高壓接柱 的英文怎麼說

中文拼音 [gāojiēzhù]
高壓接柱 英文
high tension terminal
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 壓構詞成分。
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • 高壓 : 1 (殘酷迫害; 極度壓制) high handed 2 [氣象學] (高氣壓) high pressure3 (高電壓) high tension...
  1. In the course of working, , the plow will make use of the shuttling method so that it can dig alternately either on the left or on the right. compared to the unilateral plow, it can improve the productivity because it can help leave off the soil 、 take from the consumed energy and reduce the empty journey. to meet the requests above, we will use a remote cylinder with both a small cubage and double functions, approximately designing the plow to be columniform and symmetric. after the experiment for a period in the field, we found that the most frayed areas had happened at the places of both plow shank and share and at the same time the base of the remote cylinder had ruptured suddenly

    與單向犁相比,其優點在於:耕地無開、閉壟,地表平整,降低了耕后整地的能量消耗,減少了地頭的空行程,因而大大提班次生產率。為了滿足犁體梭式作業的要求,我們採用了一隻小容積雙作用的液油缸;同時對犁壁曲面的形狀採用了近似圓形的對稱設計。但經過一段時間的田間試驗,我們發現:該犁犁胸部分的犁脛和犁鏵上的犁尖在工作中磨損較為嚴重;主犁梁和油缸缸體的連部分(即油缸底座)突然發生了斷裂,造成整個犁體無法正常工作。
  2. The system is composed with concrete filled cold - formed square steel tube column, the beam with two cold formed c type steel welded together back to back, the slab with profiled - steel and concrete, the beam and the slab joined into composite steel - concrete beam. they all together make up of the bearing members. and the house also includes the light economical - energy sources heatproof walls

    該體系是以冷彎薄壁方鋼管混凝土為、冷彎薄壁c型鋼背靠背頻焊組成工字型梁、型鋼板上現澆築混凝土組成組合樓板並與梁一起構成組合梁作為承重構件,以輕質節能保溫型墻體作為圍護結構組成。
  3. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:腳在礎石頂面平擱簡支、架榫卯連不越間之廣、側腳、生起、斗拱等的構造機理及結構功能進行了量化分析和實驗研究: (一)通過木石礎靜摩擦試驗,測定了腳與石礎古鏡面間的摩擦系數及摩擦力隨上部結構荷載變化的規律; (二)通過單承載力試驗,測定了古建築中木的受力變形特徵、破壞模式、及模型材料的變形模量、極限承載力、極限變形等參量; (三)通過架低周反復荷載試驗,測定了架的抗側移剛度、架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、架及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷載試驗和受試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗極限承載力及受力變形規律; (五)通過抬梁式殿堂間架模型振動臺試驗,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對腳、頭和斗?層上的屋蓋的地震反應採用多點同步測量,對根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  4. High - voltage feed - through terminals ; bushing studs

    用引線端子.第2部分:套管
  5. And spectators come from all over to watch these strange contests where hoses are connected to fire hydrants, and valves are quickly opened to release that high pressure stream which can knock a person down if they are not careful

    觀眾四處而來觀看這些奇怪的比賽,當場有水管被連到消防龍頭,閥門被迅速打開,釋出如果他們不小心就會被擊倒的
  6. According to the structural characteristic of equipments a nd t he c ondition o f r unning e quipments, t he factors t hat i nfluence t he seismic capability of equipments would include bushings, flanges jointing bushings, bracket, dampers, cables, and so on

    根據電瓷型電氣設備的結構特徵以及設備在運行時的狀態可知,影響設備抗震性能的因素主要包括:瓷、瓷之間的連法蘭、設備支架、設備的減震和隔震裝置、設備之間的導線等。
  7. Piezo - electrical ultrasonic motors were used to drive the linear slideways supported by the cross roller bearings, position information was fed back by the optical encoders, the total closed - loop control system was constituted

