陽極帽封接機、銷釘封接機、錐退火爐機。
  3. Abstract : this paper, by the result of analysis of common accident in stacking - raking machine, puts some measures on prevention to reduce accident

    文摘:通過對耙斗機常見事故的分析,提出了一些防措施。
  4. Pre / postfilters and output filters are a bit of a special case

    /補過濾器插件和輸出過濾器插件的方式有些不同。
  5. This provision applies even when loading on board or shipment on a named vessel is indicated by pre - printed wording on the non - negotiable sea waybill

    即使不可轉讓海運單以先印就的文字表明貨物已由具名船隻運,本規定也適用。
  6. Then the thesis further analyses some core techniques including the system of database, data warehouse and data mining and so on, and presents the frame of function of bank crm. the thesis puts its emphasis on the research on the data preprocessing of data warehouse, data copying, data cleansing, data integration and quality verifying included. finally the thesis discusses the key technology of data warehouse in bank crm - the cleansing of data of customers, and presents some methods of cleansing aiming at noisy values, missing values, conflicting values and duplicated values

    本文在充分分析銀行crm的需求的基礎上,提出了基於數據倉庫的銀行crm系統的體系結構,並進一步分析了該體系結構中客戶數據庫系統、數據倉庫、數據挖掘等核心技術組件的內涵,給出了銀行crm系統的功能構架;重點研究了銀行業務系統多年積累的客戶數據向數據倉庫遷移的處理方法和過程,其過程包括數據復制、數據清洗轉換、數據集成、質量檢驗和數據;最後討論了銀行crm系統應用數據倉庫的關鍵技術:客戶數據清洗,給出了針對噪聲數據、空缺數據、不一致數據和重復數據的清洗方法。
  7. Preparing the store database with an initial load of data from general office

    支持從辦公室原始數據庫里預裝載數據。
  8. The coefficient of compaction is 1. 22 on mechanical loader ; ( 6 ) the analysis settlement of roadbed used the xigeda filler, predict that tolerable settlement is 5. 5cm, total settlement is 11. 4cm, it is meet a criterion ; ( 7 ) the analysis stable of roadbed used the xigeda filler include water and slope the result show the xigeda filler is stable

    採用機攤平,昔格達填料的松鋪系數為1 . 22 ;昔格達填料路堤沉降觀測分析。測昔格達填料工后沉降為5 . 5cm ,總沉降為11 . 4cm ,滿足沉降要求;昔格達路堤水穩定性和邊坡穩定性分析,分析表明昔格達填料路堤是穩定的。
  9. Seller to notify buyer within 3 days after completion of loading giving details number, name of commodity, gross weight, loading date, name of vessel, approximate invoice value, and etx at discharge port

    賣方應于貨物完成後三個工作日內通知買方,內容應詳細註明合約編號,商品名稱,毛重,運日期,船舶名稱,發票概約值,到達卸貨港的估日。
  10. Siffness analysis of cnc heauy duty machine tools preload double pinion rack drive device

    重型數控機床雙齒輪齒條置剛度分析
  11. The cluster service fails to start and generates an event id 1034 in the event log after you replace a failed hard disk, or change drives for the quorum resource

    原因: ? ?如果已取代硬碟,或重新列舉匯流排,則叢集服務可能找不到期的磁碟簽章,而且以後可能會無法該磁碟。
  12. Advances in the techniques for cryopreservation of " musa ". including germplasm embryogenic cell suspension, zygotic embryos and apical meristems over ten years are reviewed ; and the main factors affecting cryopreservation are also mentioned, which include material, pretreatment, loading and dehydrating

    總結了影響香蕉超低溫保存效果的幾個主要因素,主要包括材料、處理、處理以及冰凍保護劑。
  13. The scheme is a three - step optimizing algorithm, its purposes are loading capacity optimization and efficiency of. operationg. with the practical loading restriction, it integrates heuristic algorithms and genetic algorithms, adopts layer loading idea and space partition and combining rule. the optimizing algorithm is composed of combination pretreatment, bottom space optimize and up space optimize. it can satisfy the loading restriction and has practicability

    該方案以空間利用率的優化以及運算效率的提高為目標,根據過程中的實際約束條件,採用分層思想以及空間劃分合併原則,結合啟發式演算法和遺傳演算法,提出三層逐次優化策略:組合處理優化、底層空間優化、上層空間優化。
  14. But in fact, it is not equal for the lashings " parameters. this dissertation starts with computer graphics and put forward the conception of three - dimensional object " s touch or collision. and simulate the course of loading cargo, and solve the issue through that course

    並應用計算機編程模擬貨過程,解決三維物體的觸碰問題,重大件貨物、並在吊過程中顯示船舶的吃水、吃水差、穩心高度和傾角,還有岸吊的水平轉角、豎直轉角及吊索的長度。
  15. I anticipate further optimizations of load - time weaving performance will continue over the next year

    時織入性能在下一年仍然會繼續進一步優化。
  16. Auto pre - charge

    自動預裝載
  17. Article 13 on arrival at a port of a means of transport for carrying animals, the port animal and plant quarantine office shall for the prevention of epidemics adopt on - the - spot preventive measures and conduct disinfection of persons embarking on or disembarking from the means of transport or having contracts with the animals, the means of transport for carrying the animals and the contaminated fields

    第十三條動物的運輸工具抵達口岸時,口岸動植物檢疫機關應當採取現場防措施,對上下運輸工具或者接近動物的人員、動物的運輸工具和被污染的場地作防疫消毒處理。
  18. For example, " access intents " can be specified that enable you to set the read ahead size similar to setfetchsize, read limit similar to setmaxrows, and preload caching similar to joins

    舉例來說,可以指定" access intents "以使您能夠設置前向讀取的長度(類似於setfetchsize ) ,讀取限制(類似於setmaxrows )和預裝載緩存(類似於joins ) 。
  19. This paper applicates the mathematical programming and presents the model of containership optimization, and develops computer procedure of containership prestowage. it discusses the principle and implementation method of the optimize model, including following : the process of containership stowage ; introducing of the blocks ; a strategic planning process and a tactical planning process of containership prestowage ; computing principle and method of buoyancy, stability and strengh, besides checking principle of them

    本文引入數學規劃的方法,建立了集箱船配的優化數學模型,開發了集箱船配計算程序。文章詳細介紹了該優化模型的原理和實現方法,主要內容包括:集箱船的配過程,單元塊的提出和劃分,集箱船戰略配和戰術配,船舶性能計算與校核。
  20. You should cable us the vessel name, estimated loading period, loading capacity, contract number, shipping agent to us 12 days before loading time

    你方應在船隻受期12天前將船名、計受期、量、合同號、船舶代理人電報告知我們。
分享友人