    伺服機構採用電超聲電機直驅動由滾導軌支承的直線工作臺,通過精度光柵尺構成全閉環反饋。
  8. The new unit has following technical features : ( 1 ) the unit ' s load is balanced by means of the accumulator and hydraulic cylinder with special structure ; ( 2 ) the installed power of the unit can be reduced greatly by adopting the accumulator ; ( 3 ) variable frequency speed regulation ensures good energy saving effect, and the closed oil circuit requires less hydraulic oil ; ( 4 ) a bi - directional hydraulic lock in the oil circuit ensures the stability and safety of the operation of the pumping unit

    新型機具有4個技術特點: ( 1 )由於活塞塞式液缸的特殊結構和液蓄能器的配合使用,在平衡抽油機大部分載荷時,不需另外增加配重,可減小抽油機體積、質量和佔地面積; ( 2 )抽油機下沖程時,與活塞塞式液缸相連的蓄能器吸收能量,上沖程時儲存在蓄能器中的能量補充載荷上行所需的能量,大幅度降低抽油機裝機功率; ( 3 )利用變頻容積調速節能效率,閉式油路節省液油,同時大大減小液泵站的體積; ( 4 )在閉式油路中採用雙向液鎖可使抽油機的啟停更加平穩、迅速,其工作的穩定性和安全性更好。
  9. Abstract : in this article, some high - rise steel structural lifting methods, including choice of lifting machines, lifting method, measurement and correction of columns and beams, installment of high - strengthen bolts, and welding of pegs of profiling steel boards, are introduced

    文摘:介紹層鋼結構吊裝機械的選擇,樑的吊裝方法和測量校正,強螺栓的安裝,型鋼板栓釘的焊
  10. Year of china digi tal entertainment expo & conference will obtain hall 1 and hall 2 which is 11, 500 sqm each, pillar - free and 11 meters high limits will give more room to exhibitors for booth design. supply canals underneath the floor connected directly to the booths, providing on - site all necessary utilities including power, gas, water, compressed air and various modern telecommunications including isdn, adsl, wireless broadband network and satellite tv

    第二屆中國國際數碼互動娛樂產品及技術應用展覽會將使用面積為11500平米的一號、二號展館。展館為無式結構,凈度11米,展館地槽內鋪設有後勤供應管道,直展位,現場提供所需的電力、縮空氣和各種現代化通訊設施包括isdn 、 adsl 、無線寬帶網和衛星電視。
  11. Results show that low - rise steel frame structures can ignore fracture of bottom beam flange in the low seismic intensity area. 2 build up the finite element model. through comparing the shell element result to the test result, it proved feasible in shell element model to get the behavior of beam - column connections under monotonic and cyclic loads

    2通過試驗結果與有限元模型計算結果的比較,驗證可以用殼元有限元模型來研究樑節點性能,實體有限元模型能很好模擬觸問題和預拉力問題,混凝土有限元模型能夠較好的模擬混凝土結構的抗強度和抗拉強度低的特性。
  12. Which has high strength, good ductility, impact bearing, erode - bearing, besides, its linear expanding coefficient is almost equivalent to concrete, and it has excellent performance - price ratio etc. this paper is related to 8 rc - poles wrapped by gfrp ( sgfw430 ) and rc - poles are compressed axially, in order to analyze the influence of different stick layer over the pole ' s work performance and the influence between three type axial compress ratio ( 0, 0. 8, 1. 1 ) with one layer gfrp with the contrast poles about limit load - bearing capability, failure state, ductility, section stiffness, restrict losing owing to stress - difference

    其具有強度,延性好;抗沖擊、耐腐蝕;線膨脹系數與混凝土近;性能價格比等多個特點。本文通過8根外包單向gfrp ( sgfw430 )的rc組合,以及混凝土對比在軸心荷載作用下的試驗為基礎,具體詳細地分析子在粘貼不同層數的性能玻璃纖維和在不同的軸比( 0 、 0 . 8 、 1 . 1 )下粘貼一層的性能玻璃纖維后混凝土組合相對對比在極限承載能力、破壞形態、延性、截面剛度、應力差帶來的約束損失等方面的變化情況。
分享友人